Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09182027230 June 2009Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46Loop seal
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09176098525 June 2009Owners Activity Report for Refueling Outage
ML09180106625 June 2009ISFSI, Millstone, Units 1, 2, 3 and ISFSI, North Anna, Units 1, 2 and Isfsl, Surry, Units 1 and 2 and Isfsl, SGI and OUO Correspondence Distribution Request Update
ML09188051025 June 2009Update of Information Pertaining to Foreign Interests
ML09190036623 June 2009Comment (36) of C.L. Funderburk on Behalf of Dominion on Draft Regulatory Guide DG-4014, Radiological Surveys and Monitoring During Operations. in Regards to Pr 20,30,40,50,70 and 72, Decommissioning Planning
ML09174023117 June 2009Post Accident Monitoring (Pam) ReportPost Accident Monitoring
ML09160034717 June 2009Request for Additional Information (RAI) of Requested Licensing Action Measurement Uncertainty Recapture (Mur) Power UprateSafe Shutdown
Reserve Station Service Transformer
Operator Manual Action
ML09162042311 June 2009Unit 2, N1-13-NDE-024 and N2-13-NDE-025: Acceptance of Requested Licensing Action Relief Request-Reactor Coolant Pressure Boundary Visual Inspection
ML09135005810 June 2009Fourth 10-Year Inservice Inspection Program - Relief Request CS-001 for Snubber Visual Examination and Functional TestingBoric Acid
Incorporated by reference
ML0913207049 June 2009Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966)
TAC:ME13328 June 2009
ML0915605558 June 2009Notice of Meeting with Virginia Electric and Power Co. (Dominion) to Discuss a Proposed License Amendment Regarding the Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System
ML0915902364 June 2009ISFSI, North Anna, Units 1, 2, & ISFSI, Surry, Units 1, 2, & ISFSI, Kewaunee & ISFSI, Correspondence Distribution Request Change Update
ML0915302272 June 2009March 04, 2009, Generic Fundamentals Examination Section Region II, Participant LetterGeneric Fundamentals Examination
ML09149039629 May 2009Notification of Inspection and Request for InformationOffsite Dose Calculation Manual
ML09152025629 May 2009Notification of Potential Part 21 Re Missing Parts on Asco Solenoid Valves
ML09146058926 May 2009Response to Request for Additional Information for Proposed License Amendment Request Adoption of TSTF-490, Rev 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using The.
ML09131049521 May 2009Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Power Uprate
TAC:ME127612 May 2009
ML09121042612 May 20097th International Conference on NDE - Presentation :a Destructive Validation of NDE Responses of Service-Induced PWSCC Found in North Anna 2 Control Rod Drive Nozzle 31Boric Acid
ML09133023612 May 2009Response to NRC Comments on the Fourth Interval ISI Program
ML09133023212 May 2009Post Accident Monitoring (PAM) ReportPost Accident Monitoring
ML10180017312 May 2009Post Accident Monitoring (PAM) ReportPost Accident Monitoring
ML09132063912 May 2009Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-NDE-024 and N2-I3-NDE-025Boric Acid
Weld Overlay
VT-2
Pressure Boundary Leakage
ML0912503574 May 2009Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005Weld Overlay
ML0912504814 May 200930-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML0912504844 May 2009Fourth Interval ISI Program Response to Request for Information for NDE-004Time of Discovery
Coatings
Through-Wall Leak
ML09126010930 April 2009Bredl V. USNRC No. 09-1112 - Petitioner'S Statement of Issues to Be Raised
IR 05000338/200900229 April 2009IR 05000338-09-002, 05000339-09-002, on 01/01/2009 - 03/31/2009, North Anna Power Station, Units 1 and 2, Routine Integrated Inspection ReportBoric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Water Inventory Control
Weld Overlay
Probabilistic Risk Assessment
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Fire Protection Program
Dissimilar Metal Weld
Power change
ML09127030927 April 2009Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report, January 1, 2008 to December 31, 2008Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
ML09128027427 April 2009ISFSI - Submittal of 2008 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Grace period
Power change
ML09120016727 April 2009Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominion'S Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (Isfsi).
ML09125029521 April 2009Annual Environmental Operating Report for 2008
ML09120070217 April 2009Post-Quench Ductility Results for North Anna High-Burnup 1717 Zirlo Cladding with Intermediate Hydrogen Content
ML09110003917 April 2009Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power StationAging Management
ML09107053917 April 2009Use of Alternative Class 1 Pressure Test Requirements Relief Request SPT-014Hydrostatic
VT-2
ML0911004038 April 2009Comment (1) of Chris L. Funderburk, on Behalf of Dominion Resources Services, Inc., Opposing NRC Regulatory Issue Summary 2009-XX on Implementation of the New Final Rule on Protection of Safeguards Information
ML0909605483 April 2009Cycle 21, Core Operating Limits ReportsShutdown Margin
ML0909703971 April 2009Units, 1, 2 & 3; North Anna Units 1 & 2; Surry, Units 1 & 2 and Associated ISFSIs - Submittal of Dominion'S Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage.