Units, 1, 2 & 3; North Anna Units 1 & 2; Surry, Units 1 & 2 and Associated ISFSIs - Submittal of Dominion'S Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage.ML090970397 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna, 07200002, 07200055 |
---|
Issue date: |
04/01/2009 |
---|
From: |
Hartz L Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
09-197, FOIA/PA-2011-0115 |
Download: ML090970397 (5) |
|
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change 2024-02-06
[Table view] |
Text
Dominion Resources Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 i-Domi n ioW Web Address: www.dom.com Safeguards Information April 1, 2009 Re: 10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission Serial No.: 09-197 Attention: Document Control Desk NL&OS/MAE: RO Washington, D.C. 20555-0001 Docket Nos.: 50-305 50-245/336/423 50-338/339 50-280/281 72-2/16/47/55/56/64 License Nos.: DPR-43 DPR-21/65 NPF-49 DOMINION ENERGY KEWAUNEE, INC. NPF-4/j DOMINION NUCLEAR CONNECTICUT, INC. DPR-32 /37 VIRGINIA ELECTRIC AND POWER COMPANY SNM-2r ~01/2507 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 1. 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 AND ASSOCIATED ISFSIs SUBMITTAL OF DOMINION'S SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
SECURITY PROGRAM - REVISION 3 Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b), Dominion Energy Kewaunee, Inc., (DEK), Dominion Nuclear Connecticut, Inc. (DNC) and Virginia Electric and Power Company (Dominion) submit the enclosed Revision 3 to Dominion's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program for Kewaunee, Millstone, North Anna, and Surry Power Stations and associated ISFSIs. This plan was effective March 31, 2009. We have determined that these changes do not decrease the safeguards effectiveness of the previous plan.
Classified By:
Name: Nelson K. Martin
Title:
Manqr. Nuc. Fleet Protection Services Organization:Nuc. Protection Services/ Dominion Effective Date: 04/01/09 Unauthorized Disclosure Of Safeguards Information Will Be Subject To Civil And Criminal Sanctions NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information (
Serial No.09-197 Sec., T&Q, and Conting. Plan Submittal Page 2 of 5 Safeguards Information The enclosed material contains Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.
Sincerely, Leslie N, Hartz Vice President - Nuclear Support Services Dominion Energy Kewaunee, Inc.
Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company Enclosure Commitments made by this letter: None cc: U. S. Nuclear Regulatory.Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Regional Administrator P. 0. Box 2257 Atlanta, Georgia 30303-3415 U. S. Nuclear Regulatory Commission Region III Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Serial No.09-197 Sec., T&Q, and Conting. Plan Submittal Page 3 of 5 Safeguards Information Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Ms. P. Longmire (Without Enclosure)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. John M. Goshen (Without Enclosure)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. Davis (Without Enclosure)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. P. S. Tam (Without Enclosure)
NRC Senior Project Manager Kewaunee U. S. Nuclear Regulatory Commission Mail Stop 0-8 H4A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Serial No.09-197 Sec., T&Q, and Conting. Plan Submittal Page 4 of 5 Safeguards Information Mr. J. B. Hickman (Without Enclosure)
NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Ms. C. J. Sanders (Without Enclosure)
NRC Project Manager Millstone Units 2 and 3 U. S. Nuclear Regulatory Commission Mail Stop 0-8-B 1A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. F. Stang, Jr. (Without Enclosure)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 0-8 G9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. D. N. Wright (Without Enclosure)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 0-8 H4A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. L. A. Kauffman (Without Enclosure)
NRC Inspector 475 Allendale Road King of Prussia, PA 19406-1415 Mr. S. W. Shaffer (Without Enclosure)
NRC Senior Resident Inspector Millstone Power Station NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Serial No.09-197 Sec., T&Q, and Conting. Plan Submittal Page 5 of 5 Safeguards Information Mr. S. C. Burton (Without Enclosure)
NRC Senior Resident Inspector Kewaunee Power Station Mr. J. T. Reece (Without Enclosure)
NRC Senior Resident Inspector North Anna Power Station Mr. C. R. Welch (Without Enclosure)
NRC Senior Resident Inspector Surry Power Station NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information