Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
ML042590169 | 30 June 2004 | VEP-FRD-41, Rev 0.1-A, Vepco Reactor System Transient Analyses Using the Retran Computer Code (Volume 1) | Boric Acid Shutdown Margin Loop seal Stroke time Power change |
ML042100332 | 30 June 2004 | Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements | |
ML041890407 | 29 June 2004 | Revision to Surry, Unit 2 Third Interval Relief Request No. SR-004 Rev. 2 - Withdrawal of Surry Unit 1 Fourth Interval Relief Request No. CMP-002 | |
ML041970079 | 25 June 2004 | RAI, Security Plan Sections 1-9 (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977, and MC2978) | |
ML041750446 | 21 June 2004 | RAI, Security Plan Sections 10-19 | |
TAC:MC2938 | 21 June 2004 | ||
ML041800243 | 16 June 2004 | Proposed Independent Spent Fuel Storage Installation, North Anna Power Station, Units 1 & 2, ISFSI at North Anna, and Surry Power Station, Units 1 & 2, & ISFSI at Surry - Use of Encryption Software for Secure.. | |
TAC:MC3110 | 16 June 2004 | ||
ML063180518 | 1 June 2004 | Tragis Routing Engine Version 1.4.15, from Surry to Yucca Mountain | |
TAC:MC1830 | 28 May 2004 | ||
ML041530588 | 28 May 2004 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Relief Request PRT-01 | Incorporated by reference |
ML041700559 | 28 May 2004 | Evaluation of Preliminary White Finding and Associated NRC Risk Analysis Contained in NRC Inspection Report Nos. 05000280-03-008 and 05000281-03-008 Supplemental Response to Request for Additional Information | Coatings Significance Determination Process Preliminary White Finding |
PNO-II-04-003, Surry Unit 2 Reactor Trip and Auxiliary Feedwater System Issues Causing a Unit Shutdown to Cold Shutdown | 24 May 2004 | PNO-II-04-003: Surry Unit 2 Reactor Trip and Auxiliary Feedwater System Issues Causing a Unit Shutdown to Cold Shutdown | |
IR 05000280/2004006 | 21 May 2004 | IR 05000280-04-006 & IR 05000281-04-006, on 03/22/04 Through 03/26/04 & 04/05/04 Through 04/08/04, for Surry Power Station Units 1 & 2; Safety System Design & Performance Capability Inspection | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Coatings Significance Determination Process Job Performance Measure Earthquake |
ML041460381 | 18 May 2004 | Relief Request, ASME Section XI, Subsection Iwf TAC MC0869 | Incorporated by reference |
ML041350122 | 13 May 2004 | ASME Section XI Fourth Inservice Inspection (ISI) Interval Update Risk Informed Inservice Inspection (RI-ISI) Program | Probabilistic Risk Assessment VT-2 |
ML041340707 | 13 May 2004 | ASME Section XI Inservice Inspection Program Reactor Pressure Vessel Weld Examination Relief Requests | Dissimilar Metal Weld DM weld Grace period |
ML041460178 | 13 May 2004 | Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Proposed Technical Specification Change Auxiliary Feedwater Required Action Statement Revisions | Power change |
ML041390550 | 11 May 2004 | April 2004 Monthly Operating Report for Surry Power Station, Units 1 and 2 | |
ML041480088 | 7 May 2004 | Evaluation of Preliminary White Finding and Associated NRC Risk Analysis Contained in NRC Inspection Reports 0500028012003008 and 05000281/2003008 Response to RAI | Probabilistic Risk Assessment Significance Determination Process Preliminary White Finding Continuous fire watch Fire Watch |
ML041480391 | 7 May 2004 | Halon System, Emergency Switchgear Room and Fire Protection Drawings | |
ML041480089 | 5 May 2004 | Calculation SM-1442, Response to NRC Request for Additional Information on Surry ESGR Phase 3 SDP Comments | Probabilistic Risk Assessment Fire Watch |
ML041330204 | 5 May 2004 | Virginia Electric and Power Company Response to Request for Addiitonal Information Re Fourth Interval Inservice Inspection Program for Surry Power Station Unit 2 | Boric Acid VT-2 Incorporated by reference Scaffolding |
ML041330207 | 5 May 2004 | Drawing 11548-FM-1E, Rev 10, Machinery Location Reactor Continment Sections A-A, X-X & F-F Surry Power Station - Unit 2. Sheet 1 of 1 | |
ML041330209 | 5 May 2004 | Drawing 11548-FM-10, Rev 9, Mach Loc Reactor Cont Sections C-C & D-D Surry Power Station - Unit 2. Sheet 1 of 1 | |
ML041330208 | 5 May 2004 | Drawing 11548-FM-1F, Rev 9, Mach. Loc. Reactor Cont. Sections B-B. E-E. Y-Y & Z-Z Surry Power Station - Unit 2. Shet 1 of 1 | |
ML041270002 | 4 May 2004 | Request to Use Code Case N-663 as an Alternative for Surface Examination of ASME Code Class 2 Piping Welds(Tac MC2489, MC2490, MC2491, MC2523 & MC2524) | Boric Acid Non-Destructive Examination Incorporated by reference |
TAC:MC2489 | 4 May 2004 | ||
ML041310484 | 30 April 2004 | 2003 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
IR 05000280/2004009 | 28 April 2004 | IR 05000280-04-009 on 02/16/2004 - 03/27/2004 for Surry Power Station, Unit 1; Supplemental Inspection IP 95001 for a White Performance Indicator in the Initiating Events Cornerstone | Significance Determination Process |
ML041250402 | 28 April 2004 | Change in Section Chief - N. Anna and Surry - Effective 5/3/04 for Approximately 3 Months Ms. Stephanie Coffin Will Be the PDII-1 Section Chief | |
ML041210124 | 26 April 2004 | Supplemental Response to Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors Dated April 29, 2003 and Submittal of Security Plan | Enforcement Discretion |
ML041180487 | 22 April 2004 | Units I and 2 - Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Power change |
ML041180603 | 21 April 2004 | Meeting Summary with Virginia Electric and Power Company to Discuss Risk Significance of Concerns Associated with NRC Response to Potential Fire in Emergency Switchgear | |
ML041130371 | 20 April 2004 | Fourth Interval Inservice Inspection Program Request for Additional Information Response | Boric Acid VT-2 |
ML041110786 | 20 April 2004 | No Individuals Participating in the Generic Fundamentals Examination (GFE) | Generic Fundamentals Examination |
IR 05000280/2004002 | 19 April 2004 | IR 05000280-04-002, IR 05000281-04-002, on 12/28/2003 - 03/27/2004, Surry Power Station Units 1 & 2, Surry, VA; Routine Integrated Report | Significance Determination Process Maintenance Rule Program Through-Wall Leak Fire Protection Program |
ML041070472 | 15 April 2004 | Request for Approval of Topical Report DOM-NAF-2, Reactor Core Thermal-Hydraulics Using VIPRE-D Computer Code Including Appendix a, Qualification of F-ANP Bwu CHF Correlations in Dominion VIPRE-D Computer Code. | Exemption Request Fuel cladding |
ML041260213 | 13 April 2004 | March 2004 Monthly Operating Report for Surry Power Station Units 1 & 2 | |
ML041070137 | 8 April 2004 | Attachment 1, List of Attendees for Surry Annual Assessment Meeting Dated 04/08/04 | |
ML041040112 | 8 April 2004 | Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2004 | Preliminary White Finding |
ML040970487 | 6 April 2004 | NRC Examination Report 05000280/2004-301 and 05000281/2004-301 | Job Performance Measure |
ML040960543 | 5 April 2004 | Relief, American Society of Mechanical Engineers Section XI Subsection Iwf Inservice Inspection, with Regard to the Functional Testing of Snubbers | Incorporated by reference |
TAC:MB7764 | 5 April 2004 | ||
ML041410099 | 2 April 2004 | E-mail on 04/02/04 - Fanp Attendance for 04/01 Telecon - CRDM Repair Analysis - with NRC | |
ML041040134 | 1 April 2004 | Regulatory Conference NRC Triennial Fire Protection Inspection Findings, Surry Power Station, Units 1 and 2 |