Letter Sequence RAI |
---|
|
|
MONTHYEARML0417505452004-06-21021 June 2004 RAI, Security Plan Sections 10-19 Project stage: RAI ML0417504462004-06-21021 June 2004 RAI, Security Plan Sections 10-19 Project stage: RAI ML0419700792004-06-25025 June 2004 RAI, Security Plan Sections 1-9 (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977, and MC2978) Project stage: RAI ML0421000812004-07-0909 July 2004 RAI, Training and Qualification Plan (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977, and MC2978) Project stage: RAI ML0422200552004-07-23023 July 2004 RAI Safeguards Contingency Plan and Section 9.4.1 Fo the Physical Security Plan Project stage: RAI ML0421001822004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2938, MC2939, MC2943, MC2944, MC2977 & MC2978) Project stage: RAI ML0422402262004-08-10010 August 2004 Response to Request for Additional Information Re Safeguards Contingency Plan and Security Plan Section 9.4.1 Project stage: Response to RAI ML0424003702004-08-23023 August 2004 Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Response to Request for Additional Information Safeguards Contingency Plan and Physical Security Plan Project stage: Response to RAI ML0425902042004-09-10010 September 2004 Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures Project stage: Other ML0428202182004-09-28028 September 2004 ISFSI Surry Power Station ISFSI, Confirmation of Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures (TAC No. MC2943 and MC2944) Project stage: Other ML0428005312004-10-0101 October 2004 Units 1, 2, 3 & ISFSI Response to Request for Additional Information Waterborne Threat and Other Plan Changes Project stage: Response to RAI ML0428803682004-10-12012 October 2004 Revision of Response to Request for Additional Information Waterborne Threat Project stage: Response to RAI ML0431200032004-10-29029 October 2004 Administrative Change to Facility Operating Licenses in Conjunction with the Commission Order EA-03-086 Regarding the Revised Design Basis Threat (Dbt); and Revisions To... Project stage: Other ML0435102182004-12-0909 December 2004 Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Review of Safety Evaluation Report (TAC Nos. MC2938, MC2939, MC2943, MC2944. MC2977. and MC2978) Project stage: Other 2004-06-25
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24318C4622024-11-13013 November 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - License Amendment Nos. 315 and 315 Updated Information Regarding TSC Ventilation Design IR 05000280/20240032024-11-12012 November 2024 Integrated Inspection Report 05000280-2024003 and 05000281-2024003 ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20240112024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML20315A3972020-11-10010 November 2020 Notification of NRC Supplemental Inspection (95001) and Request for Information - RA ML20156A0652020-06-0404 June 2020 NRR E-mail Capture - Final RAIs for Surry U1 Fall 2019 Sgtir Application ML20136A0102020-05-14014 May 2020 NRR E-mail Capture - Final RAIs Regarding Surry Units 1 & 2 LAR to Adopt 10 CFR 50.69 ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20106E9552020-04-15015 April 2020 Program Inspection RFI ML20029D8382020-02-0505 February 2020 Email from T. Tran, Nmss/Drefs/Elrb; Re., Request for Additional Information - Surry SLRA Environmental Review ML20013C7282020-01-0909 January 2020 NRR E-mail Capture - Final RAI Regarding Surry'S TS One-Time 14-Day AOT RSST Cable Replacement LAR ML20007F7952020-01-0606 January 2020 NRR E-mail Capture - Surry RAI Regarding Its Rx Coolant P-T Limits LAR ML19323E2212019-11-13013 November 2019 NRR E-mail Capture - RAI on the SPS Rtb CT Extension LAR ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19296D8982019-10-23023 October 2019 NRR E-mail Capture - RAI for Surry ISTF-411 LAR to Extend Rx Trip Breakers TS CT to 24 Hours ML19283B6252019-10-0202 October 2019 Questions Related to Interval Visual Inspections in Lieu of External Visual Inspections ML19283B6232019-09-20020 September 2019 NRC Surry Draft RAI-Open Cycle Cooling Water (NRC TRP-20 James Gavula) ML19283B6282019-09-19019 September 2019 SLRA - Draft 3rd Round RAI - Selective Leaching (Trp 33) ML19283B6272019-09-18018 September 2019 SLRA - Clarification Call for 3rd Round RAI - Trp 14 (Buried Piping) ML19253C7532019-08-20020 August 2019 SLRA Transmittal Email Attachment 4D Confirmation Letter - August 20, 2019 ML19231A1532019-08-14014 August 2019 Final Requests for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 4 August 14, 2019. L-2018-RNW-0023/000951 ML19217A3582019-08-0202 August 2019 SLRA RAI Transmittal Email Set 3 with Attachments- 2-August 5, 2019 ML19192A2472019-07-10010 July 2019 Final Disposition List of Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application (L-2018-RNW-0023/000951) ML19184A1392019-07-0101 July 2019 SLRA Email Transmittal of Draft RAIs with Attachments - 29JUN2019 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 2024-05-22
[Table view] |
Text
SAFEGUARDS INFORMATION June 21, 2004 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Care of Mr. Cortis Luffman Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 10-19 (TAC NOS. MC2977 AND MC2978)
Dear Mr. Christian:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Surry Power Station, Units 1 and
- 2. The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 10 through 19 of your physical security plan. We discussed the enclosed RAI with Margaret Earle, Mr. Brian McBride, and Mr. Nelson Martin of your staff during a telephone call on May 21, 2004. Please respond to the enclosed RAI within 10 days from WARNING: Violation of Section 147 of the Atomic Energy Act, NOTICE: The enclosed information contains Safeguards Safeguards Information is subject to Information. Upon separation from the Enclosure, this Civil and Criminal Penalties letter is DECONTROLLED.
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION D. A. Christian the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-3498.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosure:
As stated cc w/o encl: See next page SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION D. A. Christian the date of this letter. If circumstances result in the need to revise the response target date, please contact me at (301) 415-3498.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION:
PUBLIC SPRT R/F J. Nakoski J. Peralta C. Hawes BVaidya OGC ACRS S. Monarque S. Coffin (A)
E. Hackett V. McCree, RII ADAMS Accession Number: ML041750446 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME BVaidya CHawes JPeralta JNakoski DATE 6/18/04 6/18/04 6/21/04 6/21/04 OFFICIAL RECORD COPY SAFEGUARDS INFORMATION
Virginia Electric and Power Company Surry Power Station Units 1 and 2 cc:
Ms. Lillian M. Cuoco, Esq. Office of the Attorney General Senior Counsel Commonwealth of Virginia Dominion Resources Services, Inc. 900 East Main Street Building 475, 5th Floor Richmond, Virginia 23219 Rope Ferry Road Rt. 156 Mr. Chris L. Funderburk, Director Waterford, Connecticut 06385 Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Mr. Richard H. Blount, II Innsbrook Technical Center Site Vice President 5000 Dominion Blvd.
Surry Power Station Glen Allen, Virginia 23060-6711 Virginia Electric and Power Company 5570 Hog Island Road Mr. Jack M. Davis Surry, Virginia 23883-0315 Site Vice President North Anna Power Station Senior Resident Inspector Virginia Electric and Power Company Surry Power Station P. O. Box 402 U. S. Nuclear Regulatory Commission Mineral, Virginia 23117-0402 5850 Hog Island Road Surry, Virginia 23883 Mr. William R. Matthews Vice President - Nuclear Operations Chairman Virginia Electric and Power Company Board of Supervisors of Surry County Innsbrook Technical Center Surry County Courthouse 5000 Dominion Boulevard Surry, Virginia 23683 Glen Allen, Virginia 23060-6711 Dr. W. T. Lough Mr. David A. Christian Virginia State Corporation Sr. Vice President and Chief Nuclear Officer Commission Virginia Electric and Power Company Division of Energy Regulation 5000 Dominion Blvd.
P. O. Box 1197 Glen Allen, Virginia 23060 Richmond, Virginia 23218 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218