ML041800243

From kanterella
Jump to navigation Jump to search

Proposed Independent Spent Fuel Storage Installation, North Anna Power Station, Units 1 & 2, ISFSI at North Anna, and Surry Power Station, Units 1 & 2, & ISFSI at Surry - Use of Encryption Software for Secure
ML041800243
Person / Time
Site: Millstone, Surry, North Anna, 07200002  Dominion icon.png
Issue date: 06/16/2004
From: Bhalchandra Vaidya
NRC/NRR/DLPM
To: Grecheck E
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
References
-RFPFR, TAC MC3110, TAC MC3111, TAC MC3112, TAC MC3113, TAC MC3117, TAC MC3118, TAC MC3421
Download: ML041800243 (8)


Text

June 16, 2004 Mr. Eugene S. Grecheck Vice President - Nuclear Support Services Dominion Nuclear Connecticut, Inc.

Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

MILLSTONE POWER STATION, UNITS 1, 2, AND 3, AND PROPOSED INDEPENDENT SPENT FUEL STORAGE INSTALLATION, NORTH ANNA POWER STATION, UNITS 1 AND 2, ISFSI AT NORTH ANNA, AND SURRY POWER STATION, UNITS 1 AND 2, AND ISFSI AT SURRY-USE OF ENCRYPTION SOFTWARE FOR SECURE TRANSMISSION OF SAFEGUARDS INFORMATION (TAC NOS. MC3421, MC3117, MC3118, MC3110, MC3111, MC3112, AND MC3113)

Dear Mr. Grecheck:

By letter dated May 10, 2004, you requested approval to use encryption software for the transmission of Safeguards Information (SGI) for Millstone Power Station, Units 1, 2, and 3, and Proposed Independent Spent Fuel Storage Installation (ISFSI), North Anna Power Station, Units 1 and 2, ISFSI, and Surry Power Station, Units 1 and 2, ISFSI. Specifically, you requested approval for the use of PGP Software (Enterprise, Corporate, or Personal) Desktop Version 8.0 or the latest validated version developed with PGP SDK 3.0.3 for encryption of sensitive unclassified SGI.

Title 10 of the Code of Federal Regulations (10 CFR) Section 73.21(g)(3) states, in part,

... Safeguards Information shall be transmitted only by protected telecommunication circuits (including facsimile) approved by the NRC. The Nuclear Regulatory Commission (NRC) considers those encryption systems that the National Institute of Standards and Technology (NIST) has determined conform to the Security Requirements for Cryptographic Modules in Federal Information Processing Standard (FIPS) 140-2, as being acceptable. The Secretary of Commerce has made use of Cryptographic Module Validation Program products mandatory and binding for Federal agencies when a Federal agency determines that cryptography is necessary for protecting sensitive information.

PGP Software Corporate Desktop Version 8.0 was developed with PGP SDK 3.0.3. NIST Certificate, Number 394, validates compliance of this software development tool with FIPS 140-2 requirements. Therefore, the NRC staff finds the use of this encryption software acceptable for processing and transmitting SGI electronically for your sites. Later versions of PGP Software Corporate Desktop are also acceptable provided that:

1.

They were developed using a software development tool e.g., PGP SDK 3.0.3 that meets and is validated by NIST to FIPS 140-2 requirements.

E. S. Grecheck 2.

You notify the NRC of your intention to update your encryption software 30 days prior to its first use. When notifying the NRC, include a description of the new software you will be using and provide a statement indicating NIST certification of the software development tool.

It is important to remind you that in accordance with 10 CFR 73.21(a), you are required to establish and maintain an information protection system that satisfies 10 CFR 73.21(b) through (i). Compliance with the provisions of 10 CFR 73.21, including the use of encryption software for transmittal of SGI, is mandatory and inspectable.

Additionally, only one public key is to be generated per site. The PGP file containing the public key must be named according to the following syntax: LastName_FirstName_SiteName.asc.

This naming convention represents the organizational point of contact indicated as owning the key-pair.

As stated in letter dated May 5, 2004, from R. P. Zimmerman, NRC, Office of Nuclear Security and Incident Response, to Stephen D. Floyd, Nuclear Energy Institute (NEI), please provide the public key for transmitting sensitive, unclassified SGI and the point of contact information (name, telephone number and e-mail address) to NEI and the NRC points of contact provided below. Once this information has been provided, we will provide a copy of the NRC public key to your point of contact. All SGI holders must employ an appropriate credentialing process to verify that individuals providing public keys are legitimate users. Private keys must be controlled as SGI.

The NRC point of contact for all transmittals related to the review and approval of the supplemental responses to the security orders is Mr. Bhalchandra K. Vaidya, Project Manager, Security Plan Review Team, Division of Licensing Project Management, who can be reached at (301)415-3308, or via e-mail at bkv@nrc.gov. For transmittal of other SGI, and for public key coordination, the NRC point of contact is Mr. Louis Grosman, Office of the Chief Information Officer, who can be contacted at (301)415-5826, or via e-mail at lhg@nrc.gov. As coordinated with the NEI, the industry point of contact for public key coordination is Mr. James W. Davis, who can be reached at (301)739-8105 and via e-mail at jwd@nei.org.

E. S. Grecheck Encrypted SGI information shall be transmitted as attachments to an e-mail directed to sprt@nrc.gov. The e-mail message must also contain the name of the NRC staff member who is to receive the attachments.

If you have any questions, please contact me at (301)415-3308.

Sincerely,

/RA/

Bhalchandra K. Vaidya, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-245, 50-336, 50-423, 72-2, 50-338, 50-339, 72-16, 50-280, 50-281, and 72-47 cc: See next page

ML041800243 OFFICE SPRT/PM SPRT/LA NSIR/DNS/SC OCIO/PMAS NMSS/SFPO SPRT/SC NAME BVaidya CHawes SMorris LHGrosman JMonninger JNakoski RFretz for DATE 6/16/04 6/16/04 6/16/04 6/16/04 6/16/04 6/16/04

Millstone Power Station, Unit Nos. 2 and 3 cc:

Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Roper Ferry Road Waterford, CT 06385

Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Virginia Electric and Power Company Surry Power Station Units 1 and 2 cc:

Ms. Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23218 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. Jack M. Davis Site Vice President North Anna Power Station Virginia Electric and Power Company P. O. Box 402 Mineral, Virginia 23117-0402 Mr. William R. Matthews Vice President - Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711

North Anna Power Station Virginia Electric and Power Company, Units 1 and 2 cc:

Mr. C. Lee Lintecum County Administrator Louisa County P. O. Box 160 Louisa, Virginia 23093 Ms. Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Building 475, 5 th floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U. S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Mr. Jack M. Davis Site Vice President North Anna Power Station P. O. Box 402 Mineral, Virginia 23117-0402 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Mr. Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. O. Box 2448 Richmond, Virginia 23218 Mr. William R. Matthews Vice President-Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060