MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-04-0707 April 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220301, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22022-03-29029 March 2022 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20220113, Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 22022-02-11011 February 2022 Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 2 PMNS20210540, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 22021-05-11011 May 2021 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 2 PMNS20210612, Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 22021-05-10010 May 2021 Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 2 PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20201174, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-10-0101 October 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) PMNS20201170, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-09-30030 September 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) ML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA ML14076A1112014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Forum to Discuss the Annual Assessment of Surry Power, Units 1 and 2 ML14066A1252014-03-0707 March 2014 March 18, 2014, Notice of Category 3 Public Meeting/Open House Regarding Surry, Units 1 & 2, Annual Assessment ML14065A4942014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML14065A5302014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML11256A2912010-08-12012 August 2010 Email from R. Guzman, NRR/DORL/LPL1-1 to R. Chang, Res/Dsa/Spb, Soarca Weekly Team Meeting ML0931002542009-11-0909 November 2009 Notice of Conference Call with Virginia Electric and Power Company to Discuss Issues Relating to Surry Power Station ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0632605122006-11-22022 November 2006 Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0525606282005-09-13013 September 2005 Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0420301852004-07-21021 July 2004 Notice of Meeting with Virginia Electric & Power Company (VEPCO) to Discuss Vepco'S Proposed plant-specific Topical Report That Implements VIPRE-D Code ML0411806032004-04-21021 April 2004 Meeting Summary with Virginia Electric and Power Company to Discuss Risk Significance of Concerns Associated with NRC Response to Potential Fire in Emergency Switchgear ML0325500192003-09-12012 September 2003 Notice of Meeting with Dominion Regarding Proposed Consolidation of the Quality Assurance Programs for Surry, Units 1 and 2, North Anna, Units 1 and 2, Millstone, Units 2 and 3, Nuclear Plants ML0305902342003-02-28028 February 2003 Forthcoming Meeting with Virginia Electric Power Co. to Discuss Control Room Habitability Testing ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2023-05-11
[Table view] Category:Meeting Summary
MONTHYEARML23345A1092023-12-14014 December 2023 December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2 ML23167A7012023-06-26026 June 2023 Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22335A5172022-12-0505 December 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections (RFO 31) ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22115A0032022-05-17017 May 2022 Summary of Public Meeting with Virginia Electric and Power Company on April 13, 2022 Regarding Future LAR Request to Change the Auxiliary Feedwater System Allowed Outage Time ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22070A8092022-03-15015 March 2022 Public Webinar Summary with Virginia Electric and Power Company Regarding Further License Amendment Relocating the Technical Services Center to the Local Emergency Operations Facility ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21159A0932021-06-16016 June 2021 May 20, 2021, Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21155A1632021-06-11011 June 2021 Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20335A1122020-12-0707 December 2020 Summary of November 30, 2020, Meeting with the National Marine Fisheries Service and Dominion Energy, Inc. Regarding Atlantic Sturgeon Capture at Surry Power Station ML20296A4072020-11-12012 November 2020 Summary of October 14, 2020, Public Meeting with Virginia Electric and Power Company to Discuss Presubmittal Supplements for Surry Units 1 and 2 ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML19266A4842019-10-0101 October 2019 Summary of Pre-Licensing Meeting with Dominion Energy Regarding a License Amendment Request to Adopt a Risk-Informed 10 CFR 50.69 Categorization Program ML19253D7082019-09-24024 September 2019 Summary of August 13, 2019, Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19219A2842019-08-13013 August 2019 July 29, 2019, Summary of Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19135A1982019-06-0404 June 2019 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Surry Power Station, Unit Nos 1 and 2, Subsequent License Renewal Application ML19144A1292019-05-30030 May 2019 Summary of November 20, 2018, Pre Application Meeting with Dominion Energy Regarding the Planned License Amendment Request to Revise Emergency Action Levels ML19128A3372019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding Surry Power Station Docket Nos. 50-280 and 50-281 ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit ML19024A3862019-01-30030 January 2019 01/08/2018 Summary of Meeting Regarding Public Scoping Meeting for Environmental Review of Surry Power Station, Units 1 and 2 Subsequent License Renewal Application ML18144A0712018-05-23023 May 2018 Summary of Annual Assessment Public Meeting Regarding Surry Power Station ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application ML18066A0192018-03-16016 March 2018 Meeting Summary of October 4, 2017 Pre-Submittal Public Meeting to Discuss LAR Request Regarding Consolidation of the Emergency Operations Facilities ML18057A2752018-03-0101 March 2018 February 7, 2018, Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry Power Station, Units 1 and 2 Subsequent Renewal Application ML17123A1162017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the Surry Power Station, Units 1 and 2 with the Public for Period of January 01, 2016 Through December 31, 2016 ML16320A4602016-12-0707 December 2016 Summary of Meeting with Virginia Electric and Power Company Regarding Pre-Submittal Information on Proposed Alternative to ASME Code to Repair Safety-Related Piping Using Carbon Fiber Reinforced Polymer at Surry Power Station, 1 & 2 ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14210A0212014-08-0808 August 2014 June 25, 2014, Summary of Category 1 Public Meeting with Dominion Nuclear to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12129A2512012-05-0808 May 2012 Summary of Category 3 Public Meeting Annual Assessment for Surry Power Station ML12115A0702012-04-24024 April 2012 Summary of Public Meeting with Surry Power Station, Unit 2 to Discuss a Preliminary White Finding Involving One Apparent Violation of Technical Specification 6.4.A.7 ML1206600702012-03-0606 March 2012 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry ML1206600902012-03-0606 March 2012 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry ML11173A1542011-07-0505 July 2011 Summary of Conference Call Regarding the Spring 2011 Steam Generator Tube Inspections ML1110303992011-04-13013 April 2011 Public Meeting/Open House Summary Letter - Surry Power Station ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0911000832009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Surry Power ML0814901522008-06-10010 June 2008 Spring 2008 Refueling Outage Steam Generator Tube Inspections ML0811301672008-04-15015 April 2008 Annual Assessment Meeting Slides - Reactor Oversight Program - Cy 2007 ML0733801432007-12-11011 December 2007 Steam Generator Tube Inspections ML0728906642007-11-0101 November 2007 Summary of Meeting with Dominion Nuclear Regarding Chemical Testing Methods Related to GSI-191 ML0635302762006-12-21021 December 2006 Summary of Public Meeting with VEPCO Re Licensee Plan to Submit a License Amendment for Chilled Water Piping Replacement. 2023-06-26
[Table view] |
Text
April 21, 2004 Virginia Electric and Power Company ATTN: Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
MEETING
SUMMARY
- SURRY POWER STATION
Dear Mr. Christian:
This refers to the open Regulatory Conference that was conducted at your request at the Region II Office on April 1, 2004, to discuss the risk significance of concerns associated with your response to a potential fire in the Emergency Switchgear and Relay Room of both units.
A list of attendees and the meeting agenda are enclosed.
It is our opinion that this conference was beneficial in that we arrived at a shared understanding of the performance issues, corrective actions and your perspective on the risk significance.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
A copy of your presentation handout has been placed in ADAMS (ML041040134). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this conference, please contact us.
Sincerely,
/RA/
Charles R. Ogle, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-280, 50-281 Licensee Nos.: DPR-32, DPR-37
Enclosures:
- 1. List of Attendees
- 2. Meeting Agenda cc w/encls: (See page 2)
VEPCO 2 cc w/encls:
Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric & Power Company Electronic Mail Distribution Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encls:
S. Monarque, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME CPAYNE KLANDIS KODONOHUE DATE 04/ 21/2004 04/21/04 4/21/2004 E-MAIL COPY? YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041180603.wpd
List of Attendees Dominion Resources R. Blount, Surry Site Vice President C. Funderburk, Dominion Director - Nuclear Licensing and Operations Support M. Gaffney, Surry Director - Safety and Licensing E. Grecheck, Dominion Vice President - Nuclear Support Services T. Hook, Dominion Lead PRA Engineer, Nuclear Analysis and Fuels J. Martin, North Anna Supervisor Nuclear Engineering Dominion Resources (via video teleconference)
J. Ashley, Surry Licensing Engineer B. Garber, Surry Licensing Supervisor T. Huber, Surry Manager Engineering W. Oppenhimer, Surry Assistant Engineering Manager K. Sloane, Surry Director - Operations and Maintenance M. Smith, Surry Auxiliary Systems Supervisor J. Swientoniewski, Surry Manager Nuclear Operations NRC C. Christensen, Deputy Director, Division of Reactor Safety (DRS), Region II (RII)
C. Evans, Director, Enforcement and Investigations Coordination Staff (EICS), RII H. Gepford, Health Physicist, Plant Support Branch (PSB), DRS, RII*
I. Hall, Physical Security Inspector, PSB, DRS, RII*
K. Landis, Chief, Reactor Projects Branch 5, Division of Reactor Projects (DRP), RII C. Ogle, Chief, Engineering Branch 1 (EB1), DRS, RII C. Payne, Senior Reactor Inspector, EB1, DRS, RII L. Plisco, Deputy Regional Administrator, RII R. Rasmussen, SRA, Probabilistic Safety Assessment Branch (SPSB), Office of Nuclear Reactor Regulation (NRR)*
W. Rogers, Senior Reactor Analyst (SRA), DRS, RII J. Shehee, Physical Security Inspector, PSB, DRS, RII*
S. Sparks, Senior Enforcement Specialist, EICS, RII L. Wert, Deputy Director, DRP, RII NRC (via video teleconference)
D. Arnett, Surry Resident Inspector, RII J. Arroyo, Project Engineer, Project Directorate II, NRR M. Franovich, Team Leader (Acting), SPSB, NRR R. Franovich, Enforcement Coordinator, Division of Inspection Program Management, NRR D. Harrison, Senior Risk and Reliability Engineer, SPSB, NRR N. Iqbal, Fire Protection Engineer, Plant Systems Branch (SPLB), NRR A. Klein, Senior Fire Protection Engineer, SPLB, NRR S. Monarque, Project Engineer, Project Directorate II, NRR R. Perch, Senior Reliability and Risk Analyst, SPSB, NRR F. Ramirez, Enforcement Specialist (Intern), Office of Enforcement M. Reinhart, Section Chief, SPSB, NRR G. McCoy, Surry Senior Resident Inspector, RII Enclosure 1
2 Members of the Public N. Burton, Esquire, Attorney, Connecticut Coalition Against Millstone (via teleconference)*
D. Gaynor, Senior Lead Engineer, Entergy*
C. Guey, Supervisor PRA Group, Florida Power and Light Company*
- Meeting Observers Enclosure 1
AGENDA SURRY POWER STATION APRIL 1, 2004 NRC REGION II OFFICE, ATLANTA, GA I. OPENING REMARKS, INTRODUCTIONS AND MEETING INTENT Loren Plisco, Deputy Regional Administrator II. NRC REGULATORY CONFERENCE POLICY Chris Christensen, Deputy Director, Division of Reactor Safety III. STATEMENT OF THE ISSUE WITH RISK AND REGULATORY PERSPECTIVES Chris Christensen, Deputy Director, Division of Reactor Safety IV.
SUMMARY
OF APPARENT VIOLATION Chris Christensen, Deputy Director, Division of Reactor Safety V. LICENSEE RISK PERSPECTIVE PRESENTATION VI. LICENSEE RESPONSE TO APPARENT VIOLATION VII. BREAK / NRC CAUCUS Loren Plisco, Deputy Regional Administrator VIII. CLOSING REMARKS Loren Plisco, Deputy Regional Administrator Enclosure 2