Letter Sequence Other |
---|
|
|
MONTHYEARML0409605432004-04-0505 April 2004 Relief, American Society of Mechanical Engineers Section XI Subsection Iwf Inservice Inspection, with Regard to the Functional Testing of Snubbers Project stage: Other 2004-04-05
[Table View] |
Similar Documents at Surry |
---|
Category:Code Relief or Alternative
MONTHYEARML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML23244A2352023-09-18018 September 2023 – Request to Use a Subsequent Edition of the ASME Code, Section XI ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23073A1912023-04-21021 April 2023 Alternative for Inservice Inspections of Pressurizer and Steam Generator Weld Examinations ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18068A0642018-03-26026 March 2018 Relief from the Requirements of the ASME Code Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML16365A1182017-02-17017 February 2017 Requests for Relief LMT-R01, LMT-SS01, LMT-CS01, LMT-P01, LMT-C01, LMT-C02, LMT-C03, and LMT-C04 - for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML16208A0092016-08-24024 August 2016 Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME Code ML15023A4412015-03-16016 March 2015 Alternatives to the Requirements of the ASME Code and Use of a Subsequent Edition and Addenda of the ASME B&PV Code, Section XI ML15029A4242015-02-10010 February 2015 Fifth 10-Year Inservice Inspection Interval Request for Subsequent Edition/Addenda ML14309A6662014-11-25025 November 2014 Relief from the Requirements of the ASME Code ML14125A4712014-05-0909 May 2014 Relief from the Requirements of the ASME Code ML14115A1992014-04-30030 April 2014 Relief from the Requirements of the ASME OM Code ML14113A3462014-04-25025 April 2014 Relief from the Requirements of the ASME Code ML13204A2972013-08-0101 August 2013 Relief from the Requirements of the ASME Code (Tacs. MF0329 and MF0330) ML13106A1402013-04-30030 April 2013 Relief from the Requirements of the ASME Code Section XI for the Fourth Ten-Year Inservice Inspection Program Interval ML12348A0082012-11-0909 November 2012 ASME Section XI Inservice Inspection (Isl) Program Request for Alternative - Reactor Vessel Nozzle to Safe End Butt Welds Examination Relief Requests CMP-008 and CMP-010 ML12130A2172012-04-25025 April 2012 ASME Section XI Inservice Inspection (ISI) Program Request for Alternative - Implementation of Extended Reactor Vessel Inservice Inspection Interval Relief Requests CMP-007 and CMP-009 ML0930003522009-10-27027 October 2009 Submittal of Relief Request SPT-004, Revision 2, SPT-003, Revision 2 and Elimination of NRC Bulletin 2003-02 Commitment ML0714403422007-08-0303 August 2007 Relief Request to Use Portion of 2001 Edition of American Society of Mechanical Engineers Code ML0712700162007-06-0505 June 2007 Relief, Forth 10-Year Inservice Inspection Interval Relief Request CMP-001, Revision 1 ML0633402942006-11-29029 November 2006 Surrry, Unit No. 2, Reply to Fourth 10-Year Inservice Inspection Interval Relief Request CMP-007, TAC MD2673 ML0615103652006-05-31031 May 2006 Relief, Third 10-Year ISI Interval ML0611706232006-04-27027 April 2006 Relief, Section XI Inservice Inspection Program Relief Requests PRT-07 and PRT-08 NRC Safety Evaluation Report Discrepancy ML0608701372006-04-14014 April 2006 Third 10-Year Inservice Inspection Interval Relief Requests PRT-01 and PRT-02 ML0607304682006-03-28028 March 2006 Relief, Third 10-Year Inservice Inspection Interval PRT-07 ML0605402842006-03-28028 March 2006 Third 10-Year Inservice Inspection Interval Relief Request PRT-08 ML0604405462006-02-0202 February 2006 Relief, Containment Relief Request IWL1 ML0529300322005-11-0101 November 2005 Relief, Fourth 10-Year Inservice Inspection Program, MC5586, MC5587, MC5596, MC5597, MC5598, and MC5600 ML0530402032005-11-0101 November 2005 Relief Request, Fourth 10-Year Inservice Inspection SPT-008 ML0526903172005-09-28028 September 2005 Relief Request, ASME Section XI ISI on Partial Examination (Tac No. MC4633, MC4634, MC4635, MC4636, MC4637) ML0520800062005-08-0808 August 2005 Relief, Safety Significant Socket Weld Examinations, TAC MC3134 ML0514604312005-05-20020 May 2005 RR, Correction Letter for SR-36 ML0515302482005-05-20020 May 2005 ASME Section XI Inservice Inspection Relief Request Main Steam Line Branch Connection Weldolets ML0510101962005-04-11011 April 2005 ASME Section XI Relief Request Alternative Acceptance Criteria for Surface Examinations ML0510204862005-04-0808 April 2005 RR-8, ASME IST Requirements on Spray Pumps for Revised Relief P-8 (Tac No. MC6258) ML0504806682005-02-17017 February 2005 SE, Correction for ASME ISI (Tac No. MC3142, MC3143) ML0503406172005-02-0101 February 2005 Ltr, Authorization of RR SR-036 & SR-037 ML0501804952005-01-10010 January 2005 ASME Section XI Inservice Inspection Program, End of Intervals System Pressure Testing ML0500400542005-01-0404 January 2005 Relief, Interval Request for Relief SR-004, Rev. 2, TAC MC3693 ML0429504442004-10-16016 October 2004 Relief Request, American Society of Mechanical Engineers Inservice Inspection Program Third 10-Year Interval ML0429402892004-10-11011 October 2004 ASME Section Xl Inservice Inspection Program Partial Examination Relief Request ML0427304532004-09-28028 September 2004 American Society of Mechanical Engineers Inservice Testing Program, Revised Relief Requests P-2 ML0425900412004-09-13013 September 2004 Relief, Risk-Informed Inservice Inspection Relief Request R-1 2024-08-12
[Table view] Category:Letter
MONTHYEARML24318C4622024-11-13013 November 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - License Amendment Nos. 315 and 315 Updated Information Regarding TSC Ventilation Design IR 05000280/20240032024-11-12012 November 2024 Integrated Inspection Report 05000280-2024003 and 05000281-2024003 ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20240112024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 2024-09-03
[Table view] Category:Safety Evaluation
MONTHYEARML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23244A2352023-09-18018 September 2023 – Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 – Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23061A0122023-05-0909 May 2023 Issuance of Amendment Nos. 312 and 312, Regarding Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML21201A1172021-08-0606 August 2021 Proposed Alternative Requests S1-I5-ISI-05 and S2-I5-ISI-06 to Eliminate Examination of Threads in Reactor Pressure Vessel Flange ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20321A2322020-11-20020 November 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E3522020-05-12012 May 2020 Alternative Request S2-I5-ISI-05 ASME Section XI Inservice Inspection Program Proposed Alternative Request to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Repair ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18318A0622018-12-10010 December 2018 Review of Reactor Vessel Material Surveillance Capsule Withdrawal Schedules (CAC Nos. MG0098 and MG0099; EPID L-2017-LLL-0021) ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18166A3292018-06-29029 June 2018 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML18019A1952018-01-24024 January 2018 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) 2024-08-23
[Table view] |
Text
April 5, 2004 Mr. David A. Christian Senior Vice President - Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT 1 RE: ASME SECTION XI SUBSECTION IWF, INSERVICE INSPECTION (ISI) PROGRAM RELIEF REQUEST CS-001 (TAC NO.
MB7764)
Dear Mr. Christian:
This letter grants the relief you requested in Relief Request CS-001 for Surry Power Station, Unit 1. By letter dated December 12, 2002, Virginia Electric and Power Company requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, with regard to the functional testing of snubbers.
Our evaluation and conclusion are contained in the enclosed Safety Evaluation. The NRC staff has concluded that your proposed alternative provides an acceptable level of quality and safety.
The alternative you requested is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the fourth 10-year ISI interval.
Sincerely,
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-280
Enclosure:
As stated cc w/encl: See next page
April 5, 2004 Mr. David A. Christian Senior Vice President - Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT 1 RE: ASME SECTION XI SUBSECTION IWF, INSERVICE INSPECTION (ISI) PROGRAM RELIEF REQUEST CS-001 (TAC NO.
MB7764)
Dear Mr. Christian:
This letter grants the relief you requested in Relief Request CS-001 for Surry Power Station, Unit 1. By letter dated December 12, 2002, Virginia Electric and Power Company requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, with regard to the functional testing of snubbers.
Our evaluation and conclusion are contained in the enclosed Safety Evaluation. The NRC staff has concluded that your proposed alternative provides an acceptable level of quality and safety.
The alternative you requested is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the fourth 10-year ISI interval.
Sincerely,
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-280
Enclosure:
As stated cc w/encl: See next page Distribution ALee RidsNrrPMSMonarque (Hard copy) PUBLIC RidsNrrDlpmLpdii RidsNrrLAEDunnington (Hard copy) PDII-1 R/F RidsOGCRp RidsAcrsAcnwMailCenter G. Hill (2)
RidsRgn2MailCenter KManoly Adams Accession No. ML040960543
- See previous concurrence.
OFFICE PDII-1/PM PDII-2/LA EMEB/SC OGC PDII-1/SC NAME SMonarque EDunnington KManoly GLongo JNakoski DATE 03/25/04 03/26/04 03/30/04 04/02/04 04/05/04 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR RELIEF CS-001 FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL SURRY POWER STATION, UNIT 1 VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-280
1.0 INTRODUCTION
By letter dated December 12, 2002, Virginia Electric and Power Company (the licensee) submitted relief request CS-001 for the fourth 10-year inservice inspection (ISI) interval at Surry Power Station, Unit 1 (Surry, Unit 1). The licensee requested approval to use an alternative to the ISI requirements of Article IWF-5000 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code for preservice and inservice examinations and testing of Class 1, 2, and 3 snubbers. The licensees proposed alternative consisted of a combination of the existing Surry, Unit 1 Technical Specification (TS) 4.17, Shock Suppressors (Snubbers), specific paragraphs from ASME OMa Code-1996, Subsection ISTD, Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants, and other applicable requirements of Section XI of the ASME Code. This relief would apply for the fourth 10-year interval at Surry, Unit 1.
2.0 REGULATORY EVALUATION
The ISIs of the ASME Code Class 1, 2, and 3 components are to be performed in accordance with Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," of the ASME Code and applicable addenda as required by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Paragraph 50.55a(a)(3) of 10 CFR Part 50 states, in part, that alternatives to the requirements of paragraph (g) may be used, when authorized by the Nuclear Regulatory Commission (NRC), if the licensee demonstrates that:
(i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the Enclosure
components. The regulation requires that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information will be submitted to the Commission in support of that determination and a request must be made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(i), the Commission may grant relief and/or may impose alternative requirements that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed.
The applicable edition of Section XI of the ASME Code, as proposed by the licensee for the Surry, Unit 1 fourth 10-year ISI interval, is 1998 Edition with addenda up to and including the 2000 Addenda.
3.0 TECHNICAL EVALUATION
CODE REQUIREMENTS The ASME B&PV Code,Section XI, 1998 Edition with addenda up to and including the 2000 Addenda, paragraphs IWF-5200 (a) and (b) and IWF-5300 (a) and (b), reference the use of ASME/ANSI OM-1987, Part 4, Examination and Performance Testing of Nuclear Power Plant Dynamic Restraints (Snubbers), for the requirements of the preservice and inservice examining and functional testing of Class 1, 2, and 3 snubbers.
PROPOSED ALTERNATIVE TO CODE REQUIREMENTS By letter dated December 12, 2002, the licensee proposed as an alternative to the ASME Code,Section XI requirements a snubber surveillance program comprised of the following elements:
A. The continued implementation of the surveillance requirements of TS 4.17, Shock Suppressors (Snubbers),
B. The implementation of the other applicable requirements of the ASME Code,Section XI, 1998 Edition with addenda up to and including the 2000 Addenda, unless specific approval has been obtained to do otherwise from the NRC staff pursuant to the requirements of 10 CFR 50.55a and the TS for Surry, Unit 1. This will include using the VT-3 visual examination method in IWA-2213 for preservice and inservice examinations, C. The preservice examination and testing requirements of paragraph ISTD 4, Preservice Examination, excluding paragraph 4.3, and paragraph ISTD 5, Preservice Operability Testing, and
D. As an alternative to paragraph ISTD 4.3, for systems that operate at a temperature greater than 200 degrees F, an additional preservice examination on the affected snubbers during or following the subsequent system heatup and cooldown cycle unless determined unnecessary by evaluation. This examination may be performed during operation of the plant or at the next refueling outage. This is consistent with the requirements of IWF-2200(b). No other requirements of Subsection ISTD will be implemented as part of this alternative.
BASIS FOR PROPOSED ALTERNATIVE The Surry, Unit 1 fourth ISI interval began on October 14, 2003. The incorporation of the ASME Code, 1998 Edition with addenda up to and including the 2000 Addenda, into 10 CFR 50.55a occurred on October 28, 2002. The NRC staff finds the licensees proposed implementation of the ISI program as set forth in the above addenda to be acceptable on the basis of 10 CFR 50.55a(g)(4)(iv).
In its December 12, 2002, submittal, the licensee proposed, as an alternative to the requirements of ASME/ANSI OM-1987, Part 4, to use the existing Surry, Unit 1 TS 4.17, Shock Suppressors (Snubbers), specific paragraphs from ASME OMa Code-1996, Subsection ISTD, Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants, and other applicable requirements of Section XI of the ASME Code.
The licensee stated that differences exist between the ASME Code (and hence, ASME/ANSI OM-1987, Part 4) requirements and Surry, Unit 1, TS 4.17. Specifically, ASME/ANSI OM-1987, Part 4 contains requirements that were removed from the TS upon the recommendation of Generic Letter (GL) 90-09, Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, dated December 11, 1990. However, ASME Code,Section XI continued to require the restrictive inspection schedule of ASME/ANSI OM-1987, Part 4 for inservice examination of snubbers. A later revision of OM-Part 4, Subsection ISTD of ASME OMa-1996 changed the inspection scheduling requirements to essentially agree with the recommendations of GL 90-09. The rulemaking of September 22, 1999, recognized this fact and included in the rule a provision to allow the use of Subsection ISTD provided the licensee revises the applicable TS.
It is noted that the integration of ASME Code,Section XI and Subsection ISTD into an effective coherent examination and testing program along with the required change to the TS would result in a significant amount of administrative activity without a compensating increase in safety. On this basis, the licensee proposed an alternative approach that would avoid this unnecessary administrative impact and still provide a means to accomplish the examination and testing required by ASME Code,Section XI.
The licensee stated that the current examination and testing requirements of TS 4.17 and the additional visual examination requirements of ASME Code,Section XI have formed the basis of the Surry, Unit 1 snubber inservice examination and testing program during the past ISI interval.
The use of this program was previously approved by the NRC staff and is essentially the same as the program for snubber examination and testing described in Subsection ISTD. Therefore, the licensee believes that the combination of TS 4.17 and ASME Code,Section XI, excluding paragraphs IWF-5200(a) and (b) and IWF-5300(a) and (b), is an alternative that continues to
provide an acceptable level of quality and safety for inservice examination and testing of snubbers.
However, to satisfy the preservice examination and testing requirements intended by ASME Code,Section XI, additional examination and testing activity is required beyond the above proposal for inservice activities. As such, the licensee proposes to include the requirements contained in paragraphs ISTD 4, Preservice Examination, (excluding paragraph ISTD 4.3) and ISTD 5, Preservice Operability Testing, into the current snubber surveillance program in order to provide an alternative that has an acceptable level of safety and quality for the preservice examination and testing requirements. The licensee stated that the inclusion of these requirements into the snubber surveillance program achieves the preservice inspection requirements of ASME Code,Section XI . Since ASME OMa-1996, Subsection ISTD, has been accepted by the NRC staff for the snubber preservice activities, the inclusion of paragraphs ISTD 4 and ISTD 5 into the current program is acceptable to the NRC staff.
The licensee stated that paragraph ISTD 4.3 is not proposed for incorporation into the alternative preservice examination program because it addresses requirements best suited for the initial heatup and cooldown of the plant. It would be a hardship for the NRC staff to impose these requirements on an operating plant such as Surry, Unit 1, which is constructed with a sub-atmospheric containment. As an alternative to the requirements of paragraph ISTD 4.3, the licensee will follow the guidance of paragraph IWF-2220(b) for systems that operate at a temperature greater than 200 degrees F. Paragraph IWF-2220(b) requires the owner to perform an additional preservice examination on the affected component supports during or following the subsequent system heatup and cooldown cycle unless determined unnecessary by evaluation. On the basis that the above ASME Code,Section XI requirements have been accepted by regulation as providing an acceptable level of quality and safety, the NRC staff finds these requirements acceptable as an alternative preservice examination for the supports.
The NRC staff has reviewed the information provided in the licensees submittal of December 12, 2002, and finds that the above alternative program provides an acceptable level of quality and safety without the burden of administrative changes that add little or no value to quality or safety, and without the hardship of performing snubber assessments under sub-atmospheric conditions.
4.0 CONCLUSION
Based on the information provided by the licensee, the NRC staff concludes that the licensee has presented an adequate justification for relief from the requirements of ASME Code,Section XI, 1998 Edition with addenda up to and including the 2000 Addenda, paragraphs IWF-5200 (a) and (b) and IWF-5300 (a) and (b), with regard to visual examination and functional testing of the Surry, Unit 1 Class 1, 2, and 3 snubbers. The NRC staff concludes that the proposed alternative provides an acceptable level of quality and safety for supports and thus ensures structural integrity of the related systems. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the licensee's request for relief relating to the fourth 10-year interval of the Surry, Unit 1 ISI program is authorized.
Principal Contributor: A. J. Lee Date: April 5, 2004
Surry Power Station, Units 1 and 2 Virginia Electric and Power Company cc:
Ms. Lillian M. Cuoco, Esq. Office of the Attorney General Senior Counsel Commonwealth of Virginia Dominion Resources Services, Inc. 900 East Main Street Building 475, 5th Floor Richmond, Virginia 23219 Rope Ferry Road Rt. 156 Mr. Chris L. Funderburk, Director Waterford, Connecticut 06385 Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Mr. Richard H. Blount, II Innsbrook Technical Center Site Vice President 5000 Dominion Blvd.
Surry Power Station Glen Allen, Virginia 23060-6711 Virginia Electric and Power Company 5570 Hog Island Road Mr. Jack M. Davis Surry, Virginia 23883-0315 Site Vice President North Anna Power Station Senior Resident Inspector Virginia Electric and Power Company Surry Power Station P. O. Box 402 U. S. Nuclear Regulatory Commission Mineral, Virginia 23117-0402 5850 Hog Island Road Surry, Virginia 23883 Mr. William R. Matthews Vice President - Nuclear Operations Chairman Virginia Electric and Power Company Board of Supervisors of Surry County Innsbrook Technical Center Surry County Courthouse 5000 Dominion Boulevard Surry, Virginia 23683 Glen Allen, Virginia 23060-6711 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23218 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218