ML041410099

From kanterella
Jump to navigation Jump to search
E-mail on 04/02/04 - Fanp Attendance for 04/01 Telecon - CRDM Repair Analysis - with NRC
ML041410099
Person / Time
Site: Millstone, Calvert Cliffs, Davis Besse, Oconee, Saint Lucie, Point Beach, Arkansas Nuclear, Surry, Turkey Point, Crystal River, South Texas, Crane  NextEra Energy icon.png
Issue date: 04/02/2004
From: Davant G
Entergy Operations
To: Alexion T
NRC/NRR/DLPM/LPD4
Alexion T W, NRR/DLPM, 415-1326
References
Download: ML041410099 (3)


Text

Thomas Alexion - FW: FANP Attendance for 4/01 Telecon - CRDM Repair Analysis - w/NRC From:

'DAVANT, GUY Ha <GDAVANT~entergy.com>

To:

"'twaanrc.gov"' <twa~nrc.gov>

Date:

4/2/04 10:53AM

Subject:

FW: FANP Attendance for 4101 Telecon - CRDM Repair Analysis - w/NRC

Tom, Participating on the call yesterday for Entergy were:

Steve Lewis Jai Brihmedesam Guy Davant The Framatome participants and the list of plants using the Framatome repair analysis are provided in the e-mail below.

Thanks!

Guy


Original Message-----

From: SON Steve [1]

Sent: Thursday, April 01, 2004 5:13 PM To: DAVANT, GUY H Cc: MIGNOGNA Gary M

Subject:

FANP Attendance for 4/01 Telecon - CRDM Repair Analysis - w/NRC Guy:

For information to pass on to the NRC, the following is a list of FANP people participating in the telecon today.

Gary Mignogna, VP, Component Replacement & Repair Dave Waskey, Manager, Welding Services Alvin McKim, Manager, Materials & Structural Analysis Bill Behnke Doug Killian Ben Grambau Steve Son For the question on plants affected, the following is the list of plants identified by Gary Mignogna RV Head Repairs Oconee 1 (2 outages)

Oconee 2 (2 outages)

Oconee 3 (2 outages)

Millstone 2 (2 outages)

CR-3 TMI-1 Davis Besse St. Lucie 2 Surry 1 ANO-1

w

,:.__._.a:.A I_

i

... ;-=o

' __.'. :T^_e-x': ii- 'F. :'F....- Ate 'd' ' ' '

4' 0

'ec'

'n-

_C D

-e ai Ana

-y is -

m

^

I Thomas Aiexion-FW: FANP Attendance for 4/01 Telecon-CRDM Repair Analysis-w/NRC Page2q Other Repairs STP - (BM Nozzles)

CR Pressurizer RV Head Non Repair Turkey Point 3 Turkey Point 4 Calvert Cliffs 1 Calvert Cliffs 2 Point Beach 1 Point Beach 2 St. Lucie 1 Surry 2 Thanks Steve Son Project Manager- -

CC:

'LEWIS, RAYMOND S <RLEWIS1 @entergy.com>

I :\\WI-ND0WS\\TEMP\\GW}O00001.TMP

'Page 1 l C:\\WINDOWS\\TEMP\\GWIOQQO1.TMP PaQe 1 i Mail Envelope Properties (406D8C6E.F7C:12: 49020)

Subject:

Creation Date:

From:

Created By:

FW: FANP Attendance for 4/01 Telecon - CRDM Repair Analysis -

w/NRC 4/2/04 10:49AM "DAVANT, GUY H" <GDAVANT@entergy.com>

GDAVANT@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) entergy.com RLEWIS 1 CC (LEWIS, RAYMOND S)

Post Office owf4po.OWFNDO Files MESSAGE Part.001 Mime.822 Options Expiration Date:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

Route nrc.gov entergy.com Size 1486 8317 11300 Date & Time 04/02/04 10:49AM None Standard No None No Standard