Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML04203012730 June 2004Safety Analysis Report for Extended Power UprateSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Anticipated operational occurrence
Time to boil
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Temporary Modification
High Energy Line Break
Significance Determination Process
Feedwater Controller Failure
MELLLA
Eddy Current Testing
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Siren
Power Uprate
Failure to Scram
Overspeed trip
Simmer margin
Subsequent actuation
ML04184011630 June 2004Proposed Technical Specifications Change TS-431, Extended Power Uprate UFSAR Review Matrix, Enclosure 6Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Time to boil
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Finite Element Analysis
High Energy Line Break
Significance Determination Process
Flow Accelerated Corrosion
Feedwater Heater
Intergranular Stress Corrosion Cracking
Feedwater Controller Failure
Large early release frequency
MELLLA
Stress corrosion cracking
Eddy Current Testing
Turbine Missile
Fuel cladding
Fire Protection Program
Flow Induced Vibration
GOTHIC
Power Uprate
Failure to Scram
Overspeed trip
Simmer margin
Subsequent actuation
Water hammer
ML04196015829 June 2004(BFN) - Unit 3 - American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection, Containment Inspection (We), and Repair and Replacements Programs - Summary Reports (NIS-1 and NIS-2) for Cycle 11 OperationHydrostatic
Coatings
Anchor Darling
Nondestructive Examination
VT-2
Eddy Current Testing
EVT-1
Liquid penetrant
Through Wall Leak
Dissimilar Metal Weld
Thermal fatigue
TAC:MC289228 June 2004
ML04197022128 June 2004RAI, Security Plan Sections 1-9 (TAC MC2892, MC2893, MC2894, MC2988, MC2972, and MC2973)
ML04181016828 June 2004Summary of Telephone Conference on May 27, 2004, Between the U.S. NRC and the Tennessee Valley Authority Concerning Draft Requests for Additional Information on Browns Ferry Nuclear Plant, Units 1, 2 and 3 LRALicense Renewal
ML04174001921 June 20046/21/04, Browns Ferry, Units 1, 2 & 3, RAI, Alternative Source Term ImplementationPower Uprate
TAC:MC133121 June 2004
ML04174042921 June 2004RAI, Generic Letter 88-20Large early release frequency
ML04174000721 June 20046/21/04, Browns Ferry, Unit 1, Safety Evaluation, First 10-Year Interval Inservice Inspection Request to Use the 1995 Edition Through 1996 Addenda, Article IWA-5000 of the ASME Code, Section XIHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML04167000514 June 2004EA-04-063 Response. Acknowledgment of Receipt of Response Dated 06/02/2004 to Notice of Violation Dated 05/12/2004
ML04195010010 June 2004Audit and Review Plan for Plant Aging Management Programs and Reviews - Browns Ferry Nuclear Plant, Units 1, 2 and 3Fire Barrier
Coatings
Aging Management
Stress corrosion cracking
Moisture barrier
License Renewal
Biofouling
Fire Protection Program
ML0603806779 June 2004TVA Calculation CDQ1 074 2004 0160, Rev 0, HCLPF Calculations of RHR Heat Exchanger Anchorage for Seismic IPEEE Program.Safe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Weak link
ML0603806769 June 2004TVA Calculation CDQ1 999 2004 0156, Rev. 0, HCLPF Calculations of MCC Anchorage for Seismic IPEEE Program.Safe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Weak link
ML0416102349 June 2004May 2004 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3
ML0416000953 June 2004Comment (6) of Frances Lamberts on Renewal of the Browns Ferry Nuclear Plant, Units 1, 2, and 3
ML0416001012 June 2004Comment (467) of M. Bowden Regarding Public Comment on Draft Criteria on Manual Actions to Achieve Post-Fire Safe ShutdownSafe Shutdown
ML0415600422 June 2004NRC Inspection Report 50-259/2004-011 - Reply to Notice of Violation (NOV) EA-04-063
ML0415503121 June 2004Changes to Distribution Lists for TVA Dockets
ML04154038328 May 2004Comment (3) of Mark J. Burzynski on Proposed Generic Letter (GL) 2004-XX; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (PWR)Backfit
ML04279035727 May 2004Existing Policies on Invasive SpeciesZebra Mussel
ML04280017627 May 2004Mussel Study Near Hobbs Island on the Tennessee River for Butler Basin Marina.
ML04279030927 May 2004PNNL Questions on Er Alternatives Section
ML04279031227 May 2004PNNL Question on BFN Area Municipal Potable Water Sources
ML04279031427 May 2004BFN Relicensing Er Information Needs - March 2004 Socioeconomics & Ej
ML04279031627 May 2004Summary of Statutory and Other Legal Restrictions on Water Use in the Vicinity of BFN
ML04279031727 May 2004BFN Intake Performance Characteristics
ML04279031827 May 2004BFN Projects Employment
ML04279034427 May 2004Occupational Radiation Dose Summary 2001-2003
ML04279034827 May 2004Table, BFN (Solid) Radwaste Generation Fiscal Year Volume for 1998-2003 and Goals for 2004-2008
ML04279035127 May 2004NUREG 1437 Vol. 1 Section 4.6.3 Occupational Radiation Dose, Outline of BFN SEIS Section 4.3.21.1.1 Analysis of Occupational Radiation Dose 91License Renewal
ML04279037527 May 2004Site - Well Map
ML04279037827 May 2004Spreadsheet - BFN Groundwater Elevations/Well Level Data
ML04279038027 May 2004Spreadsheet - BFN Well Physical Description
ML04280005227 May 2004Zebra Mussels: Biology, Impacts, and Control, Chapter 13Zebra Mussel
ML04279038727 May 2004Power Point Presentation on Wetland Reviews
ML04279039627 May 2004Adem Final Listing Decision for Wheeler Reservoir on the Tennessee River Waterbody Identification Number Al/Wheelerresol Ph Temperature/Thermal Modification
ML04279049427 May 2004Note of Personal Communication with Jeffrey Garner, State Malacologist, Alabama Division of Wildlife and Freshwater Fisheries, at 12/2001 Regional Freshwater Mollusk Conservation Society Meeting
ML04279051227 May 2004Sport Fishing Index (Sfi) - a Method to Quantify Sport Fishing Quality
ML04280004127 May 2004Note of Personal Communication - Reference to Leroy M. Koch, Us Fish and Wildlife Service (in Larry E. Goldman, Field Supervisor, Us Fish and Wildlife Service, Daphne, Alabama)
ML04147006026 May 2004Independent Survey of Power-Reactor Licensees
ML04145040021 May 2004Supplemental Response to April 29, 2003, Order Requiring Compliance with Revised Design Basis Threat (DBT) for Operating Power Reactors (EA-03-086) for Browns Ferry Nuclear Plant (Bfn), Units 1, 2 & 3; Sequoyah Nuclear (Sqn), Units 1 & 2; a
ML04141023520 May 2004NRC Examination Report 05000259-04-301, 05000260-04-301, and 05000296-04-301
ML04142009519 May 2004Nuclear Regulatory Commission (NRC) - Use of Encryption Software for Electronic Transmission of Safeguards Information (SGI) for Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants
ML04155014819 May 2004United States Department of Interior - Fish and Wildlife Service Response to Letter from NRC Staff Dated March 4, 2004 - to Prepare a SEIS for Browns Ferry Nuclear Plant
ML04139028617 May 2004Response to Request for Additional Information (RAI) and Unit 1 Analyses Results Related to Technical Specifications (TS) Change No. TS-405 - Alternative Source Term (AST)Post Accident Monitoring
Squib
Local Leak Rate Testing
Exemption Request
Maintenance Rule Program
Manual Operator Action
ML04279037317 May 2004Spreadsheet - BFN Circulating Cooling Water Flows
ML04134058113 May 2004April 2004 Monthly Operating Report for Browns Ferry
IR 05000259/200401112 May 2004IR 05000259-04-011, on 02/13/2004, Tennessee Valley Authority, Browns Ferry Unit 1
ML04184031811 May 2004Summary of Staff Meeting on Appendix F of Browns Ferry Nuclear LRA