Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML17075A27828 February 2017Calvert CliffsPart 21 - Potential Transducer Component Defect
ML17006A01222 December 2016Calvert CliffsPart 21 - Potential Transducer Component Defect
ML16294A26418 October 2016Calvert Cliffs
Palo Verde
Fermi
Catawba
Oyster Creek
Watts Bar
Grand Gulf
Cooper
Arkansas Nuclear
Three Mile Island
Columbia
River Bend
Waterford
Clinton
Fort Calhoun
05000470
Part 21 Report - Defective Current to Pressure Transducers
ML16021A45016 November 2015SeabrookLetter from William M. Manzi, III, Et Al., Board of Selectmen, Town of Seabrook, New Hampshire, to Chairman Stephen G. Burns Regarding the Seabrook Nuclear Station
IR 05000275/201500313 November 2015Diablo CanyonIR05000275/2015003, 05000323/2015003, and 07200026/2015001 July 1, 2015 Through September 30, 2015, Diablo Canyon Power Plant - NRC Integrated Inspection Report
IR 05000275/20150021 October 2015Diablo CanyonIR 05000275/2015002, 05000323/2015002; on 04/01/2015 06/30/2015; Diablo Canyon Power Plant; Fire Protection, Licensed Operator Requalification, Problem Identification and Resolution, Follow-up of Events and Notices of Enforcement Discretion
ML14353A0603 November 2014Davis Besse2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station
WO 14-0054, Response to NRC Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations27 May 2014Wolf CreekResponse to NRC Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations
ML18100A19022 May 2014MonticelloEnclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records
WO 14-0043, Supplemental Information in Support of the License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis Methodologies13 May 2014Wolf CreekSupplemental Information in Support of the License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis Methodologies
WO 14-0037, Closure of Essential Service Water System Corrosion Monitoring Commitment1 April 2014Wolf CreekClosure of Essential Service Water System Corrosion Monitoring Commitment
WO 14-0023, Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.231 March 2014Wolf CreekRequest for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2
WO 14-0042, Operating Corp.'S Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.31 March 2014Wolf CreekOperating Corp.'S Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.
WO 14-0033, Operating Corporation - Redacted Version of License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date31 March 2014Wolf CreekOperating Corporation - Redacted Version of License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date
WO 14-0032, Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis26 March 2014Wolf CreekSupplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis
WO 14-0038, Request for Interpretation of Technical Specification 3.7.11, Control Room Air Conditioning System (Cracs).21 March 2014Wolf CreekRequest for Interpretation of Technical Specification 3.7.11, Control Room Air Conditioning System (Cracs).
WO 14-0031, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis20 March 2014Wolf CreekResponse to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis
WO 14-0024, Changes to Technical Specification Bases - Revisions 57 Through 6011 March 2014Wolf CreekChanges to Technical Specification Bases - Revisions 57 Through 60
ML18100A19130 January 2014MonticelloEnclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear Nuhoms 61BTH Type 1 & 2 Transportable Canister for BWR Fuel
WO 14-0004, Supporting Documentation for Requested Regulatory Conference (EA-13-199)15 January 2014Wolf CreekSupporting Documentation for Requested Regulatory Conference (EA-13-199)
WO 14-0002, Operating Corporation - 10 CFR 50.55a Requests 13R-08 and 13R-09 for the Third Inservice Inspection Program Interval8 January 2014Wolf CreekOperating Corporation - 10 CFR 50.55a Requests 13R-08 and 13R-09 for the Third Inservice Inspection Program Interval
WO 13-0104, Request for Regulatory Conference (EA-13-199)19 December 2013Wolf CreekRequest for Regulatory Conference (EA-13-199)
WO 13-0089, Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process17 December 2013Wolf CreekPlant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process
ML14002A26217 December 2013South TexasComment (1) of Rhonda Smith on Behalf of Us Environmental Protection Agency (EPA) Review of the Supplement 48 Final Report to the Generic Environmental Impact Statement on License Renewal of South Texas, Units 1 and 2
WO 13-0075, Five Year Re-Certification of the Wolf Creek Nuclear Operating Corporation Standard Practice Procedures Plan7 October 2013Wolf CreekFive Year Re-Certification of the Wolf Creek Nuclear Operating Corporation Standard Practice Procedures Plan
WO 13-0070, Reply to Notice of Violation EA-13-08412 September 2013Wolf CreekReply to Notice of Violation EA-13-084
WO 13-0068, Revision to Commitment Made in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Ac29 August 2013Wolf CreekRevision to Commitment Made in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acci
RBG-47386, Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat.19 August 2013River BendAttachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat.
WO 13-0065, Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations15 August 2013Wolf CreekRevised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations
WO 13-0050, Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating.19 June 2013Wolf CreekRequest for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating.
WO 13-0038, Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System28 May 2013Wolf CreekOperating Corporation - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System
WO 13-0033, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident29 April 2013Wolf CreekDay Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13108A2175 April 2013PilgrimProposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d)
ML13063A06328 February 2013PilgrimOverall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML13063A09728 February 2013PilgrimOverall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool, Instrumentation (Order Number EA-12-051)
ML13070A02628 February 2013Wolf CreekOperating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
WO 13-0015, Operating Corporation - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2013Wolf CreekOperating Corporation - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML13063A09528 February 2013PilgrimOverall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)
WO 13-0010, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System.25 February 2013Wolf CreekResponse to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System.
ML13030A42829 January 2013PilgrimResponse to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach
WO 13-0002, Request for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating.11 January 2013Wolf CreekRequest for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating.
WO 12-0071, Revision to a Commitment Made in Reply to Notice of Violation EA-12-13513 December 2012Wolf CreekRevision to a Commitment Made in Reply to Notice of Violation EA-12-135
WO 12-0074, Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating.7 December 2012Wolf CreekOperating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating.
ML12340A37427 November 2012PilgrimSeismic Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12333A32127 November 2012PilgrimFlooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
WO 12-0066, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.21 November 2012Wolf CreekLicense Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.
ML12312A46929 October 2012PilgrimInitial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12312A46729 October 2012PilgrimInitial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML12312A46829 October 2012PilgrimInitial Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)
ML12307A43218 October 2012PilgrimFollowup to Completion of Activities to Support Entry Into the Period of Extended Operation Entergy Nuclear Operations, Inc