Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML17075A278 | 28 February 2017 | Calvert Cliffs | Part 21 - Potential Transducer Component Defect |
ML17006A012 | 22 December 2016 | Calvert Cliffs | Part 21 - Potential Transducer Component Defect |
ML16294A264 | 18 October 2016 | Calvert Cliffs Palo Verde Fermi Catawba Oyster Creek Watts Bar Grand Gulf Cooper Arkansas Nuclear Three Mile Island Columbia River Bend Waterford Clinton Fort Calhoun 05000470 | Part 21 Report - Defective Current to Pressure Transducers |
ML16021A450 | 16 November 2015 | Seabrook | Letter from William M. Manzi, III, Et Al., Board of Selectmen, Town of Seabrook, New Hampshire, to Chairman Stephen G. Burns Regarding the Seabrook Nuclear Station |
IR 05000275/2015003 | 13 November 2015 | Diablo Canyon | IR05000275/2015003, 05000323/2015003, and 07200026/2015001 July 1, 2015 Through September 30, 2015, Diablo Canyon Power Plant - NRC Integrated Inspection Report |
IR 05000275/2015002 | 1 October 2015 | Diablo Canyon | IR 05000275/2015002, 05000323/2015002; on 04/01/2015 06/30/2015; Diablo Canyon Power Plant; Fire Protection, Licensed Operator Requalification, Problem Identification and Resolution, Follow-up of Events and Notices of Enforcement Discretion |
ML14353A060 | 3 November 2014 | Davis Besse | 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station |
WO 14-0054, Response to NRC Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations | 27 May 2014 | Wolf Creek | Response to NRC Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations |
ML18100A190 | 22 May 2014 | Monticello | Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records |
WO 14-0043, Supplemental Information in Support of the License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis Methodologies | 13 May 2014 | Wolf Creek | Supplemental Information in Support of the License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis Methodologies |
WO 14-0037, Closure of Essential Service Water System Corrosion Monitoring Commitment | 1 April 2014 | Wolf Creek | Closure of Essential Service Water System Corrosion Monitoring Commitment |
WO 14-0023, Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2 | 31 March 2014 | Wolf Creek | Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2 |
WO 14-0042, Operating Corp.'S Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. | 31 March 2014 | Wolf Creek | Operating Corp.'S Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. |
WO 14-0033, Operating Corporation - Redacted Version of License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date | 31 March 2014 | Wolf Creek | Operating Corporation - Redacted Version of License Amendment Request (LAR) for Revision to Cyber Security Plan Implementation Schedule Completion Date |
WO 14-0032, Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis | 26 March 2014 | Wolf Creek | Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis |
WO 14-0038, Request for Interpretation of Technical Specification 3.7.11, Control Room Air Conditioning System (Cracs). | 21 March 2014 | Wolf Creek | Request for Interpretation of Technical Specification 3.7.11, Control Room Air Conditioning System (Cracs). |
WO 14-0031, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis | 20 March 2014 | Wolf Creek | Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis |
WO 14-0024, Changes to Technical Specification Bases - Revisions 57 Through 60 | 11 March 2014 | Wolf Creek | Changes to Technical Specification Bases - Revisions 57 Through 60 |
ML18100A191 | 30 January 2014 | Monticello | Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear Nuhoms 61BTH Type 1 & 2 Transportable Canister for BWR Fuel |
WO 14-0004, Supporting Documentation for Requested Regulatory Conference (EA-13-199) | 15 January 2014 | Wolf Creek | Supporting Documentation for Requested Regulatory Conference (EA-13-199) |
WO 14-0002, Operating Corporation - 10 CFR 50.55a Requests 13R-08 and 13R-09 for the Third Inservice Inspection Program Interval | 8 January 2014 | Wolf Creek | Operating Corporation - 10 CFR 50.55a Requests 13R-08 and 13R-09 for the Third Inservice Inspection Program Interval |
WO 13-0104, Request for Regulatory Conference (EA-13-199) | 19 December 2013 | Wolf Creek | Request for Regulatory Conference (EA-13-199) |
WO 13-0089, Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process | 17 December 2013 | Wolf Creek | Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process |
ML14002A262 | 17 December 2013 | South Texas | Comment (1) of Rhonda Smith on Behalf of Us Environmental Protection Agency (EPA) Review of the Supplement 48 Final Report to the Generic Environmental Impact Statement on License Renewal of South Texas, Units 1 and 2 |
WO 13-0075, Five Year Re-Certification of the Wolf Creek Nuclear Operating Corporation Standard Practice Procedures Plan | 7 October 2013 | Wolf Creek | Five Year Re-Certification of the Wolf Creek Nuclear Operating Corporation Standard Practice Procedures Plan |
WO 13-0070, Reply to Notice of Violation EA-13-084 | 12 September 2013 | Wolf Creek | Reply to Notice of Violation EA-13-084 |
WO 13-0068, Revision to Commitment Made in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Ac | 29 August 2013 | Wolf Creek | Revision to Commitment Made in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acci |
RBG-47386, Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat. | 19 August 2013 | River Bend | Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat. |
WO 13-0065, Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations | 15 August 2013 | Wolf Creek | Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations |
WO 13-0050, Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating. | 19 June 2013 | Wolf Creek | Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating. |
WO 13-0038, Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System | 28 May 2013 | Wolf Creek | Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System |
WO 13-0033, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 29 April 2013 | Wolf Creek | Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML13108A217 | 5 April 2013 | Pilgrim | Proposed License Amendment: Revision to Technical Specification 2.1, Safety Limits to Resolve Pressure Regulator Fail-Open (PRFO) Transient Reported by General Electric Nuclear Energy in Accordance with 10 CFR 21.21(d) |
ML13063A063 | 28 February 2013 | Pilgrim | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML13063A097 | 28 February 2013 | Pilgrim | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool, Instrumentation (Order Number EA-12-051) |
ML13070A026 | 28 February 2013 | Wolf Creek | Operating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
WO 13-0015, Operating Corporation - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 February 2013 | Wolf Creek | Operating Corporation - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
ML13063A095 | 28 February 2013 | Pilgrim | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) |
WO 13-0010, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System. | 25 February 2013 | Wolf Creek | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System. |
ML13030A428 | 29 January 2013 | Pilgrim | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach |
WO 13-0002, Request for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating. | 11 January 2013 | Wolf Creek | Request for Notice of Enforcement Discretion from Technical Specification 3.8.1, AC Sources - Operating. |
WO 12-0071, Revision to a Commitment Made in Reply to Notice of Violation EA-12-135 | 13 December 2012 | Wolf Creek | Revision to a Commitment Made in Reply to Notice of Violation EA-12-135 |
WO 12-0074, Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating. | 7 December 2012 | Wolf Creek | Operating Corp.,- Response to Supplemental Question Concerning a Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating. |
ML12340A374 | 27 November 2012 | Pilgrim | Seismic Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML12333A321 | 27 November 2012 | Pilgrim | Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
WO 12-0066, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System. | 21 November 2012 | Wolf Creek | License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System. |
ML12312A469 | 29 October 2012 | Pilgrim | Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
ML12312A467 | 29 October 2012 | Pilgrim | Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML12312A468 | 29 October 2012 | Pilgrim | Initial Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) |
ML12307A432 | 18 October 2012 | Pilgrim | Followup to Completion of Activities to Support Entry Into the Period of Extended Operation Entergy Nuclear Operations, Inc |