En tergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Robert G. Smith, RE.
Site Vice President January 29, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control, Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35
REFERENCES:
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, March 12, 2012 (ADAMS Accession No. ML12053A340)
- 2. NRC Interim Staff Guidance JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Revision 0 (ADAMS Accession No. ML12311A214)
- 3. NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, December 3, 2012 (ADAMS Accession No. ML12326A912)
LETTER NUMBER 2.13.005
Dear Sir or Madam:
On March 12, 2012, the NRC staff issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding. Item 2 of Enclosure 2 to Reference 1 requests an Integrated Assessment Report from plant sites whose reevaluated flooding hazard is not bounded by their current design basis. Further, Required Response 1 states: 'Within 60 days of the date of the NRC's issuance of guidance on implementation details of the Integrated Assessment Report, including criteria for identifying vulnerabilities, submit an approach for developing an Integrated Assessment Report including criteria for identifying vulnerabilities."
The following is Entergy Nuclear Operations, Inc (Entergy) 60-day response to Required Response 1.
On November 30, 2012, the NRC issued the Reference 2 Interim Staff Guidance. Entergy commits to use the Reference 2 guidance as the approach for developing the NTTF 2.1 flooding Integrated Assessment Report for Pilgrim Nuclear Power Station if the reevaluated flooding hazard is not bounded by the current design basis flooding evaluation.
SDD
PNPS Letter 2.13.005 Page 2 of 3 Entergy also commits to use the guidance provided in Reference 3 regarding the trigger conditions and scope of any required Integrated Assessment.
This letter contains two new regulatory commitments, which are identified in the attachment.
Should you have any questions concerning the content of this letter, please contact Mr.
Joseph R. Lynch at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct; executed on January 29, 2013.
Sincerely, Robert G. Smith Site Vice President RGS/rmb
Attachment:
Pilgrim Nuclear Power Station (PNPS) List of Regulatory Commitments cc:
Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission ATTN: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Richard V. Guzman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 U. S. Nuclear Regulatory Commission ATTN: Robert J. Fretz Jr.
Mail Stop OWFN/4A15A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert L. Dennig Mail Stop OWFN/10E1 11555 Rockville Pike Rockville, MD 20852-2378
PNPS Letter 2.13.005 Page 3 of 3 cc:
(continued)
U. S. Nuclear Regulatory Commission ATTN: G. Edward Miller Mail Stop OWFN/8B1A 11555 Rockville Pike Rockville, MD 20852-2378 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
ATTACHMENT PNPS Letter 2.13.005 Pilgrim Nuclear Power Station (PNPS)
LIST OF REGULATORY COMMITMENTS
Attachment to PNPS Letter 2.13.005 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED (Check One),
COMPLETION DATE COMMITMENT N
IUAT;.
COMMITMENT
.ONE-CO 'CNTINUING TIME COMPLIANCE* *
(If Required)
ACTION Entergy commits to use Interim Staff March 12, 2017 Guidance JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Revision 0 guidance as the
[Upon submittal of the approach for developing the NTTF 2.1 Integrated Assessment flooding Integrated Assessment Report for Report, if required, PNPS if the reevaluated flooding hazard is not which is two years bounded by the current design basis flooding following submittal of evaluation, the site's Hazard PNPS Commitment No. A16860 Reevaluation Report.]
Entergy commits to use the guidance provided March 12, 2017 in NRC Letter, D.L. Skeen (NRC) to J.E.
Pollock (NEI), Trigger Conditions for
[Upon submittal of the Performing an Integrated Assessment and Integrated Assessment Due Date for Response, regarding the trigger Report, if required, conditions and scope of any required which is two years Integrated Assessment.
following submittal of PNPS Commitment No. Al 6861 the site's Hazard Reevaluation Report.]