ML23354A005 | 8 January 2024 | Robinson | Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 |
ML24002A738 | 2 January 2024 | Robinson | NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2 |
ML23262B450 | 19 September 2023 | Robinson | NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology |
ML23248A261 | 5 September 2023 | Brunswick | NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process |
ML23235A153 | 23 August 2023 | Observation Public Meeting, August 23, 2023 - Nuclear Regulatory Commission (NRC) & Nuclear Energy Institute (NEI) Follow-up/Responses to April 13, 2023, Regulatory Issues Task Force (RITF) License Amendment Request (LAR) Process Observatio | |
ML23220A234 | 8 August 2023 | Robinson | NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule |
ML23208A201 | 27 July 2023 | NRC Slides for Aug 4, 2023 Public Meeting with PWROG TR PWROG-18068-NP | |
ML23123A088 | 24 July 2023 | Final Safety Evaluation by the Office of Nuclear Reactor Regulation for the Pressurized Water Reactor Owners Group - Topical Report WCAP-17096-NP, Revision 3, Reactor Internals Acceptance Criteria Methodology and Date Requirements | |
ML23205A153 | 24 July 2023 | NRC Transmittal of Final Safety Evaluation for WCAP-17096-NP, Revision 3 | |
ML23193A746 | 11 July 2023 | NRC Transmittal of the Draft Safety Evaluation for PWROG-21001-P/NP, Revision 0 - Email | |
ML23186A090 | 6 July 2023 | July 6, 2023 Observation Public Meeting NRC Slides - Raptr - PWROG-22010-NP | |
ML23096A138 | 11 April 2023 | Davis Besse | Review of the Spring 2022 Steam Generator Tube Inspection Report |
ML23086B986 | 27 March 2023 | Davis Besse | NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 |
ML23033A527 | 8 February 2023 | Harris | Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 |
ML22329A298 | 19 January 2023 | Robinson | Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 |
ML23011A015 | 11 January 2023 | Robinson | NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b |
ML23006A064 | 6 January 2023 | Brunswick | NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 |
ML23006A189 | 6 January 2023 | Brunswick | NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 |
ML22294A092 | 15 December 2022 | Robinson | Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 |
ML22269A358 | 15 November 2022 | Davis Besse | Issuance of Amendment No. 305 Revising the Emergency Plan |
ML22256A253 | 14 November 2022 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 |
ML22305A575 | 4 November 2022 | Davis Besse | Request for Withholding Information Regarding Reanalysis of the Protection Against Low Temperature Reactor Coolant System Overpressure Events |
ML22285A155 | 12 October 2022 | Robinson | NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b |
ML22262A288 | 3 October 2022 | Robinson | Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 |
ML22236A670 | 30 August 2022 | Peach Bottom | Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1, |
ML22230D069 | 22 August 2022 | Brunswick | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident |
ML22222A108 | 10 August 2022 | Robinson | NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 |
ML22213A068 | 5 August 2022 | Robinson | Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 |
ML22159A295 | 3 August 2022 | Robinson | Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves |
ML22207B830 | 28 July 2022 | Sequoyah | Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 |
ML22203A112 | 25 July 2022 | Sequoyah | Summary of Verbal Authorization of Alternative Request RP-12 for the 1B-B Centrifugal Charging Pump |
ML22166A018 | 7 July 2022 | Robinson | Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force |
ML22186A177 | 7 July 2022 | Peach Bottom | Request for Withholding Information from Public Disclosure Peach Bottom Atomic Power Station, Unit 2 |
ML22028A174 | 12 May 2022 | Brunswick | Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 |
ML22082A268 | 2 May 2022 | Brunswick | Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 |
ML22020A228 | 16 March 2022 | Browns Ferry | Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 |
ML22054A215 | 8 March 2022 | Brunswick | Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications |
ML22035A126 | 9 February 2022 | Brunswick | Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) |
ML22038A157 | 7 February 2022 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 |
ML21341A554 | 29 December 2021 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire Lee | Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate |
ML21357A047 | 23 December 2021 | Brunswick | NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 |
ML21348A719 | 21 December 2021 | Brunswick | Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times |
ML21271A137 | 16 December 2021 | Watts Bar | Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building |
ML21334A301 | 30 November 2021 | Browns Ferry | NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance of License Amendment Request Regarding Adoption of TSTF-568-A |
ML21266A053 | 20 October 2021 | Browns Ferry | Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 |
ML21273A192 | 12 October 2021 | Browns Ferry | September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect |
ML21120A219 | 4 May 2021 | Watts Bar | April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control |
ML21099A207 | 13 April 2021 | Watts Bar | Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements |
ML21060B053 | 3 March 2021 | Watts Bar | Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology |