ML23186A090
| ML23186A090 | |
| Person / Time | |
|---|---|
| Issue date: | 07/06/2023 |
| From: | Luke Haeg, Ngola Otto Licensing Processes Branch |
| To: | |
| References | |
| PWROG-22010-NP, Rev 0 | |
| Download: ML23186A090 (1) | |
Text
PWROG-22010-NP, Revision 0, Risk Assessment Process for Review of Topical Reports (RAPTR)
Observation Public Meeting July 6, 2023
Agenda
- 10:00 am Opening Remarks & Introductions
- 10:15 am Overview of Topical Report Process (NRC)
- 10:30 am Discussion of PWROG-22010-NP (NRC/PWROG)
- 11:15 am Public Comment Period
- 11:30 am Adjourn
Opening Remarks
- Purpose of meeting
- Logistics
- Meeting feedback
- Introductions
- Remarks from NRC
TOPICAL REPORTS NGOLA OTTO Project Manager Division of Operating Reactor Licensing, NRR 2023 U.S. NRC - RAPTR MEETING
LIC-500 - TOPICAL REPORT PROCESS The latest revision added 3 New Review Pathways to Increase Efficiency and Timeliness.
Compressed, Uncomplicated, and SE Confirmation Reviews Traditional Review Maintained Standard Review (24 months)
Process Efficiencies Shorter timelines E-mail transmittals of RAIs, Draft and Final safety evaluation (SE), audits, four new NRC Forms (895-898).
Sponsor can suggest Pathway based on pre-submittal discussions, however, NRC makes selection.
TOPICAL REPORT REVIEW PATHWAYS Standard
[24 mo.]
Not a Previously Approved TR Complex
- TRs, Extensive Scope Requiring Significant Effort Compressed
[12 mo.]
Not a Previously Approved TR Non-complex TRs, Scope Requiring Less Effort Than Standard Review Uncomplicated
[6 - 12 mo.]
Revision to an Approved TR Proposed TR changes and revisions are extensive (not minimal), and the scope of the review is narrow SE Confirmation
[3 - 6 mo.]
Revision to an Approved TR Proposed TR changes/revisio ns are minimal (very limited),
and the scope of the review is narrow
TOPICAL REPORT REVIEW &
DOCUMENTATION Standard Compressed Uncomplicated SE Confirmation Acceptance Review NRC determines acceptability and Documents on NRC Form 898, Topical Report Completeness Determination.
60 days Documented with Form 898
< 60 days but based on schedule.
Documented with Form 898
< 60 days but based on schedule.
Documented with Form 898
< 60 days but based on schedule.
Detailed Review RAI questions or other options to get the desired information efficiently (e.g.,
audits, public meeting/conference call, requests for confirmation of information).
Determine if RAIs, audits, public meetings are needed.
No RAIs expected but can be issued if schedule supports.
No RAIs expected but can be issued if schedule supports.
Review Documentation Draft SE, Final SE, and a -A TR with verification on NRC Form 896,
-A TR Verification Review Determination.
-A TR with verification on NRC Form 896.
Draft SE, Final SE, and a -A TR with verification on NRC Form 896.
Draft and Final NRC Form 895, TR Safety Evaluation, and a -A TR with verification on NRC Form 896.
PWROG Presentation PWROG-22010-NP, Risk Assessment Process for the Review of Topical Reports (RAPTR)
Public Comment Period
Thank you.
Please send your name and affiliation to lucas.haeg@nrc.gov so we can have a complete list of attendees