Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML112970834 | 23 October 1981 | Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 | |
ML17258A795 | 10 February 1981 | Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys | |
ML17258A737 | 14 January 1981 | Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr | |
ML17250A716 | 29 October 1980 | Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl | |
ML19338F072 | 1 October 1980 | Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice | Incorporated by reference |
ML19320A583 | 16 June 1980 | Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators | |
ML17250A332 | 12 June 1980 | Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen | Safe Shutdown |
ML19323H279 | 6 June 1980 | Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections | |
ML19318C186 | 2 June 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl | |
ML19323G060 | 27 May 1980 | Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis | Emergency Lighting Fire Protection Program |
ML17249A911 | 30 April 1980 | Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient | Safe Shutdown Boric Acid Shutdown Margin |
ML20003H960 | 18 April 1980 | Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info | |
ML19323D245 | 20 March 1980 | Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin | |
ML19309G082 | 20 March 1980 | Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin | |
ML19305C372 | 20 March 1980 | Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible | |
ML19305C375 | 20 March 1980 | Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response | |
ML19305D511 | 20 March 1980 | Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue | |
ML19323C427 | 6 March 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible | |
ML19309D345 | 6 March 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later | |
ML19294B145 | 22 February 1980 | Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year | |
ML19260D562 | 5 February 1980 | Forwards Supplemental Deficiency Rept Re Qualification of Control Sys | |
ML19309B549 | 5 February 1980 | Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve | |
ML19296D996 | 1 February 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks | |
ML19308C998 | 18 January 1980 | Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design | |
ML19211D275 | 14 January 1980 | Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly | |
ML19257B887 | 4 January 1980 | Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks | |
ML19291C306 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping | |
ML19296D705 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members | |
ML19262C424 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended | |
ML19262B567 | 20 December 1979 | Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements | |
ML19262B583 | 14 December 1979 | Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision | |
ML19253C936 | 6 December 1979 | Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures | |
ML19260C948 | 29 November 1979 | Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations | |
ML19210C133 | 7 November 1979 | Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application | |
ML19254F206 | 1 November 1979 | Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. | Hydrostatic |
ML19211A424 | 1 November 1979 | Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys | |
ML19253C596 | 26 October 1979 | Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators | |
ML19253C798 | 15 October 1979 | Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months | |
ML17249A179 | 8 October 1979 | Responds to 790808 Ltr Re Adequacy of Station Electric Distribution Sys Voltages.Submits Sys Model & Acceptance Criteria for Use W/Proprietary Code PTI-PSS/E to Verify Offsite Power Capability.Final Rept Submitted in 60 Days | |
ML19268C032 | 5 October 1979 | Responds to IE Bulletin 79-03 Followup Rept.Data Developed on Generic Basis & Considered Applicable to All Snupps Units.Fabrication & Installation of Youngstown Pipe Spools Will Proceed W/All Matl Analyzed Prior to Use | |
ML19209C220 | 2 October 1979 | Forwards Snupps FSAR to Be Incorporated Into Applications for OLs | |
ML19209A516 | 28 September 1979 | Forwards First Deficiency Rept Re Qualification of Control Sys.Next Rept Will Be Submitted in Approx Three Months | |
ML19250A645 | 28 September 1979 | Notifies That Licensee Informed NRC on 790830 of Potential Deficiency Re Qualification of Control Sys Which Was Later Subj of IE Info Notice 79-22.Suppl Rept Will Be Issued in About 90 Days | |
ML19209A394 | 10 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions | |
ML19242A368 | 26 July 1979 | Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power | |
ML19249D398 | 26 July 1979 | Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated | |
ML19249A065 | 24 July 1979 | Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications | |
ML19247B296 | 5 July 1979 | Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts | |
ML19242B114 | 29 June 1979 | Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification | |
ML17244A569 | 20 June 1979 | Requests Notification of Date for Meeting W/Nrc to Discuss Computer Models Which Reflect Upper Plenum Injection of ECCS |