RBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed10 September 1990Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine ReviewedCondition Adverse to Quality
RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range30 August 1990Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument RangePost Accident Monitoring
RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment28 August 1990Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment
RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.2128 August 1990Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21
RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-90030128 August 1990Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301
RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 90092922 August 1990Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929
RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified10 August 1990Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified
RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1 August 1990Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages
RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting30 July 1990Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting
RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank26 July 1990Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank
RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-1613 July 1990Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16
RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed2 July 1990Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed
RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 199029 June 1990Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990
RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs28 June 1990Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 YrsAffidavit
RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon26 June 1990Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon
RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License26 June 1990Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to LicenseMissed surveillance
RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads26 June 1990Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads
RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 199022 June 1990Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990Ultimate heat sink
ML20043G22114 June 1990Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys
ML20043G81912 June 1990Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5High Radiation Area
Stroke time
Power Operated Valves
ML20043F9806 June 1990Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately
ML20043E6536 June 1990Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility
ML20043D5401 June 1990Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101
ML20043D5421 June 1990Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989.
ML20043D5591 June 1990Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs
ML20043D23731 May 1990Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow
ML20043C80129 May 1990Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.)
ML20043B42321 May 1990Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program.Fitness for Duty
ML20043A42714 May 1990Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts
ML20042G7039 May 1990Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators
ML20042F9747 May 1990Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized ValvesProbabilistic Risk Assessment
Fire Protection Program
Fire Watch
ML20042G2524 May 1990Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.'
ML20042E3786 April 1990Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for AcceptabilityFitness for Duty
ML20042D83530 March 1990Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power SourcesSafe Shutdown
ML20042E35030 March 1990Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug TestingFitness for Duty
ML20012F15728 March 1990Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01
ML20012F15528 March 1990Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels
ML20042D70421 March 1990Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage
ML20012E00020 March 1990Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2)
ML20012C79016 March 1990Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21)
ML20012C99315 March 1990Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting
ML20012C78815 March 1990Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock
ML20012C0389 March 1990Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201
ML20012B3001 March 1990Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26Fitness for Duty
ML20012A4431 March 1990Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits
ML17347B5881 March 1990Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits
ML18094B32228 February 1990Forwards Executed Amend 14 to Indemnity Agreement B-74
ML15217A10328 February 1990Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation ManualsOffsite Dose Calculation Manual
Process Control Program
ML20012A91628 February 1990Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading
ML20011F38226 February 1990Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices