Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 13 July 2022 | Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | Earthquake Fire Protection Program |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
RS-22-082, Defueled Safety Analysis Report Update, Revision 11 | 22 June 2022 | Defueled Safety Analysis Report Update, Revision 11 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Zebra Mussel Emergency Lighting Process Control Program Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program Backfit Siren |
RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | 20 January 2022 | Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | Anticipated operational occurrence Post Accident Monitoring Fuel cladding |
RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E | 23 August 2021 | Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E | Exemption Request |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
ML20300A235 | 17 November 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | 8 October 2020 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | Post Accident Monitoring |
RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-30 | 24 September 2020 | Renewed Facility Operating License Nos. DPR-29 and DPR-30 | Exemption Request Pandemic Coronavirus COVID-19 |
RS-20-070, Defueled Safety Analysis Report Update, Revision 10 | 22 June 2020 | Defueled Safety Analysis Report Update, Revision 10 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Zebra Mussel Emergency Lighting Process Control Program Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program Backfit Siren |
RS-19-093, Secondary Containment Drawdown Analysis | 17 October 2019 | Secondary Containment Drawdown Analysis | |
RS-19-049, Submittal of 10 CFR 50.46 Annual Report | 2 May 2019 | Submittal of 10 CFR 50.46 Annual Report | |
ML19064B370 | 5 March 2019 | Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. | Stroke time GOTHIC |
ML19064B371 | 5 March 2019 | Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. | |
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 14 August 2018 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown High winds Ultimate heat sink Mission time Time to boil Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Functionality Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Time Critical Operator Action Battery sizing B.5.b Mitigating Strategies Flood Hazard Mitigation Strategies Assessment Hardened vent Fuel cladding |
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | 14 August 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | High winds FLEX Tornado Generated Missile Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Containment Hardened Vent Battery sizing |
RS-18-077, Defueled Safety Analysis Report Update, Revision 9 | 20 June 2018 | Defueled Safety Analysis Report Update, Revision 9 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Zebra Mussel Emergency Lighting Process Control Program Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program Backfit Siren |
RS-18-003, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 12 January 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | High winds Ultimate heat sink Tornado Missile Hydrostatic FLEX Tornado Generated Missile Design basis earthquake Severe Accident Management Guideline Containment Hardened Vent |
ML16271A324 | 31 October 2016 | Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 | Fukushima Dai-Ichi |
ML15251A384 | 31 August 2015 | Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) | Anticipated operational occurrence Finite Element Analysis |
ML15215A337 | 30 July 2015 | Holtec International Report No. HI-2146153, Revision 2, Licensing Report for the Criticality Analysis of the Dresden Unit 2 and 3 SEP for Atrium 10XM Fuel Design | Fuel cladding |
RS-14-310, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality | 30 December 2014 | License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality | Earthquake Fuel cladding |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14115A269 | 30 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Fukushima Dai-Ichi Earthquake |
ML14101A228 | 7 April 2014 | Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. | Fuel cladding |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | 19 December 2013 | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | Safe Shutdown Reactor Vessel Water Level Mission time Stroke time Post Accident Monitoring Scram Discharge Volume MELLLA |
ML13220A238 | 22 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent GOTHIC |
ML13317A957 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
ML13317A829 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Dresden Nuclear Power Station Units 2 and 3, TAC Nos.: MF1046 and MF1047 | Safe Shutdown High winds Ultimate heat sink Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Containment Hardened Vent Frazil ice Earthquake |
ML13199A038 | 16 July 2013 | Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version | Fuel cladding |
ML13126A187 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 7 of 13 | |
ML13126A186 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 6 of 13 | |
ML13126A185 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 5 of 13 | |
ML13126A184 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 4 of 13 | |
ML13126A183 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 3 of 13 | Scram Discharge Volume |
ML13126A181 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 2 of 13 | Scram Discharge Volume |
ML13126A180 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 13 of 13 | Safe Shutdown Unanalyzed Condition Fukushima Dai-Ichi Scram Discharge Volume Earthquake Scaffolding |
ML13126A179 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 1 of 13 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Commercial Grade Dedication Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Arc flash Fukushima Dai-Ichi Design basis earthquake Scram Discharge Volume Frazil ice Earthquake Scaffolding Weak link Power Uprate Seismic Walkdown Report |
ML13126A188 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 8 of 13 | |
ML13126A189 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 9 of 13 | |
ML13126A190 | 28 March 2013 | Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 10 of 13 | Scaffolding |
ML12306A393 | 1 November 2012 | Request for a Written Response to NRC Observations and Concerns Regarding Dresden Station Response Plan for External Flooding Events | Fukushima Dai-Ichi |
ML12361A101 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 2 of 10 | |
ML12361A094 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15 | |
ML12361A095 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 12 of 15 | Scaffolding |
ML12361A096 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 13 of 15 | Scaffolding |
ML12361A098 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 14 of 15 | Scaffolding |
ML12361A099 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 15 of 15 | Fukushima Dai-Ichi Earthquake Scaffolding |
ML12361A100 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 1 of 10 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Arc flash Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |