Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23317A20722 December 2023Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448Shutdown Margin
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
ML23243B05719 December 2023VEGP Unit 4 Amendment Attachment
ML23243A98019 December 2023VEGP Unit 3 Amendment AttachmentFire Protection Program
ML23268A0577 November 2023Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)Probabilistic Risk Assessment
Fire Protection Program
ML23235A29624 August 2023Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances)Boric Acid
Ultimate heat sink
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit22 August 2023Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to LimitUltimate heat sink
Anticipated operational occurrence
Enforcement Discretion
Surveillance Frequency Control Program
Large early release frequency
Fuel cladding
ML23093A0281 August 2023Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test AssembliesSafe Shutdown
Shutdown Margin
Mission time
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Cyber Security
Surveillance Frequency Control Program
Severe Accident Management Guideline
Fuel cladding
Fire Protection Program
ML23159A09931 July 2023Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001)Fire Protection Program
ML23158A20919 July 2023LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment AttachmentSafe Shutdown
Squib
Fire Protection Program
NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications5 July 2023to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications
ML23115A14915 June 2023Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring MethodologyAnticipated operational occurrence
Surveillance Frequency Control Program
NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)17 May 2023License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)Boric Acid
ML23072A2751 May 2023Attachment to Enclosure 1 - VEGP U3 Amendment 191 LAR-22-005Time of Discovery
Fire Protection Program
ML22346A1489 February 2023Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10Fire Protection Program
ML23037A0908 February 2023Amend Attachment - Vogtle 3 Amend No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances)Squib
Fire Protection Program
ML23037A9216 February 2023SNC Presentation - Draft Vogtle TSTF-339 LAR - Pre-Submittal Meeting - February 13 2023Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fuel cladding
ML23018A00424 January 2023Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTFHigh Radiation Area
ML23013A21913 January 2023Amendment No. 189 - Amendment AttachmentFire Protection Program
ML22192A19919 August 2022Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingFire Protection Program
ND-22-0219, Technical Specifications Setpoint Report11 August 2022Technical Specifications Setpoint Report
ML22116A0845 July 2022Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs)Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Incorporated by reference
Tornado Missile Protection
Surveillance Frequency Control Program
Earthquake
NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value30 June 2022License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) ValueAnticipated operational occurrence
Safe Shutdown Earthquake
Abnormal operational transient
Pressure and Temperature Limits Report
ML22101A09420 May 2022Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area TemperatureReactor Vessel Water Level
Surveillance Frequency Control Program
Fire Protection Program
NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.17 May 2022Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.
ML22069A00427 April 2022Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed ValvesHigh Radiation Area
Incorporated by reference
Surveillance Frequency Control Program
Exemption Request
NL-22-0091, Correction of Technical Specification Typographical Omission24 February 2022Correction of Technical Specification Typographical OmissionSurveillance Frequency Control Program
ML21349A5182 February 2022Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS LeakageSurveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
ML21316A0555 January 20221 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163Nondestructive Examination
ML21270A08618 November 2021Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative ControlsHigh Radiation Area
Fire Protection Program
NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements29 September 2021Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements
ML21109A35922 April 2021Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances)Time of Discovery
High winds
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Containment Hardened Vent
Maintenance Rule Program
Hardened vent
Fuel cladding
Fire Protection Program
Fatality
ML20303A11911 December 2020Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 IssuesSurveillance Frequency Control Program
ML20247J46014 October 2020Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 185 (LAR-20-004)
ML20247J46314 October 2020Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 183 (LAR-20-004)
ML20303A18129 September 2020Rev. 117 to Technical Requirement Manual, Unit 1, Part 2
NL-20-1000, Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time23 August 2020Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion TimeSafe Shutdown
Internal Flooding
FLEX
Large early release frequency
Offsite Circuit
NL-20-0793, Correction of Technical Specification Typographical Error2 July 2020Correction of Technical Specification Typographical ErrorWater Inventory Control
Surveillance Frequency Control Program
ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)19 June 2020Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
ML20066F59211 June 2020Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)Hot Short
Safe Shutdown
Ultimate heat sink
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
B.5.b
Aging Management
Significance Determination Process
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Continuous fire watch
Fire Protection Program
ML20013G7123 February 2020Amendment 173 (LAR-19-016)Fire Protection Program
ML19337C32229 January 2020Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
ML19298A10425 October 2019Attachment - VEGP U4 Amendment XX5 (LAR-19-001)Fire Protection Program
NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown17 October 2019Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold ShutdownProbabilistic Risk Assessment
ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...7 October 2019Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...Stroke time
Post Accident Monitoring
Probabilistic Risk Assessment
Squib
Incorporated by reference
ML19238A34827 September 2019Attachment - Vogtle Electric Generating Plant Unit 3 (LAR-19-004)Fire Protection Program
ML19238A34927 September 2019Attachment - Vogtle Electric Generating Plant Unit 4 (LAR-19-004)Fire Protection Program
ML19212A05420 September 2019Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPRReactor Vessel Water Level
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Fire Protection Program
ML19198A1044 September 2019Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary ContainmentSurveillance Frequency Control Program
Fire Protection Program
ML19071A13816 July 2019Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471Unanalyzed Condition
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
ML19164A01721 June 2019Correction of Amendment No. 223 Multiple Technical Specification Changes (CAC Nos. MF5026 and MF5027)