ML23243A980

From kanterella
Jump to navigation Jump to search

VEGP Unit 3 Amendment Attachment
ML23243A980
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/19/2023
From:
NRC/NRR/VPOB
To:
Gleaves W
Shared Package
ML23243A956 List:
References
EPID L-2023-LLA-0002
Download: ML23243A980 (2)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 197

TO FACILITY COMBINED LICENSE NO. NPF-91

DOCKET NO.52-025

Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-91

REMOVE INSERT 7 7

Facility Combined License No. NPF-91, Appendix A

REMOVE INSERT

3.3.9-2 3.3.9-2

3.8.3-1 3.8.3-1 (7) Reporting Requirements

(a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Oper ations Center in ac cordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation

T he Technical Specifications and Environmental Protection Plan in Appendices A and B, respectively, of this license, as revised through Amendment No. 197, are hereby incorporated into this license.

(9) Technical Specifications

The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation

SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environme nt al Qualif icat ion Program impleme nted bef ore init ial fuel load;

(b) Reactor Vessel Material Surveillance Program implemented before initial criticality;

(c) Preservice Testing Program implemented before initial fuel load;

(d) Containment Leakage Rate Testing Program implemented before initial fuel load;

(e) Fire Protection Program

1. T he f ire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt

7 Amendment No. 197 Technical Specifications Inverters - Operating 3.8.3

3.8 ELECTRICAL POWER SYSTEMS

3.8.3 Inverters - Operating

LCO 3.8.3 The Division A, B, C, and D inverters shall be OPERABLE.

- NOTES -

One inverter may be disconnected from its associated DC bus for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to perform an equalizing charge on its associated battery, providing:

1. The associated instrument and control bus is energized from its Class 1E voltage regulating transformer; and
2. All other AC instrument and control buses are energized from their

associated OPERABLE inverters.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

A. One or two inverter(s) A.1 ------------------------------------

within one division - NOTE -

inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.5 Distribution Systems -

Operating with any instrument and control bus de-energized.

Restore inverter(s) to 14 days OPERABLE status.

B. Required Action B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and associated Completion Time AND not met.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

VEGP Units 3 and 4 3.8.3 - 1 Amendment No. 197 (Unit 3)

Amendment No. 193 (Unit 4)

Technical Specifications ESFAS Manual Initiation 3.3.9

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Required Action and C.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.9-1 Time of Condition A or for the channel(s).

B not met.

OR

One or more Functions with two channels inoperable.

D. As required by D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.

D.2 Be in MODE 4 with the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Reactor Coolant System (RCS) cooling provided by the Normal Residual Heat Removal System (RNS).

E. As required by E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.

E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

F. As required by F.1 Declare affected isolation Immediately Required Action C.1 valve(s) inoperable.

and referenced in Table 3.3.9-1.

G. As required by G.1 Be in MODE 5. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.

G.2 Initiate action to establish 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> RCS VENTED.

VEGP Units 3 and 4 3.3.9 - 2 Amendment No. 197 (Unit 3)

Amendment No. 193 (Unit 4)