MONTHYEARND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002) Project stage: Request ML23065A0782023-03-0303 March 2023 Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email Project stage: RAI ML23137A2172023-05-17017 May 2023 COL Docs - FW Re Revised Draft RAI for SNC Vogtle LAR-22-002, TS 3.8.3 Inverters - Operating, Completion Time Extension Project stage: Request ML23164A0422023-06-13013 June 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number C.2.6.09.06 (Index No. 666) for Vogtle Unit 4 Combined License (VOG4) Project stage: Request NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) Project stage: Response to RAI PMNS20230576, Notice of Meeting with Southern Nuclear Operating Company2023-06-28028 June 2023 Notice of Meeting with Southern Nuclear Operating Company Project stage: Request ML23188A1512023-08-0909 August 2023 Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension Project stage: RAI ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company Project stage: Meeting NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2) Project stage: Request ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time Project stage: Request ML23243B0492023-12-19019 December 2023 VEGP Units 3 and 4, Safety Evaluation, LAR-22-002, TS 3.8.3 Inverters Operating, Completion Time Extension - Enclosure 3 Project stage: Approval ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter Project stage: Approval ML23243B0572023-12-19019 December 2023 VEGP Unit 4 Amendment Attachment Project stage: Other ML23243B0542023-12-19019 December 2023 VEGP Unit 4 Amendment No. 193 - Enclosure 2 Project stage: Other ML23243A9562023-12-19019 December 2023 VEGP Units 3 and 4 LAR 22-002, Technical Specification 3.8.3, Inverters Operating, Completion Time Extension Amendments 197/193 Project stage: Request ML23243A9802023-12-19019 December 2023 VEGP Unit 3 Amendment Attachment Project stage: Other ML23243A9682023-12-19019 December 2023 VEGP Unit 3 Amendment No. 197 - Enclosure 1 Project stage: Other 2023-05-17
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23243A9802023-12-19019 December 2023 VEGP Unit 3 Amendment Attachment ML23243B0572023-12-19019 December 2023 VEGP Unit 4 Amendment Attachment ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23159A0992023-07-31031 July 2023 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001) ML23158A2092023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Attachment NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23072A2752023-05-0101 May 2023 Attachment to Enclosure 1 - VEGP U3 Amendment 191 LAR-22-005 ML23037A0902023-02-0808 February 2023 Amend Attachment - Vogtle 3 Amend No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML23037A9212023-02-0606 February 2023 SNC Presentation - Draft Vogtle TSTF-339 LAR - Pre-Submittal Meeting - February 13 2023 ML23013A2192023-01-13013 January 2023 Amendment No. 189 - Amendment Attachment ND-22-0219, Technical Specifications Setpoint Report2022-08-11011 August 2022 Technical Specifications Setpoint Report ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20247J4632020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 183 (LAR-20-004) ML20247J4602020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 185 (LAR-20-004) ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ML20013G7122020-02-0303 February 2020 Amendment 173 (LAR-19-016) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19298A1042019-10-25025 October 2019 Attachment - VEGP U4 Amendment XX5 (LAR-19-001) NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ML19238A3482019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR-19-004) ML19238A3492019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR-19-004) ML19063C6402019-04-11011 April 2019 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 158 (LAR-18-027) ML19063C6412019-04-11011 April 2019 Attachment - VEGP U4 Amendment 156 (LAR-18-027) ML19038A4572019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 4 (LAR 18-025) ML19038A4552019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 3 (LAR 18-025) ML19035A7602019-02-22022 February 2019 Attachment for Amendment 153 - LAR-18-024 ML19035A7582019-02-22022 February 2019 Attachment for Amendment 154 - LAR-18-024 ML18351A1942019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 4 LAR 18-017 ML18351A1922019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-017 ML18341A0832018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant - Unit 3 Amendment 149(LAR-18-022) ML18341A0852018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 148 (LAR-18-022) ML18296A4182018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 4 ML18296A4172018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 3 ML18263A0392018-10-29029 October 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) ML18180A0622018-08-10010 August 2018 Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization Process ML18173A3062018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 134 (LAR-18-003) ML18173A3042018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 135 (LAR-18-003) ML18082B3772018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 134(LAR-18-005) 2024-07-23
[Table view] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 197
TO FACILITY COMBINED LICENSE NO. NPF-91
DOCKET NO.52-025
Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-91
REMOVE INSERT 7 7
Facility Combined License No. NPF-91, Appendix A
REMOVE INSERT
3.3.9-2 3.3.9-2
3.8.3-1 3.8.3-1 (7) Reporting Requirements
(a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b) SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Oper ations Center in ac cordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation
T he Technical Specifications and Environmental Protection Plan in Appendices A and B, respectively, of this license, as revised through Amendment No. 197, are hereby incorporated into this license.
(9) Technical Specifications
The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation
SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a) Environme nt al Qualif icat ion Program impleme nted bef ore init ial fuel load;
(b) Reactor Vessel Material Surveillance Program implemented before initial criticality;
(c) Preservice Testing Program implemented before initial fuel load;
(d) Containment Leakage Rate Testing Program implemented before initial fuel load;
(e) Fire Protection Program
- 1. T he f ire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt
7 Amendment No. 197 Technical Specifications Inverters - Operating 3.8.3
3.8 ELECTRICAL POWER SYSTEMS
3.8.3 Inverters - Operating
LCO 3.8.3 The Division A, B, C, and D inverters shall be OPERABLE.
- NOTES -
One inverter may be disconnected from its associated DC bus for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to perform an equalizing charge on its associated battery, providing:
- 1. The associated instrument and control bus is energized from its Class 1E voltage regulating transformer; and
- 2. All other AC instrument and control buses are energized from their
associated OPERABLE inverters.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
A. One or two inverter(s) A.1 ------------------------------------
within one division - NOTE -
inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.5 Distribution Systems -
Operating with any instrument and control bus de-energized.
Restore inverter(s) to 14 days OPERABLE status.
B. Required Action B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and associated Completion Time AND not met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
VEGP Units 3 and 4 3.8.3 - 1 Amendment No. 197 (Unit 3)
Amendment No. 193 (Unit 4)
Technical Specifications ESFAS Manual Initiation 3.3.9
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
C. Required Action and C.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.9-1 Time of Condition A or for the channel(s).
B not met.
OR
One or more Functions with two channels inoperable.
D. As required by D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.
D.2 Be in MODE 4 with the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Reactor Coolant System (RCS) cooling provided by the Normal Residual Heat Removal System (RNS).
E. As required by E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.
E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
F. As required by F.1 Declare affected isolation Immediately Required Action C.1 valve(s) inoperable.
and referenced in Table 3.3.9-1.
G. As required by G.1 Be in MODE 5. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action C.1 and referenced in AND Table 3.3.9-1.
G.2 Initiate action to establish 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> RCS VENTED.
VEGP Units 3 and 4 3.3.9 - 2 Amendment No. 197 (Unit 3)
Amendment No. 193 (Unit 4)