MONTHYEARML19171A0612019-03-21021 March 2019 To Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Appendix 3H, Auxiliary and Shield Building Critical Sections Project stage: Request ND-19-1031, Request for License Amendment: Reinforcement Changes for Wall Land Wall 7.3 (LAR-19-016)2019-08-22022 August 2019 Request for License Amendment: Reinforcement Changes for Wall Land Wall 7.3 (LAR-19-016) Project stage: Request ML19233A0072019-08-22022 August 2019 NRC Contacts for New Power Reactors Project stage: Request ML19246A2742019-09-0303 September 2019 COL Docs - Acceptance Review of Southern Nuclear Operating Company’S Reinforcement Changes for Wall L and Wall 7.3 Project stage: Acceptance Review ML19248C0202019-09-0505 September 2019 Audit Plan for Vogtle Electric Generating Plant, Unit 4 - Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR 19-016) Project stage: Approval ML19247C8572019-09-0909 September 2019 Notice of No Objection for Preliminary Amendment Request for LAR-19-016 Project stage: Approval ML19280D8722019-10-11011 October 2019 Audit Report for Vogtle Electric Generating Plant Unit 4 - Request for License Amendment LAR-19-016 Project stage: Approval ND-19-1314, Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2)2019-10-25025 October 2019 Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2) Project stage: Other ND-19-1313, Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1)2019-10-25025 October 2019 Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1) Project stage: Request ML19298A0992019-10-25025 October 2019 Attachment - VEGP U3 Amendment XX5 (LAR-19-001) Project stage: Request ML19302F2002019-11-12012 November 2019 Notice of No Objection for Preliminary Amendment Request Revised (PAR-19-016-2) Project stage: Other ML19336A3762019-12-16016 December 2019 Audit Report for Vogtle Electric Generating Plant Unit 4, Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1) Project stage: Approval ML20013G7302020-02-0303 February 2020 Safety Evaluation for Vogtle Electric Generating Plant Unit 4 (LAR 19-016) Project stage: Approval ML20013G7122020-02-0303 February 2020 Amendment 173 (LAR-19-016) Project stage: Approval ML20013G6882020-02-0303 February 2020 Amendment - Vogtle Electric Generating Plant Unit 4 Project stage: Other ML20013G6612020-02-0303 February 2020 Cover Letter - Vogtle Electric Generating Plant, Unit 4 (LAR 19-016) Project stage: Approval 2019-03-21
[Table View] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 173 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Facility Combined License No. NPF-92 REMOVE INSERT 7
7
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 173, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
Fire Protection Program
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 173