Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20247K247 | 24 August 1989 | Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters | |
ML20154L166 | 10 May 1988 | Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted | |
ML20196F995 | 24 February 1988 | Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs | |
ML20012E159 | 8 February 1988 | Trip Rept of 880125-29 Site Visit to Participate in Audit of Emergency Preparedness & Public Affairs Div | |
ML20151W004 | 12 March 1987 | Submits After Trip Rept | |
ML20213F866 | 31 July 1986 | Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl | Earthquake Backfit |
IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl | 31 July 1986 | Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl | Earthquake Backfit |
ML20206J656 | 23 June 1986 | Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl | |
ML20244D839 | 7 May 1986 | Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl | |
ML20244D840 | 22 April 1986 | Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available | |
ML20154L918 | 6 March 1986 | Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented | |
ML20237C968 | 19 February 1986 | Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl | |
ML20141H855 | 10 January 1986 | Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events | |
ML20138A120 | 23 September 1985 | Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities | Boric Acid |
ML20199G318 | 15 January 1985 | Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed | |
ML20127B510 | 13 April 1984 | Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | Safe Shutdown |
IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | 13 April 1984 | Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed | Safe Shutdown |
ML20138M974 | 20 December 1983 | Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program | Coatings Backfit |
ML20205T537 | 15 February 1983 | Trip Rept of 830126 Meeting in Bethesda to Discuss Question of Corrective Actions to Be Required of Util Re Finding of Uncertified QC Inspectors at Site | |
ML20134B461 | 16 September 1982 | Trip Rept of 820830-31 Visit to Bechtel,Norwalk,Ca to Observe Region IV Insp Concerning Effectiveness of Util/ Bechtel Processing of Field Change Notices for Facility Const.Supporting Documentation Encl | |
ML18139B967 | 13 July 1982 | Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech Specs | Offsite Dose Calculation Manual Process Control Program Backfit |
ML20213D936 | 7 December 1981 | Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures | |
ML20140G253 | 28 June 1976 | Trip Rept of 760614-17 Site Visits Re Relief Valve Test Sequence.Test Results Encl | |
ML20140G259 | 15 June 1976 | Trip Rept of 760529 Site Visit Re Witness of Safety/Relief Valve Tests.List of Attendees Encl | |
ML20235C183 | 24 November 1975 | Trip Rept of 751111 Visit to Plant Site as Part of Q-1 Review Procedures Re Status of Plant Const.List of Participants Encl | |
ML20235C151 | 21 October 1975 | Trip Rept of Site Visit During Wk of 751006 Re NRC Concerns & General Overview by Util of Const Activities.Summary of Site Visit Schedule & Participating Personnel Encl | |
ML20126D813 | 1 May 1973 | Trip Rept of 730424-25 Site Visit to Obtain First Hand Knowledge of Site & Environs & to Discuss Possible Problem Areas.Attendance List Encl | |
ML20210B376 | 29 December 1972 | Trip Rept of 721218 Site Visit Re Jet Pump Assembly & Torus Ring Header Sys.Dynamic Analysis & Measured Data Not Available.Results & Findings Will Be Described in Rept Scheduled for 730302 | |
ML20210B262 | 25 October 1972 | Trip Rept of 721019 Visit to Plant to Investigate Ring Header Problem & Observe GE Blowdown Tests | Earthquake |
ML20084K275 | 27 January 1971 | Trip Rept of 710120 Visit to Plant Re Plans for Replacement of Dome Concrete & Review of Specs for Work.Concrete Removal Operation Satisfactory | |
ML20234E359 | 29 April 1964 | Trip Rept of 640318 Visit to Bodega Reactor Site Re Geology of Area. Statement on Bodega Head Power Site Shaft Fault, Encl | Earthquake |