Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G019 | 15 October 1999 | Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair | |
3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated | 13 October 1999 | Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated | |
ML17241A489 | 7 October 1999 | LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr | |
ML20217B093 | 6 October 1999 | Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue | |
ML20212L088 | 4 October 1999 | SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 | Coatings Nondestructive Examination VT-2 |
ML20212J863 | 1 October 1999 | Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) | Incorporated by reference |
3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With | |
ML17241A495 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr | |
ML20212E903 | 30 September 1999 | FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 | Emergency Lighting Loss of condenser vacuum |
ML20212E691 | 21 September 1999 | Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown Reactor Vessel Water Level |
3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With | |
ML20211L132 | 31 August 1999 | EAL Basis Document | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Internal Flooding Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20212C150 | 31 August 1999 | Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 | Boric Acid Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Control of Heavy Loads Fuel cladding |
ML17241A474 | 31 August 1999 | Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. | |
ML17241A459 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr | |
ML20211B729 | 16 August 1999 | Rev 2 to Cycle 11 Colr | Shutdown Margin |
ML20210P111 | 5 August 1999 | SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML20209F560 | 31 July 1999 | EAL Basis Document, for Jul 1999 | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Time to boil Internal Flooding Operating Basis Earthquake Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20210U534 | 31 July 1999 | Monthly Operating Rept for July 1999 for Crystal River,Unit 3 | |
ML17241A430 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr | |
ML17241A411 | 16 July 1999 | LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr | |
ML17241A404 | 6 July 1999 | LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr | Rod Drop Event |
ML17241A403 | 6 July 1999 | LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr | Shutdown Margin |
3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With | |
ML20210U541 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 | |
ML17355A368 | 30 June 1999 | Revised Update to Topical QA Rept, Dtd June 1999 | Safe Shutdown Non-Destructive Examination Fire Barrier Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality License Renewal Control of Heavy Loads Early Warning Fire Detection |
ML17241A409 | 30 June 1999 | Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr | |
ML17241A394 | 30 June 1999 | LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr | |
ML17241A355 | 4 June 1999 | LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr | |
3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With | |
ML20210U560 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 | |
ML17241A363 | 31 May 1999 | Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr | |
ML20195C627 | 28 May 1999 | Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates | |
ML20196L203 | 19 May 1999 | Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs | Loop seal Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Finite Element Analysis Large early release frequency Stress corrosion cracking Power change Flow Induced Vibration Exclusive Use Operational leakage |
ML17241A332 | 17 May 1999 | LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 | |
ML17241A327 | 6 May 1999 | LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr | Boric Acid Coatings Through Wall Leak Power change |
3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With | |
ML17241A333 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr | |
ML20210U563 | 30 April 1999 | Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 | |
ML17229B079 | 7 April 1999 | LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr | Unanalyzed Condition Boric Acid Time of Discovery Coatings |
ML17229B080 | 7 April 1999 | LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr | |
ML17229B084 | 7 April 1999 | Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. | |
ML20204D966 | 31 March 1999 | Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept | |
3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With | |
ML17229B096 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr | |
ML17229B054 | 10 March 1999 | LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr | Enforcement Discretion |
3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease | 10 March 1999 | Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease | |
ML17229B046 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr | |
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With | |
ML20203A438 | 3 February 1999 | Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown |