 Issue dateTitleTopic
ML20217G01915 October 1999Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair
3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated13 October 1999Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated
ML17241A4897 October 1999LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr
ML20217B0936 October 1999Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue
ML20212L0884 October 1999SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3Coatings
Nondestructive Examination
VT-2
ML20212J8631 October 1999Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i)Incorporated by reference
3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With30 September 1999Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With
ML17241A49530 September 1999Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr
ML20212E90330 September 1999FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999Emergency Lighting
Loss of condenser vacuum
ML20212E69121 September 1999Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50Safe Shutdown
Reactor Vessel Water Level
3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With31 August 1999Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With
ML20211L13231 August 1999EAL Basis DocumentSafe Shutdown
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Internal Flooding
Earthquake
Pressure Boundary Leakage
Unidentified leakage
ML20212C15031 August 1999Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Control of Heavy Loads
Fuel cladding
ML17241A47431 August 1999Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr.
ML17241A45931 August 1999Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr
ML20211B72916 August 1999Rev 2 to Cycle 11 ColrShutdown Margin
ML20210P1115 August 1999SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
Scaffolding
ML20209F56031 July 1999EAL Basis Document, for Jul 1999Safe Shutdown
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Internal Flooding
Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
Unidentified leakage
ML20210U53431 July 1999Monthly Operating Rept for July 1999 for Crystal River,Unit 3
ML17241A43031 July 1999Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr
ML17241A41116 July 1999LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr
ML17241A4046 July 1999LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 LtrRod Drop Event
ML17241A4036 July 1999LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 LtrShutdown Margin
3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With30 June 1999Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With
ML20210U54130 June 1999Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3
ML17355A36830 June 1999Revised Update to Topical QA Rept, Dtd June 1999Safe Shutdown
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Control of Heavy Loads
Early Warning Fire Detection
ML17241A40930 June 1999Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr
ML17241A39430 June 1999LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr
ML17241A3554 June 1999LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr
3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With31 May 1999Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With
ML20210U56031 May 1999Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3
ML17241A36331 May 1999Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr
ML20195C62728 May 1999Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates
ML20196L20319 May 1999Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through SgsLoop seal
Non-Destructive Examination
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Finite Element Analysis
Large early release frequency
Stress corrosion cracking
Power change
Flow Induced Vibration
Exclusive Use
Operational leakage
ML17241A33217 May 1999LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11
ML17241A3276 May 1999LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 LtrBoric Acid
Coatings
Through Wall Leak
Power change
3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With30 April 1999Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With
ML17241A33330 April 1999Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr
ML20210U56330 April 1999Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3
ML17229B0797 April 1999LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 LtrUnanalyzed Condition
Boric Acid
Time of Discovery
Coatings
ML17229B0807 April 1999LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr
ML17229B0847 April 1999Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines.
ML20204D96631 March 1999Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept
3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With31 March 1999Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With
ML17229B09631 March 1999Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17229B05410 March 1999LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 LtrEnforcement Discretion
3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease10 March 1999Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease
ML17229B04628 February 1999Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With28 February 1999Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With
ML20203A4383 February 1999Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50Safe Shutdown