Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17241A4897 October 1999LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr
ML17300B38130 September 1999Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr
ML17241A49530 September 1999Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr
ML17300B32731 August 1999Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3
ML17241A47431 August 1999Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr.
ML17241A45931 August 1999Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr
ML17313B07527 August 1999LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 LtrMissed surveillance
ML17241A43031 July 1999Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr
ML17313B06131 July 1999Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr
ML17313B01916 July 1999LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating ProcedureAnticipated operational occurrence
ML17241A41116 July 1999LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr
ML17241A4036 July 1999LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 LtrShutdown Margin
ML17241A4046 July 1999LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 LtrRod Drop Event
ML17355A36830 June 1999Revised Update to Topical QA Rept, Dtd June 1999Safe Shutdown
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Control of Heavy Loads
Early Warning Fire Detection
ML17241A39430 June 1999LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr
ML17300B31530 June 1999Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr
ML17241A40930 June 1999Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr
ML17313A99221 June 1999Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was InitiatedOffsite Dose Calculation Manual
ML17313A99118 June 1999Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys
ML17241A3554 June 1999LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr
ML17241A36331 May 1999Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr
ML17313A97331 May 1999Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr
ML17241A33217 May 1999LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11
ML17313A9287 May 1999LER 99-004-00:on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs
ML17241A3276 May 1999LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 LtrBoric Acid
Coatings
Through Wall Leak
Power change
ML17241A33330 April 1999Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr
ML17313A92030 April 1999Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr
ML17313A89514 April 1999LER 99-003-00:on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature CheckedUltimate heat sink
Missed surveillance
ML17313A89213 April 1999LER 98-003-01:on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc
ML17313A8899 April 1999LER 99-001-00:on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with 990409 LtrShutdown Margin
ML17229B0797 April 1999LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 LtrUnanalyzed Condition
Boric Acid
Time of Discovery
Coatings
ML17229B0807 April 1999LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr
ML17229B0847 April 1999Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines.
ML17313A88031 March 1999Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr
ML17229B09631 March 1999Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17300B30731 March 1999Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee.Safe Shutdown
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML17229B05410 March 1999LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 LtrEnforcement Discretion
ML20207H74710 March 19991999 Emergency Preparedness Exercise 99-E-AEV-03003High Radiation Area
Ultimate heat sink
Grab sample
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Deep Dose Equivalent
Chernobyl
Downpower
Siren
ML17313A8361 March 1999LER 99-001-00:on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With 990302 LtrShutdown Margin
ML17229B04628 February 1999Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr
ML17313A85028 February 1999Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr
ML17313A7795 February 1999Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies
ML17229B00531 January 1999Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr
ML17313A80631 January 1999Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr
ML17229A99020 January 1999LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr
ML17313A77015 January 1999LER 96-008-00:on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised
ML17229A99614 January 1999SG Tube Inservice Insp Special Rept.
ML17229A9824 January 1999LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 LtrShutdown Margin
ML17313A73831 December 1998Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr