Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18066A690 | 1 November 1999 | Rev 5 to Palisades Nuclear Plant Colr. | Shutdown Margin |
ML17241A489 | 7 October 1999 | LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr | |
ML17241A495 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr | |
ML18066A676 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant | |
ML18066A627 | 2 September 1999 | LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr | |
ML17241A474 | 31 August 1999 | Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. | |
ML17241A459 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr | |
ML18066A635 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant | |
ML18066A677 | 31 August 1999 | Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant | |
ML18066A622 | 20 August 1999 | LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr | |
ML18066A606 | 31 July 1999 | Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr | |
ML17241A430 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr | |
ML17241A411 | 16 July 1999 | LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr | |
ML17241A404 | 6 July 1999 | LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr | Rod Drop Event |
ML17241A403 | 6 July 1999 | LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr | Shutdown Margin |
ML17355A368 | 30 June 1999 | Revised Update to Topical QA Rept, Dtd June 1999 | Safe Shutdown Non-Destructive Examination Fire Barrier Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality License Renewal Control of Heavy Loads Early Warning Fire Detection |
ML18066A520 | 30 June 1999 | Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr | |
ML17241A409 | 30 June 1999 | Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr | |
ML17241A394 | 30 June 1999 | LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr | |
ML17241A355 | 4 June 1999 | LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr | |
ML18066A484 | 31 May 1999 | Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr | |
ML17241A363 | 31 May 1999 | Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr | |
ML17241A332 | 17 May 1999 | LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 | |
ML17241A327 | 6 May 1999 | LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr | Boric Acid Coatings Through Wall Leak Power change |
ML18068A594 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr | |
ML17241A333 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr | |
ML18066A637 | 30 April 1999 | Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant | |
ML17229B084 | 7 April 1999 | Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. | |
ML17229B080 | 7 April 1999 | LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr | |
ML17229B079 | 7 April 1999 | LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr | Unanalyzed Condition Boric Acid Time of Discovery Coatings |
ML18066A416 | 1 April 1999 | Rev 4 to COLR, for Palisades Nuclear Plant | Shutdown Margin |
ML18066A450 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr | |
ML18066A467 | 31 March 1999 | Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. | Safe Shutdown Earthquake Finite Element Analysis |
ML17229B096 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr | |
ML17229B054 | 10 March 1999 | LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr | Enforcement Discretion |
ML18068A535 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr | |
ML17229B046 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr | |
ML18066A393 | 31 January 1999 | Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr | |
ML17229B005 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr | |
ML18066A378 | 20 January 1999 | LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr | |
ML17229A990 | 20 January 1999 | LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr | |
ML17229A996 | 14 January 1999 | SG Tube Inservice Insp Special Rept. | |
ML17229A982 | 4 January 1999 | LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr | Shutdown Margin |
ML18066A365 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr | |
ML20206F613 | 31 December 1998 | 1998 Consumers Energy Co Annual Rept. with | |
ML17229A983 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr | Power change |
ML17229A961 | 22 December 1998 | LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr | |
ML17229A956 | 15 December 1998 | LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr | Missed surveillance |
ML17241A358 | 9 December 1998 | Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. | Hot Short Safe Shutdown Boric Acid Packing leak Ultimate heat sink Grab sample Fire Barrier Tornado Missile Hydrostatic Liquid penetrant Through-Wall Leak Grace period |
ML17229A942 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr |