Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K445 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20217K470 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for TMI-1.With | |
ML20211P673 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20211H511 | 31 August 1999 | Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis | |
ML20211Q355 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With | |
ML20210R479 | 13 August 1999 | Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 | Decommissioning Funding Plan Fire Protection Program |
ML20211A705 | 31 July 1999 | Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With | |
ML20210U479 | 31 July 1999 | Monthly Operating Rept for July 1999 for TMI-1.With | |
ML20209G001 | 9 July 1999 | Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 | Hot Short High winds Fire Barrier Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20210K765 | 9 July 1999 | Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca | |
ML20209H825 | 1 July 1999 | Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station | |
ML20209H142 | 30 June 1999 | Monthly Operating Rept for June 1999 for TMI-1.With | |
ML20209G063 | 30 June 1999 | Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20212H549 | 18 June 1999 | Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium |
ML20195H075 | 8 June 1999 | Drill 9904, 1999 Biennial Exercise for Three Mile Island | |
ML20209G035 | 31 May 1999 | TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) | High winds Tornado Generated Missile |
ML20195H926 | 31 May 1999 | Monthly Operating Rept for May 1999 for TMI-1.With | |
ML20195E796 | 31 May 1999 | Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20207B662 | 27 May 1999 | SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 | Stroke time Probabilistic Risk Assessment |
ML20206R057 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With | |
ML20206N743 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20206D420 | 20 April 1999 | Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 | Safe Shutdown High Radiation Area Fire Barrier Functionality Assessment Exemption Request Fire Protection Program |
ML20205K685 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With | |
ML20205P540 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20209G007 | 31 March 1999 | Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) | Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Seismically rugged Earthquake Weak link |
ML20210C016 | 1 March 1999 | Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246 | |
ML20207M846 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for TMI-1.With | |
ML20204C820 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20196K356 | 22 January 1999 | Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits | Fire Barrier |
ML20207A929 | 31 December 1998 | 1998 Annual Rept for TMI-1 & TMI-2 | |
ML20199E467 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20196G466 | 31 December 1998 | British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer Encl | Environment Report |
ML20195E832 | 31 December 1998 | 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With | Safe Shutdown Shutdown Margin Non-Destructive Examination Grab sample Fire Barrier Stroke time Temporary Modification Flow Induced Vibration |
ML20196F686 | 2 December 1998 | Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection | VT-2 Incorporated by reference |
ML20198B864 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for TMI-1.With | |
ML20198D209 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20195J859 | 12 November 1998 | Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan | |
ML20195C692 | 12 November 1998 | Safety Evaluation Supporting Amend 52 to License DPR-73 | |
ML20195C427 | 6 November 1998 | Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle | Safe Shutdown Earthquake |
ML20155J302 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20196B719 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for TMI-1.With | |
ML20203G121 | 30 October 1998 | Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt | |
ML20154R498 | 20 October 1998 | Core Spray Sys Insp Program - 17R | EVT-1 |
ML20155E751 | 15 October 1998 | Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing | |
ML20154L305 | 14 October 1998 | Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage | |
ML20154L554 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for TMI Unit 1.With | |
ML20154L557 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20154Q337 | 30 September 1998 | Rev 8 to Oyster Creek Cycle 17,COLR | |
ML20153A994 | 16 September 1998 | Safety Evaluation Denying Request to Remove Missile Shields from Plant Design | |
ML20151U882 | 8 September 1998 | SER on Revised Emergency Action Levels for Gpu Nuclear,Inc, Three Mile Island Nuclear Plant Units 1 & 2 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Earthquake Turbine Missile Pressure Boundary Leakage Pressure boundary leak |