Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K44530 September 1999Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With
ML20217K47030 September 1999Monthly Operating Rept for Sept 1999 for TMI-1.With
ML20211P67331 August 1999Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With
ML20211H51131 August 1999Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20211Q35531 August 1999Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With
ML20210R47913 August 1999Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2Decommissioning Funding Plan
Fire Protection Program
ML20211A70531 July 1999Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With
ML20210U47931 July 1999Monthly Operating Rept for July 1999 for TMI-1.With
ML20209G0019 July 1999Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1Hot Short
High winds
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20210K7659 July 1999Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca
ML20209H8251 July 1999Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station
ML20209H14230 June 1999Monthly Operating Rept for June 1999 for TMI-1.With
ML20209G06330 June 1999Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With
ML20212H54918 June 1999Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel PoolSafe Shutdown
High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Depleted uranium
ML20195H0758 June 1999Drill 9904, 1999 Biennial Exercise for Three Mile Island
ML20209G03531 May 1999TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo)High winds
Tornado Generated Missile
ML20195H92631 May 1999Monthly Operating Rept for May 1999 for TMI-1.With
ML20195E79631 May 1999Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With
ML20207B66227 May 1999SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05Stroke time
Probabilistic Risk Assessment
ML20206R05730 April 1999Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With
ML20206N74330 April 1999Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With
ML20206D42020 April 1999Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2Safe Shutdown
High Radiation Area
Fire Barrier
Functionality Assessment
Exemption Request
Fire Protection Program
ML20205K68531 March 1999Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With
ML20205P54031 March 1999Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With
ML20209G00731 March 1999Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion)Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Seismically rugged
Earthquake
Weak link
ML20210C0161 March 1999Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246
ML20207M84628 February 1999Monthly Operating Rept for Feb 1999 for TMI-1.With
ML20204C82028 February 1999Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With
ML20196K35622 January 1999Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity LimitsFire Barrier
ML20207A92931 December 19981998 Annual Rept for TMI-1 & TMI-2
ML20199E46731 December 1998Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With
ML20196G46631 December 1998British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer EnclEnvironment Report
ML20195E83231 December 199810CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.WithSafe Shutdown
Shutdown Margin
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Temporary Modification
Flow Induced Vibration
ML20196F6862 December 1998Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted ConnectionVT-2
Incorporated by reference
ML20198B86430 November 1998Monthly Operating Rept for Nov 1998 for TMI-1.With
ML20198D20930 November 1998Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With
ML20195J85912 November 1998Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan
ML20195C69212 November 1998Safety Evaluation Supporting Amend 52 to License DPR-73
ML20195C4276 November 1998Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating CycleSafe Shutdown Earthquake
ML20155J30231 October 1998Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With
ML20196B71931 October 1998Monthly Operating Rept for Oct 1998 for TMI-1.With
ML20203G12130 October 1998Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt
ML20154R49820 October 1998Core Spray Sys Insp Program - 17REVT-1
ML20155E75115 October 1998Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing
ML20154L30514 October 1998Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage
ML20154L55430 September 1998Monthly Operating Rept for Sept 1998 for TMI Unit 1.With
ML20154L55730 September 1998Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With
ML20154Q33730 September 1998Rev 8 to Oyster Creek Cycle 17,COLR
ML20153A99416 September 1998Safety Evaluation Denying Request to Remove Missile Shields from Plant Design
ML20151U8828 September 1998SER on Revised Emergency Action Levels for Gpu Nuclear,Inc, Three Mile Island Nuclear Plant Units 1 & 2Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Earthquake
Turbine Missile
Pressure Boundary Leakage
Pressure boundary leak