Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23055A271 | 2 March 2023 | March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides | Safe Shutdown High winds Ultimate heat sink Tornado Missile Probabilistic Risk Assessment FLEX Large early release frequency |
NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | 21 February 2023 | Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | |
ML22053A291 | 22 February 2022 | NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities | Incorporated by reference Exemption Request |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21194A182 | 13 July 2021 | and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides | Coronavirus |
ML21162A332 | 11 June 2021 | BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs | |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20238B857 | 25 August 2020 | Quad 2019 Hq Online EOC Slides | Coronavirus |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML16314E481 | 14 November 2016 | Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 | |
ML16189A433 | 12 July 2016 | July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan | Offsite Dose Calculation Manual FLEX Exemption Request |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
RS-14-238, Transmittal of Proprietary Meeting Slides | 25 August 2014 | Transmittal of Proprietary Meeting Slides | |
ML14167A412 | 17 June 2014 | NRC Slides for Quad Cities 2013 EOC Public Meeting | Open House |
ML14232A785 | 19 May 2014 | Fuel Transition License Amendment Request Pre-Submittal Update Meeting | |
ML12164A596 | 12 June 2012 | Annual Assessment Meeting Slides | Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Hardened vent |
ML120870140 | 27 March 2012 | Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR | |
ML120590646 | 5 March 2012 | February 9, 2012 - Summary of Meeting with Exelon Nuclear Regarding Future Submittal of Amendment to Use Netco Spent Fuel Pool Inserts | |
ML120330124 | 9 February 2012 | Handout for Public Meeting on February 9, 2012 (Slides) | |
ML11201A213 | 20 July 2011 | Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff | |
ML110960287 | 5 April 2011 | Quad Cities Nuclear Power Station 2010 End-of-Cycle Assessment Presentation (Short) | |
ML110960278 | 5 April 2011 | Quad Cities Nuclear Power Station 2010 End-of-Cycle Annual Assessment Meeting Presentation (Long) | |
ML101680082 | 15 June 2010 | Annual Assessment Meeting, Reactor Oversight Program - 2009, Slides | |
ML092940052 | 22 October 2009 | Meeting Power Uprate Meeting Slides | MELLLA |
ML091180214 | 7 April 2009 | NRC End-of-Cycle Meeting Slides | |
ML091180225 | 7 April 2009 | NRC - Quad Cities Annual Assessment Meeting Slides | |
ML081200784 | 2 June 2008 | Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. | |
ML081440506 | 22 May 2008 | EOC Summary Meeting Slides | |
ML081150416 | 22 April 2008 | Pandemic Planning Utility Interface with NRC Slide Presentation | Pandemic |
ML071170474 | 18 April 2007 | EOC Meeting Slides | |
ML070820012 | 22 March 2007 | Extended Power Uprate (EPU) Meeting, Handouts from March 22, 2007, Meeting | |
ML071660102 | 20 March 2007 | Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction | Ultimate heat sink Enforcement Discretion |
ML070510139 | 16 February 2007 | 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 | B.5.b Mitigating Strategies |
ML061670325 | 14 June 2006 | Public Meeting Licensee Presentation Slides for Quad Cities End-of-Cycle Plant Performance Annual Assessment | High Radiation Area Flow Induced Vibration |
ML061510601 | 23 May 2006 | EPRI HRA Users Group Review of Draft NUREG-1842 | |
ML061080570 | 10 April 2006 | Quad Cities Unit 2 Dryer Inspection Results | |
ML060820120 | 16 March 2006 | Exelon Slides from Public Meeting | Non-Destructive Examination Foreign Material Exclusion |
ML061780283 | 7 March 2006 | RIC 2006 Presentation - T2F - J. Bradley Fewell - Allegations | |
ML061590148 | 7 March 2006 | RIC 2006 Presentation - T1E - Pamela B. Cowan - Licensing Issues | Surveillance Frequency Control Program |
ML060460399 | 8 November 2005 | Part 3 of the Meeting Slides, Quad Cities Replacement Steam Dryer Meeting on November 8 - 9, 2005 |