Quad Cities Nuclear Power Station 2010 End-of-Cycle Assessment Presentation (Short)ML110960287 |
Person / Time |
---|
Site: |
Quad Cities |
---|
Issue date: |
04/05/2011 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML110960287 (12) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14167A4122014-06-17017 June 2014 NRC Slides for Quad Cities 2013 EOC Public Meeting ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML12164A5962012-06-12012 June 2012 Annual Assessment Meeting Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1203301242012-02-0909 February 2012 Handout for Public Meeting on February 9, 2012 (Slides) ML1109602872011-04-0505 April 2011 Quad Cities Nuclear Power Station 2010 End-of-Cycle Assessment Presentation (Short) ML1016800822010-06-15015 June 2010 Annual Assessment Meeting, Reactor Oversight Program - 2009, Slides ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0911802142009-04-0707 April 2009 NRC End-of-Cycle Meeting Slides ML0911802252009-04-0707 April 2009 NRC - Quad Cities Annual Assessment Meeting Slides ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0814405062008-05-22022 May 2008 EOC Summary Meeting Slides ML0711704742007-04-18018 April 2007 EOC Meeting Slides ML0708200122007-03-22022 March 2007 Extended Power Uprate (EPU) Meeting, Handouts from March 22, 2007, Meeting ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0519303152005-06-30030 June 2005 June 30, 2005, Closed Meeting Handouts ML0513701772005-05-12012 May 2005 Attachment 3 - Licensee Presentation (Ginna, Perry, Peach Bottom, LaSalle, and Quad Cities) - Public Meeting Summary on FAQ Appeal Meeting May 12, 2005 ML0512903262005-05-0404 May 2005 Presentation Slides for Meeting Quad Cities Steam Dryer Replacement ML0510800392005-04-11011 April 2005 04/11-13/2005 Meeting Presentation for Steam Dryer Design Technical Meeting ML0430002872004-10-19019 October 2004 Presentation from 10/19/2004 Meeting with Exelon Nuclear, Quad Cities Unit 1 Steam Dryer Instrumentation and Refined Acoustic Model ML0427302602004-09-23023 September 2004 Meeting Presentation, Extended Power Uprate (EPU) Vibration Assessment and Vulnerability Review 2024-09-24
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML24051A0472023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-4-6.3-34, Redacted (1) ML24051A0462023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-35-6.4-1, Redacted (2) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22053A2912022-02-22022 February 2022 NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16314E4812016-11-14014 November 2016 Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016 ML16189A4332016-07-12012 July 2016 July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal Plan ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14167A4122014-06-17017 June 2014 NRC Slides for Quad Cities 2013 EOC Public Meeting ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML12164A5962012-06-12012 June 2012 Annual Assessment Meeting Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1205906462012-03-0505 March 2012 February 9, 2012 - Summary of Meeting with Exelon Nuclear Regarding Future Submittal of Amendment to Use Netco Spent Fuel Pool Inserts ML1203301242012-02-0909 February 2012 Handout for Public Meeting on February 9, 2012 (Slides) ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1109602782011-04-0505 April 2011 Quad Cities Nuclear Power Station 2010 End-of-Cycle Annual Assessment Meeting Presentation (Long) ML1109602872011-04-0505 April 2011 Quad Cities Nuclear Power Station 2010 End-of-Cycle Assessment Presentation (Short) ML1016800822010-06-15015 June 2010 Annual Assessment Meeting, Reactor Oversight Program - 2009, Slides ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0911802142009-04-0707 April 2009 NRC End-of-Cycle Meeting Slides ML0911802252009-04-0707 April 2009 NRC - Quad Cities Annual Assessment Meeting Slides ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0814405062008-05-22022 May 2008 EOC Summary Meeting Slides ML0811504162008-04-22022 April 2008 Pandemic Planning Utility Interface with NRC Slide Presentation ML0711704742007-04-18018 April 2007 EOC Meeting Slides ML0708200122007-03-22022 March 2007 Extended Power Uprate (EPU) Meeting, Handouts from March 22, 2007, Meeting ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0616703252006-06-14014 June 2006 Public Meeting Licensee Presentation Slides for Quad Cities End-of-Cycle Plant Performance Annual Assessment 2024-09-24
[Table view] |
Text
Quad Cities Nuclear Power Station Annual Assessment Meeting 2010 Reactor Oversight Process Nuclear Regulatory Commission - Region III
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment SSecurity it - Ensure E adequate d t protection t ti iin th the secure use and management of radioactive materials
NRC Annual Assessment Summary Quad Cities Exelon Generating Company operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
p Quad Cities was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2010.
NRC Inspection Activities Quad Cities for 2010 2089.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of direct inspection Two (2) resident inspectors on site - residents perform on-site inspection activities daily and make q quarterlyy reports p each yyear Eight (8) regional inspections Three (3) major team inspections Biennial Problem Identification and Resolution Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications Biennial Emergency Preparedness Exercise Evaluation
Quad Cities PIs and Findings January 1 through December 31, 2010 All Green Performance Indicators Seven (7) Green / Severity Level IV inspection findings No White inspection findings
NRC Inspection Findings Quad Cities Green - Quad Cities failed to assess and manage maintenance risks resulting in a manual reactor scram on Unit 2.
Green - Quad Cities Unit 2 operators changed operating modes when all required equipment was not operable, specifically an instrument that provides a scram signal on low condenser vacuum.
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue
National Summary of Plant Performance Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9 Degraded Cornerstone 6 Multiple/Repetitive Deg. Cornerstone 0 Unacceptable 0 Total 104
National Summary Performance Indicator Results for 2010*
- Green 7009
- White 23
- Yellow 0
- Red 0
- PIs are counted per plant per quarter Total Inspection Findings in 2010
- Green 816
- White 9
- Yellow 2
- Red 0 Finding data current as of 3/3/2011
NRC Plans for 2011 NRC plans baseline inspections at Quad Cities for the remainder of 2011. This includes:
Initial Operator Licensing Examination Component Design Bases In addition, the NRC plans to perform a Post-Approval Site Inspection for License Renewal
What Do You Think of the ROP???
The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!
Email ROPsurvey@nrc.gov to be notified when the ROP surveyy is available.
For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-evaluations.html#section3
End of Presentation Nuclear Regulatory Commission Region III Lisle, IL April 5, 2011