Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23341A152 | 7 December 2023 | December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides | Large early release frequency Exemption Request |
ML23114A067 | 26 April 2023 | April 26 2023 Public Meeting - RIPE LAR - Licensee Slides | Hot Short High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML23087A292 | 12 April 2023 | 2022 Annual Assessment Meeting | Boric Acid Significance Determination Process |
ML22301A166 | 29 September 2022 | Presentation 4 - Recent Biennial PI&R Team Inspection Insights | Condition Adverse to Quality |
ML22257A239 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22153A384 | 6 June 2022 | Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout | Coatings |
ML22151A265 | 31 May 2022 | Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR | Surveillance Frequency Control Program |
ML22109A212 | 20 April 2022 | Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
ML22091A133 | 1 April 2022 | Bru Har Combined 2021 Assessment Meeting Slides | Condition Adverse to Quality Coronavirus |
ML22083A107 | 30 March 2022 | Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) | Offsite Circuit |
ML22007A259 | 2 February 2022 | Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR | Fuel cladding |
ML21322A326 | 29 November 2021 | Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request | |
ML21174A321 | 24 June 2021 | Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 | Foreign Material Exclusion |
ML21167A085 | 24 June 2021 | Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 | Foreign Material Exclusion |
ML21105A752 | 15 April 2021 | 2020 Robinson - EOC Presentation Slides | Coronavirus |
ML21053A047 | 25 February 2021 | Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request | Coatings Moisture barrier |
ML20132A000 | 11 May 2020 | EOC Presentation | Coronavirus Fire Protection Program |
ML20100G634 | 9 April 2020 | Revised- Bru 2019 Annual Assessment Meeting Slides | COVID-19 |
ML20099D128 | 8 April 2020 | Bru 2019 Mtg Slides | COVID-19 |
ML20099C999 | 8 April 2020 | Har 2019 Mtg Slides | Condition Adverse to Quality COVID-19 |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19233A046 | 21 August 2019 | Presentation: Harris/Nrc Pre-submittal Meeting: Risk-Informed Completion Times, August 22, 2019 | High winds Internal Flooding Probabilistic Risk Assessment |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML19123A352 | 2 May 2019 | Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 | |
ML18351A134 | 20 December 2018 | December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR | Probabilistic Risk Assessment Fire impairment Maintenance Rule Program |
ML18333A182 | 8 November 2018 | Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision | Siren |
ML17331A627 | 29 November 2017 | Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 | High winds |
ML17318A159 | 8 November 2017 | Meeting Slides - November 8, 2017 Teleconference with NEI Concerning Feedback on Tornado Missile Risk Evaluator Methodology -Final | Tornado Missile Risk Evaluator |
ML17244A227 | 7 September 2017 | Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting | Qualified Offsite Circuit Offsite Circuit |
ML17200C780 | 19 July 2017 | Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 | |
ML16267A029 | 29 September 2016 | SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant | |
ML16112A293 | 2 May 2016 | 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) | |
ML16105A334 | 20 April 2016 | H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) | |
ML15231A606 | 19 August 2015 | Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 | Power change |
ML15099A587 | 14 April 2015 | Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson | Hot Short Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Large early release frequency Fire Protection Program |
ML14181A078 | 30 June 2014 | June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS | Earthquake |
ML14154A093 | 3 June 2014 | May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant | |
ML14129A335 | 9 May 2014 | Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13238A054 | 23 August 2013 | Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 | Job Performance Measure Preliminary White Finding |
ML13212A337 | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
ML13211A378 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | |
NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | |
ML13204A256 | 9 July 2013 | Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 | |
ML13170A335 | 13 June 2013 | Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel | Nondestructive Examination |
ML13150A074 | 29 May 2013 | Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant | |
ML13127A080 | 18 April 2013 | Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Emergency Lighting Large early release frequency Hemyc Fire Protection Program |