Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24222A6779 August 2024Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License ConditionSafe Shutdown
High winds
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations24 July 2024Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations
ML24165A15113 June 2024Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-InformeLarge early release frequency
2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C24 April 2024Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended CInternal Flooding
Probabilistic Risk Assessment
FLEX
Grace period
ML24101A38810 April 2024Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 “Risk-Informed Categorization and Treatment for Repair
ML24085A23625 March 2024Response to Request for Additional InformationGNF3
JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance29 February 2024Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower ToleranceAnticipated operational occurrence
Operator Manual Action
Abnormal operational transient
Subsequent actuation
JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis28 February 2024Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisOperator Manual Action
Time Critical Operator Action
Recently irradiated fuel
Manual Operator Action
ML24012A19612 January 2024Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and
2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 411 January 2024Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Safe Shutdown
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Maintenance Rule Program
Offsite Circuit
Loss of condenser vacuum
1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)14 December 2023Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)Probabilistic Risk Assessment
Power change
Exclusive Use
Affidavit
GNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)11 October 20232013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)Aging Management
License Renewal
1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 421 September 2023Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Safe Shutdown
Boric Acid
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Tornado Missile Protection
Surveillance Frequency Control Program
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Offsite Circuit
ML23192A10011 July 2023Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level SchemeExemption Request
ML23159A2308 June 2023Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)Stress corrosion cracking
License Renewal
Subsequent License Renewal
EVT-1
Affidavit
ML23103A27325 April 2023Enclosuresponses to Q&AAging Management
Annual Radiological Environmental Operating Report
Coronavirus
ML23111A21321 April 2023Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement ActivitiesIncorporated by reference
2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 4629 March 2023Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46Hydrostatic
Finite Element Analysis
Dissimilar Metal Weld
PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report1 March 2023Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities ReportLicense Renewal
1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-03530 January 2023Responses to Request for Additional Information for Request for Relief ANO1-ISI-035Nondestructive Examination
Liquid penetrant
Flow Induced Vibration
PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme8 November 2022Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level SchemeExemption Request
ML22308A2574 November 2022Decommissioning International - Response to Request for Additional Information for the Proposed Amended IP2 Master Trust AgreementIncorporated by reference
W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-50513 October 2022Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505Safe Shutdown
W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-50519 August 2022Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Safeguards Contingency Plan
License Renewal
2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods20 July 2022Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third PeriodsBoric Acid
JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..16 June 2022Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..Safe Shutdown
High winds
Probabilistic Risk Assessment
Reserve Station Service Transformer
Open Phase Condition
Large early release frequency
Offsite Circuit
Thermography
1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2 June 2022Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose CalculationsAffidavit
0CAN052203, Response to the Second Round of Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors18 May 2022Response to the Second Round of Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsInternal Flooding
Probabilistic Risk Assessment
FLEX
W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.16 May 2022Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
High Energy Line Break
Tornado Generated Missile
Tornado Missile Protection
Thermoset
Surveillance Frequency Control Program
Large early release frequency
Turbine Missile
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
Overspeed trip
ML22132A16912 May 2022Response to Requests for Additional Information Related to Exemption Request and License Amendment Request to Revise the Facility'S Emergency PlanExemption Request
W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors25 April 2022Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power ReactorsHot Short
Safe Shutdown
Ultimate heat sink
Mission time
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Thermoset
Surveillance Frequency Control Program
Large early release frequency
Safeguards Contingency Plan
License Renewal
Fire Protection Program
Fire Watch
Seismic Walkdown Report
PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition21 April 2022Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition
0CAN032201, Response to the Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors9 March 2022Response to the Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated23 February 2022Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PSurveillance Frequency Control Program
0CAN022201, Response to the Second Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping17 February 2022Response to the Second Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply PipingUltimate heat sink
Missed surveillance
Surveillance Frequency Control Program
ML22034A6033 February 2022Response to Request for Additional Information - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E for Low-level Radioactive Waste Shipments
ML22034A7883 February 2022Response to Requests for Additional Information - Related to Post Shutdown Decommissioning Activities ReportAnnual Radioactive Effluent Release Report
License Renewal
Environmental Justice
NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2 February 2022Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
VT-2
Foreign Material Exclusion
Stress corrosion cracking
Through-Wall Leakage
JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary14 January 2022Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and PrimaryReactor Vessel Water Level
ML22003A1933 January 2022Response to Requests for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting DeviceIncorporated by reference
2CAN112104, Response to Request for Additional Information 2 Related to License Amendment Request to Adopt a Safety Function Determination Program (SFDP)12 November 2021Response to Request for Additional Information 2 Related to License Amendment Request to Adopt a Safety Function Determination Program (SFDP)Surveillance Frequency Control Program
Recently irradiated fuel
2CAN112105, Response to Request for Additional Information Concerning Relief Request ANO2-RR-21-002 Support the Repair of the Reactor Vessel Closure Head Penetration 467 November 2021Response to Request for Additional Information Concerning Relief Request ANO2-RR-21-002 Support the Repair of the Reactor Vessel Closure Head Penetration 46
2CAN102103, Response to Request for Additional Information Concerning Relief Request ANO2-R&R-012 Support the Repair of the Reactor Vessel Closure Head Penetration 4612 October 2021Response to Request for Additional Information Concerning Relief Request ANO2-R&R-012 Support the Repair of the Reactor Vessel Closure Head Penetration 46Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leak
0CAN102101, Final Request for Additional Information Concerning Generic Letter 2004-024 October 2021Final Request for Additional Information Concerning Generic Letter 2004-02
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt1 October 2021Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to AdoptSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Tornado Missile Protection
Large early release frequency
TORMIS
Earthquake
Generic Issues Program
Seismic Walkdown Report
Failure to Scram
W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual30 September 2021Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual
0CAN092102, Response to Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping23 September 2021Response to Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply PipingHigh winds
Ultimate heat sink
Mission time
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
FLEX
Missed surveillance
Tornado Missile Protection
Surveillance Frequency Control Program
Manual Operator Action
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments16 September 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping14 September 2021Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply PipingAffidavit
L-21-098, Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan7 September 2021Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency PlanTime of Discovery
Emergency Lighting
Safeguards Contingency Plan
Earthquake
Fire Protection Program
Grace period