ML24169A406 | 20 May 2024 | Draft Traveler TSTF-604, Revise Ventilation System Actions | Safe Shutdown Probabilistic Risk Assessment Surveillance Frequency Control Program Recently irradiated fuel Affidavit |
ML24067A163 | 7 March 2024 | NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk | Large early release frequency |
ML22258A177 | 15 September 2022 | Comments on Draft of Revision 2 of Traveler TSTF-576, Revise Safety/Relief Valve Requirements | Pressure and Temperature Limits Report Foreign Material Exclusion |
ML22075A172 | 31 March 2022 | NRC Staff High Level Comments Rev 1 of Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time | |
TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program | 22 March 2022 | Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program | Post Accident Monitoring Probabilistic Risk Assessment Pressure and Temperature Limits Report Affidavit |
ML22045A474 | 3 February 2022 | NRC Comments on Draft TSTF-585, Rev 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time | Safe Shutdown Unanalyzed Condition Probabilistic Risk Assessment Power change |
ML21155A160 | 4 June 2021 | Draft Industry Position Surveillance Requirements (Srs) That Reference the Inservice Testing (IST) Program and 10 CFR 50.69 Categorization | Missed surveillance |
ML21155A103 | 26 April 2021 | Draft TSTF-588, Remove List of COLR Methods | Shutdown Margin Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Turbine Missile Backfit Affidavit |
ML20324A076 | 19 November 2020 | Active Traveler Summary Report for 11/19/2020 Quarterly Meeting | |
ML20324A070 | 19 November 2020 | Post TSTF-505 RICT Adoption from 11/19/2020 Quarterly Meeting | High winds |
TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections | 8 June 2020 | Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report Stress corrosion cracking Affidavit Operational leakage |
ML20113E848 | 22 April 2020 | Draft of Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, for May 2020 Presubmittal Meeting | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report Stress corrosion cracking Affidavit Operational leakage |
TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements | 13 December 2019 | Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements | Anticipated operational occurrence Surveillance Frequency Control Program |
ML19323C902 | 19 November 2019 | Revised Draft Traveler TSTF-576, Revise Safety/Relief Valve Requirements | Anticipated operational occurrence Surveillance Frequency Control Program |
TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 28 August 2019 | Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Anticipated operational occurrence Water Inventory Control Surveillance Frequency Control Program Operability Determination Operability Assessment Affidavit |
ML18204A024 | 15 August 2019 | NRC Staff Feedback Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2. | |
TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 June 2019 | Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Operability Determination Operability Assessment Affidavit |
ML19056A425 | 21 February 2019 | NRC Staff Feedback to TSTF Proposed Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed. | Affidavit |
ML19058A023 | 21 February 2019 | Active Traveler Summary Report for 2.21.2019 Meeting | |
TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | 12 October 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18221A561 | 9 August 2018 | TSTF Input to Lifting the Suspension of Acceptance of Amendment Requests to Adopt TSTF-51, TSTF-471, and TSTF-286 | Unanalyzed Condition Shutdown Margin Control of Heavy Loads Recently irradiated fuel Affidavit |
TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | 16 April 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | Surveillance Frequency Control Program Operability Determination Operational leakage |
TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. | 8 February 2018 | Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Pressure Boundary Leakage Unidentified leakage Affidavit |
ML17297B782 | 24 October 2017 | Email Attachment for TSTF-542 Call TSTF-484-A Rev. 0 | Hydrostatic |
TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. | 2 August 2017 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. | Water Inventory Control |
ML17157B231 | 3 February 2017 | Attachment to February 13, 2017, e-mail: Use of a 95/95 Statistical Limit TSTF-564 | Anticipated operational occurrence |
TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 | 2 November 2016 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 | Reactor Vessel Water Level Water Inventory Control Hydrostatic Surveillance Frequency Control Program Fuel cladding Offsite Circuit Manual Operator Action |
TSTF-16-07, Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements. | 12 May 2016 | Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements. | Surveillance Frequency Control Program |
TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | 21 April 2016 | Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | Anticipated operational occurrence Surveillance Frequency Control Program |
ML18262A377 | 8 October 2015 | Inclusion of Open Phase Condition Equipment Requirements in the TSR2 | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Open Phase Condition Large early release frequency Operability Determination Fuel cladding Offsite Circuit |
TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. | 3 September 2015 | Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. | Surveillance Frequency Control Program Affidavit |
ML14328A417 | 13 November 2014 | TSTF Handout from 11/13/14 Meeting - Agenda Item 3.A - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 | Shutdown Margin Functionality Assessment Operability Determination Fuel cladding Recently irradiated fuel |
ML15034A164 | 10 April 2014 | TSTF Handout from 04/10/2014 Meeting - Monthly Status Report | Water Inventory Control Exemption Request |
ML15034A172 | 9 April 2014 | TSTF Handout from 04/10/2014 Meeting - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 | Shutdown Margin Functionality Assessment Operability Determination Fuel cladding Recently irradiated fuel |
TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal. | 4 March 2014 | Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal. | Safe Shutdown Time of Discovery High Radiation Area Non-Destructive Examination Stroke time Anticipated operational occurrence Internal Flooding Enforcement Discretion Functionality Assessment Incorporated by reference Tornado Generated Missile Missed surveillance Surveillance Frequency Control Program Stress corrosion cracking Excess Flow Check Valve Operability Determination Pressure Boundary Leakage Unidentified leakage Affidavit Operational leakage Water hammer |
TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. | 14 February 2012 | Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. | Offsite Circuit |
TSTF-10-24, Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | 24 November 2010 | Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Grab sample Enforcement Discretion Pressure Boundary Leakage Unidentified leakage Operational leakage |
TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A) | 30 August 2010 | Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A) | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Nondestructive Examination Surveillance Frequency Control Program Severe Accident Management Guideline Affidavit Manual Operator Action |
TSTF-10-05, Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation | 29 June 2010 | Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation | Boric Acid Reactor Vessel Water Level Stroke time Time to boil Functionality Assessment Stress corrosion cracking Operability Determination Affidavit Water hammer |
ML102500295 | 10 May 2010 | WCAP-16364-NP, Revision 2, Implementation Guidance for Risk Informed Modification to Selected Required Action End States at Combustion Engineering NSSS Plants (TSTF-422) | Safe Shutdown Ultimate heat sink |
ML093340364 | 5 April 2010 | Models for Adoption of TSTF-514, Revision 1, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | Grab sample Pressure Boundary Leakage Unidentified leakage |
TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. | 26 March 2009 | Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Stress corrosion cracking Operational leakage |
TSTF-08-05, TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners. | 4 March 2008 | TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners. | Probabilistic Risk Assessment Significance Determination Process Large early release frequency Severe Accident Management Guideline Earthquake Fuel cladding |
TSTF-07-26, TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. | 31 August 2007 | TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment High Energy Line Break Battery sizing Recently irradiated fuel |
ML072000473 | 19 July 2007 | Questions on NRC Review Fees | |
TSTF-07-14, TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. | 16 April 2007 | TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Incorporated by reference Scram Discharge Volume Operability Determination Fuel cladding Backfit Coast down Power Uprate Subsequent actuation |
ML070810523 | 31 August 1996 | NEI 96-06, Improved Technical Specifications Conversion Guidance. | Incorporated by reference Backfit |