Category:Report
MONTHYEARML24169A4062024-05-20020 May 2024 Draft Traveler TSTF-604, Revise Ventilation System Actions ML24121A2432024-04-30030 April 2024 Draft TSTF-603, Revise the Risk Informed Completion Time Backstop ML24067A1632024-03-0707 March 2024 NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk ML22258A1772022-09-15015 September 2022 Comments on Draft of Revision 2 of Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML22075A1722022-03-31031 March 2022 NRC Staff High Level Comments Rev 1 of Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML22045A4742022-02-0303 February 2022 NRC Comments on Draft TSTF-585, Rev 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time ML21155A1602021-06-0404 June 2021 Draft Industry Position Surveillance Requirements (Srs) That Reference the Inservice Testing (IST) Program and 10 CFR 50.69 Categorization ML21155A1032021-04-26026 April 2021 Draft TSTF-588, Remove List of COLR Methods ML20324A0762020-11-19019 November 2020 Active Traveler Summary Report for 11/19/2020 Quarterly Meeting ML20324A0702020-11-19019 November 2020 Post TSTF-505 RICT Adoption from 11/19/2020 Quarterly Meeting TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20113E8482020-04-22022 April 2020 Draft of Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, for May 2020 Presubmittal Meeting TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323C9022019-11-19019 November 2019 Revised Draft Traveler TSTF-576, Revise Safety/Relief Valve Requirements TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML18204A0242019-08-15015 August 2019 NRC Staff Feedback Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2. TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19056A4252019-02-21021 February 2019 NRC Staff Feedback to TSTF Proposed Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed. ML19058A0232019-02-21021 February 2019 Active Traveler Summary Report for 2.21.2019 Meeting TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-12012 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. ML18221A5612018-08-0909 August 2018 TSTF Input to Lifting the Suspension of Acceptance of Amendment Requests to Adopt TSTF-51, TSTF-471, and TSTF-286 TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues.2018-04-16016 April 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition.2018-02-0808 February 2018 Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. ML17297B7822017-10-24024 October 2017 Email Attachment for TSTF-542 Call TSTF-484-A Rev. 0 TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.2017-08-0202 August 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. ML17157B2312017-02-0303 February 2017 Attachment to February 13, 2017, e-mail: Use of a 95/95 Statistical Limit TSTF-564 TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 22016-11-0202 November 2016 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 TSTF-16-07, Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements.2016-05-12012 May 2016 Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements. TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2016-04-21021 April 2016 Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. ML18262A3772015-10-0808 October 2015 Inclusion of Open Phase Condition Equipment Requirements in the TSR2 TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements.2015-09-0303 September 2015 Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. ML14328A4172014-11-13013 November 2014 TSTF Handout from 11/13/14 Meeting - Agenda Item 3.A - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 ML15034A1642014-04-10010 April 2014 TSTF Handout from 04/10/2014 Meeting - Monthly Status Report ML15034A1722014-04-0909 April 2014 TSTF Handout from 04/10/2014 Meeting - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal.2014-03-0404 March 2014 Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal. TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications.2012-02-14014 February 2012 Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. TSTF-10-24, Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2010-11-24024 November 2010 Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A)2010-08-30030 August 2010 Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A) TSTF-10-05, Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation2010-06-29029 June 2010 Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation ML1025002952010-05-10010 May 2010 WCAP-16364-NP, Revision 2, Implementation Guidance for Risk Informed Modification to Selected Required Action End States at Combustion Engineering NSSS Plants (TSTF-422) ML0933403642010-04-0505 April 2010 Models for Adoption of TSTF-514, Revision 1, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2009-03-26026 March 2009 Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. TSTF-08-05, TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.2008-03-0404 March 2008 TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners. TSTF-07-26, TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.2007-08-31031 August 2007 TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. ML0720004732007-07-19019 July 2007 Questions on NRC Review Fees TSTF-07-14, TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.2007-04-16016 April 2007 TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. ML0708105231996-08-31031 August 1996 NEI 96-06, Improved Technical Specifications Conversion Guidance. 2024-05-20
[Table view] Category:Miscellaneous
MONTHYEARML24169A4062024-05-20020 May 2024 Draft Traveler TSTF-604, Revise Ventilation System Actions ML24121A2432024-04-30030 April 2024 Draft TSTF-603, Revise the Risk Informed Completion Time Backstop ML24067A1632024-03-0707 March 2024 NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk ML22258A1772022-09-15015 September 2022 Comments on Draft of Revision 2 of Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML22075A1722022-03-31031 March 2022 NRC Staff High Level Comments Rev 1 of Draft Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time ML22045A4742022-02-0303 February 2022 NRC Comments on Draft TSTF-585, Rev 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time ML21155A1602021-06-0404 June 2021 Draft Industry Position Surveillance Requirements (Srs) That Reference the Inservice Testing (IST) Program and 10 CFR 50.69 Categorization ML21155A1032021-04-26026 April 2021 Draft TSTF-588, Remove List of COLR Methods ML20324A0702020-11-19019 November 2020 Post TSTF-505 RICT Adoption from 11/19/2020 Quarterly Meeting ML20324A0762020-11-19019 November 2020 Active Traveler Summary Report for 11/19/2020 Quarterly Meeting ML20113E8482020-04-22022 April 2020 Draft of Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, for May 2020 Presubmittal Meeting ML19323C9022019-11-19019 November 2019 Revised Draft Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML18204A0242019-08-15015 August 2019 NRC Staff Feedback Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2. TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19058A0232019-02-21021 February 2019 Active Traveler Summary Report for 2.21.2019 Meeting TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-12012 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. ML18221A5612018-08-0909 August 2018 TSTF Input to Lifting the Suspension of Acceptance of Amendment Requests to Adopt TSTF-51, TSTF-471, and TSTF-286 TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues.2018-04-16016 April 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition.2018-02-0808 February 2018 Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. ML17297B7822017-10-24024 October 2017 Email Attachment for TSTF-542 Call TSTF-484-A Rev. 0 TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.2017-08-0202 August 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. ML17157B2312017-02-0303 February 2017 Attachment to February 13, 2017, e-mail: Use of a 95/95 Statistical Limit TSTF-564 TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 22016-11-0202 November 2016 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2016-04-21021 April 2016 Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. ML18262A3772015-10-0808 October 2015 Inclusion of Open Phase Condition Equipment Requirements in the TSR2 TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements.2015-09-0303 September 2015 Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. ML14328A4172014-11-13013 November 2014 TSTF Handout from 11/13/14 Meeting - Agenda Item 3.A - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 ML15034A1642014-04-10010 April 2014 TSTF Handout from 04/10/2014 Meeting - Monthly Status Report ML15034A1722014-04-0909 April 2014 TSTF Handout from 04/10/2014 Meeting - Revised TSTF Response to NRC Concerns with TSTF-471, 286, and 51 TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications.2012-02-14014 February 2012 Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. 2024-05-20
[Table view] |