Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report12 December 2023Licensing Basis Document Update and Biennial Commitment Change ReportAging Management
License Renewal
ML21349B35315 December 2021Attachment 4: Technical Specification Bases, Revision 124
ML21349B33815 December 202110 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change ReportAging Management
License Renewal
ML21349B35215 December 2021Attachment 4: Licensee Controlled Specifications, Revision 122Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Post Accident Monitoring
Coatings
Met Tower
Operator Manual Action
Functionality Assessment
FLEX
B.5.b
Missed surveillance
Scram Discharge Volume
Excess Flow Check Valve
Operability Determination
Battery sizing
Earthquake
Turbine Missile
Operability Assessment
Power Uprate
Measurement Uncertainty Recapture
GO2-21-041, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.4615 March 2021Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46
GO2-20-039, Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report26 February 2020Energy Northwest to EFSEC, Fish Entraiment Characterization Final ReportBiofouling
GO2-19-136, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi26 September 2019Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-IchiSafe Shutdown
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Scram Discharge Volume
Large early release frequency
Severe Accident Management Guideline
Earthquake
GO2-19-100, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)20 August 2019Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)
GO2-19-035, Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report7 February 2019Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim ReportBiofouling
ML18285A45018 April 20181175ENWCGS, Revision 00, Computational Fluid Dynamics Analysis of Perforated Intake Screens at Columbia Generating Station.
GO2-17-139, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report3 August 2017Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation ReportPost Accident Monitoring
ML17072A03610 March 2017Endangered Species Act Section 7(a)(2) Biological Opinion, and Magnuson-Stevens Fishery Conservation Act Essential Fish Habitat Response for Renewing the Operating License for Columbia Generating Station, Richland, WashingtonGrab sample
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
License Renewal
ML16337A1097 December 2016Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML16333A0947 December 2016Current Design Basis Flood Hazards for Use in the MSA
GO2-16-104, LAR to Change EAL Scheme28 July 2016LAR to Change EAL Scheme
ML16214A37228 July 2016Summary of Radiological Calibration Turbine Building Ventilation System Exhaust Monitor TEA-RIS-13
GO2-16-024, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report25 January 2016Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation ReportPost Accident Monitoring
GO2-16-001, Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report20 January 2016Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 ReportHalf scram
Post Accident Monitoring
Cyber Security
ML15355A48621 December 2015Revision 87 to Licensee Controlled Specifications (LCS)Safe Shutdown
Unanalyzed Condition
Time of Discovery
Reactor Vessel Water Level
High Radiation Area
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Post Accident Monitoring
Coatings
Met Tower
Operating Basis Earthquake
Operator Manual Action
Functionality Assessment
Missed surveillance
Scram Discharge Volume
Excess Flow Check Valve
Operability Determination
Battery sizing
Earthquake
Turbine Missile
Grace period
Operability Assessment
GO2-15-110, Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary31 August 2015Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-ProprietaryNon-Destructive Examination
Safe Shutdown Earthquake
MELLLA
Earthquake
EVT-1
Flow Induced Vibration
ML14335A15825 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)Safe Shutdown
Safe Shutdown Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Containment Hardened Vent
Battery sizing
Earthquake
Scaffolding
GO2-15-045, Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident12 March 2015Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
License Renewal
Earthquake
Seismic Walkdown Report
GO2-15-039, TIA XXXX-XX, Tower Makeup System Unresolved Issue6 March 2015TIA XXXX-XX, Tower Makeup System Unresolved IssueSafe Shutdown
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Tornado Missile Protection
Earthquake
Backfit
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14064A31111 March 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13337A26629 January 2014Interim Staff Evaluation and Audit Report Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Containment Hardened Vent
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
ML14037A17521 January 2014Independent Spent Fuel Storage Installation, Biennial Commitment Changes and 50.59/72.48 ReportUltimate heat sink
Anticipated operational occurrence
Temporary Modification
Fuel cladding
ML13357A32221 December 2013Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Columbia Generating Station, TAC No.: MF0796Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Containment Hardened Vent
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
GO2-13-151, NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.30 September 2013NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.Safe Shutdown
Anticipated operational occurrence
MELLLA
Power Uprate
ML13241A26412 August 2013Enclosure 2 - Columbia Generating Station, Final Seismic Walkdown Summary Report (Public Version)Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Locked High Radiation Area
Scaffolding
ML13108A2194 April 2013RWCU Regenerative Heat Exchanger Piping Repair Patch AnalysisFinite Element Analysis
ML13015A27331 December 2012NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault DetectionTemporary Modification
ML13015A27231 December 2012NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function.Anticipated operational occurrence
Commercial Grade Dedication
MELLLA
ML12328A07930 November 2012NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5
ML12328A07831 October 2012NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3
GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 230 October 2012Initial Seismic Walkdown Summary Report, Enclosure 2Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
B.5.b Mitigating Strategies
Earthquake
Scaffolding
GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-3375831 July 2012Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758MELLLA
Earthquake
ML12102A23813 June 2012Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation ReportLicense Renewal
ML12160001711 June 2012Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi AccidentFukushima Dai-Ichi
Earthquake
ML12101A3954 May 2012Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation ReportLicense Renewal
ML12040A07731 January 2012NEDO-33697, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Analysis ReportMELLLA
ML12040A07431 January 2012NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip FunctionAnticipated operational occurrence
Commercial Grade Dedication
MELLLA
ML12040A07631 January 2012NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) AnalysisShutdown Margin
Anticipated operational occurrence
MELLLA
ML12040A08031 January 2012NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla)Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Safe Shutdown Earthquake
Feedwater Controller Failure
MELLLA
Earthquake
Fuel cladding
Power change
Coast down
GOTHIC
ML12040A07931 January 2012NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 AreAnticipated operational occurrence
Commercial Grade Dedication
Temporary Modification
MELLLA
Fuel cladding
ML12040A07530 November 2011NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis ReportMELLLA
GO2-11-180, Response to Request for Additional Information Regarding the License Renewal Application10 November 2011Response to Request for Additional Information Regarding the License Renewal ApplicationCoatings
Aging Management
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
GO2-11-072, 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models5 April 201110 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models
ML10244034219 August 2010Columbia Generating Station - Response to Request for Additional Information License Renewal ApplicationSafe Shutdown
Fire Barrier
Coatings
VT-2
Zebra Mussel
Aging Management
Biofouling
Fire Protection Program