ML21349B352
From kanterella
Jump to navigation
Jump to search
ML21349B352 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 12/15/2021 |
From: | Energy Northwest |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21349B351 | List: |
References | |
GO2-21-131 | |
Download: ML21349B352 (436) | |
Similar Documents at Columbia | |
---|---|
Category:Report
MONTHYEARGO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023
[Table view]Licensing Basis Document Update and Biennial Commitment Change Report ML21349B3532021-12-15015 December 2021 Attachment 4: Technical Specification Bases, Revision 124 ML21349B3382021-12-15015 December 2021 10 CFR 50.71 Maintenance of Records Licensing Basis Document Update and Biennial Commitment Change Report ML21349B3522021-12-15015 December 2021 Attachment 4: Licensee Controlled Specifications, Revision 122 GO2-21-041, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462021-03-15015 March 2021 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-20-039, Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report2020-02-26026 February 2020 Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report GO2-19-136, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi2019-09-26026 September 2019 Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi GO2-19-100, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)2019-08-20020 August 2019 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) GO2-19-035, Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report2019-02-0707 February 2019 Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report ML18285A4502018-04-18018 April 2018 1175ENWCGS, Revision 00, Computational Fluid Dynamics Analysis of Perforated Intake Screens at Columbia Generating Station. GO2-17-139, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2017-08-0303 August 2017 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report ML17072A0362017-03-10010 March 2017 Endangered Species Act Section 7(a)(2) Biological Opinion, and Magnuson-Stevens Fishery Conservation Act Essential Fish Habitat Response for Renewing the Operating License for Columbia Generating Station, Richland, Washington ML16337A1092016-12-0707 December 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request; Flood-Causing Mechanism Reevaluation ML16333A0942016-12-0707 December 2016 Current Design Basis Flood Hazards for Use in the MSA GO2-16-104, LAR to Change EAL Scheme2016-07-28028 July 2016 LAR to Change EAL Scheme ML16214A3722016-07-28028 July 2016 Summary of Radiological Calibration Turbine Building Ventilation System Exhaust Monitor TEA-RIS-13 GO2-16-024, Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report2016-01-25025 January 2016 Technical Specifications Section 5.6.4 Post Accident Monitoring Instrumentation Report GO2-16-001, Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report2016-01-20020 January 2016 Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report ML15355A4862015-12-21021 December 2015 Revision 87 to Licensee Controlled Specifications (LCS) GO2-15-110, Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary2015-08-31031 August 2015 Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary ML14335A1582015-03-25025 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) GO2-15-045, Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-03-12012 March 2015 Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident GO2-15-039, TIA XXXX-XX, Tower Makeup System Unresolved Issue2015-03-0606 March 2015 TIA XXXX-XX, Tower Makeup System Unresolved Issue ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14064A3112014-03-11011 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13337A2662014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A1752014-01-21021 January 2014 Independent Spent Fuel Storage Installation, Biennial Commitment Changes and 50.59/72.48 Report ML13357A3222013-12-21021 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Columbia Generating Station, TAC No.: MF0796 GO2-13-151, NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.2013-09-30030 September 2013 NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations. ML13241A2642013-08-12012 August 2013 Enclosure 2 - Columbia Generating Station, Final Seismic Walkdown Summary Report (Public Version) ML13108A2192013-04-0404 April 2013 RWCU Regenerative Heat Exchanger Piping Repair Patch Analysis ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection ML13015A2722012-12-31031 December 2012 NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 22012-10-30030 October 2012 Initial Seismic Walkdown Summary Report, Enclosure 2 GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML1216000172012-06-11011 June 2012 Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report ML12040A0772012-01-31031 January 2012 NEDO-33697, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Analysis Report ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report GO2-11-180, Response to Request for Additional Information Regarding the License Renewal Application2011-11-10010 November 2011 Response to Request for Additional Information Regarding the License Renewal Application ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants GO2-11-072, 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models2011-04-0505 April 2011 10 CFR 50.46 Report of Changes or Errors in ECCS LOCA Analysis Models ML1024403422010-08-19019 August 2010 Columbia Generating Station - Response to Request for Additional Information License Renewal Application 2023-12-12 Category:Technical MONTHYEARML21349B3522021-12-15015 December 2021
[Table view]Attachment 4: Licensee Controlled Specifications, Revision 122 ML21349B3532021-12-15015 December 2021 Attachment 4: Technical Specification Bases, Revision 124 GO2-20-039, Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report2020-02-26026 February 2020 Energy Northwest to EFSEC, Fish Entraiment Characterization Final Report GO2-19-136, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi2019-09-26026 September 2019 Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi GO2-19-100, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)2019-08-20020 August 2019 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) GO2-19-035, Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report2019-02-0707 February 2019 Energy Northwest to Energy Facility Site Evaluation Council, Columbia Generating Station Fish Entrainment Study Interim Report ML18285A4502018-04-18018 April 2018 1175ENWCGS, Revision 00, Computational Fluid Dynamics Analysis of Perforated Intake Screens at Columbia Generating Station. ML17072A0362017-03-10010 March 2017 Endangered Species Act Section 7(a)(2) Biological Opinion, and Magnuson-Stevens Fishery Conservation Act Essential Fish Habitat Response for Renewing the Operating License for Columbia Generating Station, Richland, Washington ML15355A4862015-12-21021 December 2015 Revision 87 to Licensee Controlled Specifications (LCS) GO2-15-110, Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary2015-08-31031 August 2015 Enclosure 2, Revision 2 to 001N6043.5-NP, Energy Northwest Columbia Generating Station Jet Pump 17/18 Riser Evaluation at 106% Rated Core Flow (115 Mlbs/Hr), Non-Proprietary GO2-15-045, Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-03-12012 March 2015 Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14064A3112014-03-11011 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13337A2662014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13357A3222013-12-21021 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Columbia Generating Station, TAC No.: MF0796 GO2-13-151, NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations.2013-09-30030 September 2013 NEDO-33813, Rev. 2, Technical Specification Change Support for Rhr/Lpci and LPCS Flow Rate. Long-Term LOCA Containment Response and ECCS/Non-LOCA Evaluations. ML13108A2192013-04-0404 April 2013 RWCU Regenerative Heat Exchanger Piping Repair Patch Analysis ML13015A2732012-12-31031 December 2012 NEDO-33698, Rev 2, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection ML13015A2722012-12-31031 December 2012 NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. ML12328A0792012-11-30030 November 2012 NEDO-33789, Revision 0, Numac Power Range Neutron Monitoring Components 268X1331TCG001, 268X1332TCG001, G002 268X1333TCG001, Qualification Summary for Energy Northwest (Enw) Columbia Generating Station (Cgs), Attachment 5 ML12328A0782012-10-31031 October 2012 NEDO-33751, Revision 3, Columbia Generating Station Power Range Neutron Monitoring System Reliability Analysis, Attachment 3 GO2-12-165, Initial Seismic Walkdown Summary Report, Enclosure 22012-10-30030 October 2012 Initial Seismic Walkdown Summary Report, Enclosure 2 GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-337582012-07-31031 July 2012 Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML12040A0742012-01-31031 January 2012 NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function ML12040A0762012-01-31031 January 2012 NEDO-33694, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Diversity and Defense-in-Depth (D3) Analysis ML12040A0792012-01-31031 January 2012 NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are ML12040A0772012-01-31031 January 2012 NEDO-33697, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Analysis Report ML12040A0802012-01-31031 January 2012 NEDO-33507, Revision 1, Columbia Generating Station Aprm/Rbm/Technical Specifications / Maximum Extended Load Line Limit Analysis (Arts/Mellla) ML12040A0752011-11-30030 November 2011 NEDO-33690, Revision 0, Columbia Generating Station Power Range Neutron Monitoring System Response Time Analysis Report GO2-10-071, 0000-0101-7647-R2, Columbia Generating Station. Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report (NEDC-32410P-A)2010-04-30030 April 2010 0000-0101-7647-R2, Columbia Generating Station. Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report (NEDC-32410P-A) ML1002506542010-01-19019 January 2010 Columbia Generating Station - License Renewal Application, Technical Information, Pages 3.4-1 to D-2 GO2-09-001, Gnf S-0000-0092-8136, Revision 0, GE14 Thermal Hydraulic Compatibility with Columbia Legacy Fuel, October 2008 (Non-Proprietary Version)2008-10-31031 October 2008 Gnf S-0000-0092-8136, Revision 0, GE14 Thermal Hydraulic Compatibility with Columbia Legacy Fuel, October 2008 (Non-Proprietary Version) ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 GO2-08-108, NEDO-33419, GEXL97 Correlation Applicable to ATRIUM-10 Fuel, Non-Proprietary Version2008-06-30030 June 2008 NEDO-33419, GEXL97 Correlation Applicable to ATRIUM-10 Fuel, Non-Proprietary Version GO2-06-105, Response to Request for Additional Information Related to Alternative Source Term License Amendment Request2006-08-0707 August 2006 Response to Request for Additional Information Related to Alternative Source Term License Amendment Request ML0532700812005-10-0303 October 2005 Rev. 0 to Inservice Testing Program Plan, Third Ten-Year Inspection Interval (December 13, 2005 Through December 2014). ML0522802622005-05-31031 May 2005 GE-NE-0000-0040-1432-00-01, Rev 0, Historical Licensing Evaluation of Post-CRDA RCIC Operation for Columbia Generating Station. ML0512901072005-04-0606 April 2005 Emergency Response Data System Change to Data Point Library ML0422303882004-06-0303 June 2004 C106-04-0001-5801, Columbia Generating Station Risk Assessment to Support ILRT (Type a) Interval Extension Request. ML17037B8851978-01-27027 January 1978 Letter Regarding a GE Report, Analytical Model for Estimating Drag Forces on Rigid Submerged Structures Caused by LOCA and Safety Relief Valve Ramshead Air Discharges, NEDO-21471, Dated September, 1977 ML17037B8881977-11-21021 November 1977 Letter Regarding Nedo 24070, Mark II Containment Supporting Program Report - Ramshead Safety/Relief Valve Load - Methodology Summary, September, 1977 ML17037B8911977-11-0303 November 1977 Letter Regarding Amendment 2, Supplement 2 (September 1977) to Mark II Containment Dynamic Forcing Functions Information Report (Dffr), NEDO-21061, Rev. 2 ML17037B8921977-10-25025 October 1977 Letter Regarding GE Topical Report Nedo 23617 Mark II Lead Plant Topical Report: Pool Boundary and Main Vent Chugging Load Justification, Dated July, 1977 ML17037B8941977-09-26026 September 1977 Letter Regarding GE Report Technical Basis for the Use of the Square Root of the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark II Plants - July, 1977 ML17037B8901977-09-23023 September 1977 Letter Regarding Mark II Containment Program Report, Comparison of the 1/3 Scale Mark II Containment Multivent Pool Swell Data with Analytical Methods, NEDO-21667, August 1977 ML17037B8951977-09-15015 September 1977 Letter Regarding Amendment 2, Supplement 1 (August 1977) to Mark II Containment Dynamic Forcing Functions Information Report (Dffr), NEDO-21061, Rev. 2 ML18191A2741976-01-12012 January 1976 Wppss Nuclear Project No. 2. Clarification of Criteria, Pipe Rupture Protection Inside Containment ML18191A3601975-09-0505 September 1975 Letter from Wppss to NRC of Final Report on the Successful Disposition of the Fabrication Difficulties on the WNP-2 Containment Vessel ML18191A2361975-03-26026 March 1975 Wppss Nuclear Project No. 2, Response to Request for Additional Information, Pipe Rupture Protection Inside Containment 2021-12-15 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML21349B352&oldid=3739422"