 Issue dateTitleTopic
PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping18 August 1999PNO-IV-99-035A:on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping
PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp11 August 1999PNO-IV-99-035:on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp
PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee30 November 1998PNO-IV-98-059:on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee
PNO-IV-97-069, on 971120,plant Received Security Threat. Licensee Implemented Interim Contigency Measures & Notified CPS as That Plant Was Also Mentioned in Threat.State of Mo Notified20 November 1997PNO-IV-97-069:on 971120,plant Received Security Threat. Licensee Implemented Interim Contigency Measures & Notified CPS as That Plant Was Also Mentioned in Threat.State of Mo Notified
PNO-III-88-011, on 880213,reactor Tripped from 100% Power Due to Main Turbine Trip.Safety Injection Sys Actuated Due to Low Steamline Pressure Signal.Relief Valve on Seal Leakoff Replaced W/Spare & Other Two Relief Valves Repaired16 February 1988PNO-III-88-011:on 880213,reactor Tripped from 100% Power Due to Main Turbine Trip.Safety Injection Sys Actuated Due to Low Steamline Pressure Signal.Relief Valve on Seal Leakoff Replaced W/Spare & Other Two Relief Valves Repaired
PNO-III-86-060, on 860621,reactor Tripped on lo-lo Water Level Signal from Steam Generator D.Caused by Closing of Feedwater Isolation Valve Due to Failure of Control Logic Card23 June 1986PNO-III-86-060:on 860621,reactor Tripped on lo-lo Water Level Signal from Steam Generator D.Caused by Closing of Feedwater Isolation Valve Due to Failure of Control Logic Card
PNO-III-86-047, on 860518,unit Shut Down to Repair Leaking Steam Generator C Feedwater Check Valve.Return to Svc Expected on 860522.State of Mo Informed19 May 1986PNO-III-86-047:on 860518,unit Shut Down to Repair Leaking Steam Generator C Feedwater Check Valve.Return to Svc Expected on 860522.State of Mo Informed
PNO-III-86-038, on 860423,nonvital Dc Circuit Breaker Found Tripped in Turbine Bldg.Caused by Equipment Operator Inadvertently Tripping Circuit Breaker.Security Surveillance Increased24 April 1986PNO-III-86-038:on 860423,nonvital Dc Circuit Breaker Found Tripped in Turbine Bldg.Caused by Equipment Operator Inadvertently Tripping Circuit Breaker.Security Surveillance Increased
PNO-III-86-036, on 860314,sabotage Threats Prompted Upgrade of Security Measures.Security Actions Reviewed by Region Iii.Plant Resumed Operations on 860415 After First Refueling Outage Which Began on 86022815 April 1986PNO-III-86-036:on 860314,sabotage Threats Prompted Upgrade of Security Measures.Security Actions Reviewed by Region Iii.Plant Resumed Operations on 860415 After First Refueling Outage Which Began on 860228
PNO-III-86-022A, on 860314,unidentified Male Telephoned & Stated Some Tags from Mechanical Equipment Removed.Util Added Security Personnel & Checked Plant.No Abnormal Conditions Observed.Investigation Continuing17 March 1986PNO-III-86-022A:on 860314,unidentified Male Telephoned & Stated Some Tags from Mechanical Equipment Removed.Util Added Security Personnel & Checked Plant.No Abnormal Conditions Observed.Investigation Continuing
PNO-III-86-022, on 860312,unidentified Male Made Announcement Over PA Sys to Evacuate Containment.On 860313,sabotage Threat Received Via Telcon.Security Contingency Plan Measures for Communicated Threat Implemented13 March 1986PNO-III-86-022:on 860312,unidentified Male Made Announcement Over PA Sys to Evacuate Containment.On 860313,sabotage Threat Received Via Telcon.Security Contingency Plan Measures for Communicated Threat Implemented
PNO-III-86-001, on 860108,fire Destroyed Warehouse Bldg Outside Protected Area at Facility.Cause of Fire Undetermined.No Injuries Reported.No Radioactive Matl Involved.State of Mo & Region III Notified9 January 1986PNO-III-86-001:on 860108,fire Destroyed Warehouse Bldg Outside Protected Area at Facility.Cause of Fire Undetermined.No Injuries Reported.No Radioactive Matl Involved.State of Mo & Region III Notified
PNO-III-85-065A, on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures1 August 1985PNO-III-85-065A:on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures
PNO-III-85-065, on 850729,licensee Reported Possible Tampering Incident Involving Overcurrent Relay for Containment Spray Pump 1B.Relay Reset.Security Intensified. Investigation Underway30 July 1985PNO-III-85-065:on 850729,licensee Reported Possible Tampering Incident Involving Overcurrent Relay for Containment Spray Pump 1B.Relay Reset.Security Intensified. Investigation Underway
PNO-III-84-049, on 840611,OL Issued to Util for Callaway Nuclear Power Station.License Limited to Fuel Loading & Operation Up to 5% Power12 June 1984PNO-III-84-049:on 840611,OL Issued to Util for Callaway Nuclear Power Station.License Limited to Fuel Loading & Operation Up to 5% Power
ML20249A75029 March 1978PNS-78-013:on 780328,guard Received Telephone Call from Female Caller Alleging That Bomb Had Been Placed in Reactor Bldg.Search of Bldg by Construction & Protective Personnel Failed to Disclose Any Suspect Devices
ML20248L25322 March 1978PNO-78-057:on 780321,W Smart Was Terminated for Failure to Perform Work Ordered by Foreman.Investigation of Firing of Smart Being Conducted,As Requested by Drey
ML20236E9086 March 1978PNS-78-000:on 780302,guard Received Telcon at Guard House from Anonymous Male Caller Who State, Bomb Will Go Off in twenty-five Minutes. When Asked Location of Bomb,Caller Hung Up.Guards Dispatched to Check for Possible Breaches
ML20207G64726 October 1977PNO-77-190:on 771026,an Ironworker Employed at Callaway Const Site Has Alleged That Defective Imbedments Were Installed in Concrete Structures & That QC Inspectors Inadequately Trained