Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20059M670 | 28 September 1990 | Advises That Shim 4 Did Not Return to Normal Position on 900918.Bearing-seal Assemblies Replaced Using Stainless Steel Bearings | |
ML20059H212 | 7 September 1990 | Informs of Error in Scheduled Quarterly Surveillance Test 5.6.1.Test Inadvertently Scheduled for Aug Rather than May, 1990.Error Occurred Due to Surveillance Date Changes Necessitated by Extended Reactor Shutdown | |
ML20056A265 | 1 August 1990 | Provides Addl Info on Request for Change to Section 6.2 of Tech Specs.Basic Design Considerations Unchanged Re Performance,Matl,Design Pressure & Temp & Fabrication Code Requirements | |
ML20055H331 | 23 July 1990 | Certifies That Congressional Appropriation for Decommissioning of Reactor Will Be Requested When Necessary. Amount of Appropriation Will Be Based on FY90 Estimated Cost | |
ML20055H328 | 17 July 1990 | Forwards Certification Verifying That Congressional Appropriation Will Be Requested Re Decommissioning Reactor. Decommissioning Estimated to Require Min of Five Yrs | |
ML20012A470 | 2 March 1990 | Forwards Proposed Addendum 1 to Physical Security Plan,For Approval.Addendum Upgrades Plan Per Recommendations Contained in 1987 Nonpower Reactor Sabotage Study (U). W/O Encl | |
ML20011E675 | 14 February 1990 | Advises That Funding for Conversion of NIST Reactor to Low Enriched U Fuel Unavailable,Per Encl DOE 900206 Ltr.Schedule for Conversion of NIST Reactor to Low Enriched U Cannot Be Submitted | |
ML19332B872 | 15 November 1989 | Forwards Revised Section 7.5(c),Step 2,Page 14 of Emergency Plan,Involving Use of Search or Surveillance or Both as Alternate Method of Accounting for Personnel in Confinement Bldg During Site Area Emergency | |
ML20063Q054 | 29 November 1988 | Discusses Transfer of Activities,Responsibilities & Obligations of Nbs to Natl Institute of Stds & Technology. Designation of Reactor Will Continue to Be Nbsr | |
ML20154P312 | 18 May 1988 | Forwards Addl Info Re Application for Amend to Nbsr Tech Specs Per NRC 871217 Request | |
ML20151U346 | 21 April 1988 | Forwards Corrected Operations Rept 40,1987, Correcting Typos | |
ML20196E888 | 25 February 1988 | Informs That Funding for Conversion of Nbs Reactor to Low Enriched U Fuel Not Available.Schedule for Conversion of Nbs Reactor Cannot Be Submitted at This Time | |
ML20237J200 | 11 August 1987 | Forwards Study Rept, Penetrations in Reactor Bldg for New Hot Plug Storage,Hx Vault & Neutron Beam Tubes, Supporting Nbs 870622 Application for Amend to Tech Specs | |
ML20207R756 | 10 March 1987 | Submits Addl Info Re Nbs Reactor Use of Highly Enriched Fuel,Per 870211 Request.Majority of Programs at Nbs Reactor Require Current Enrichment Levels.Lowering of Enrichment Level Below 80 % Unacceptable | |
ML20212K399 | 4 March 1987 | Informs That Funding for Conversion of Nbs Reactor to Low Enriched U Fuel Not Available,Per Encl DOE . Schedule for Conversion of Nbs Reactor Cannot Be Submitted at Present | |
ML20212L301 | 27 February 1987 | Forwards Addl Info Re 861230 Unique Purpose Exemption Request,Including Discussion of Facility Contributions in Natl Interest & Demonstration That Reactor Could Not Perform Function W/O high-enriched U | Exemption Request |
ML20210K741 | 19 September 1986 | Requests Exemption from Conversion from High Enriched U Fuel to Low Enriched U Fuel.Conversion Would Reduce Unique Reactor Purpose of Providing Natl Measurement Capability to Address Large Variety of Important Research Areas | |
ML20128H226 | 10 May 1985 | Responds to Violations Noted in Insp Rept 50-184/85-01. Corrective Actions:Personnel Posted Inside Process Room.Need for Action Disputed | High Radiation Area |
ML20115F294 | 15 April 1985 | Requests 2-month Extension Until 850731 to Complete Implementation of New Emergency Plan,Due to Unexpected Delays in Completing Reactor Mods | |
ML20099L396 | 23 November 1984 | Withdraws 840921 Request to Review Proposed Cold Neutron Source Experiment,Per 841030 Discussion.Experiment Satisfies 10CFR50.59 for Changes Permitted W/O Prior NRC Approval | |
ML20098E126 | 21 September 1984 | Responds to 840823 Request for Schedule to Implement New Emergency Response Plan.Preparation of Procedures & Training to Implement Emergency Response Plan Expected to Be Completed in May 1985 | |
ML20098G358 | 21 September 1984 | Forwards for Review & Approval, SAR on D2O Cold Neutron Source for Nbs Reactor | |
ML20083H726 | 6 January 1984 | Advises That Magnetically Coupled Contacts on mercury-wetted Contact Type Relays Will Open & Initiate Scram.Currently, Four Subj Relays Installed in Reactor | |
ML20072L336 | 18 March 1983 | Forwards Operations Rept 34,Jul-Dec 1982 | |
ML20071Q679 | 4 November 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-184/82-02.Corrective Actions:Subj Individual Checked Out on Pneumatic Facility & Was on Approved List of Users | |
ML20063P176 | 30 September 1982 | Forwards Operations Rept 33,Jan-June 1982 | |
ML20071M673 | 22 September 1982 | Advises That EIS Re Licensing Renewal & Power Increase Scheduled for Fr Publication on 820924.Public Review Period Will Terminate on 821025 | |
ML20052G482 | 14 May 1982 | Discusses Proposed Relocation of Emergency Control Station to Basement of Reactor Bldg.New Location Will Be More Functional & Accessible | |
ML20054C619 | 12 April 1982 | Confirms Understanding Re Removal of Inner & Outer Plenna Check Valves.Valve Removal Comes Under Provisions of 10CFR50.59 & Requires No Prior NRC Authorization | |
ML20050B534 | 30 March 1982 | Forwards Semiannual Operating Rept,Jul-Dec,1981. | |
ML20041C531 | 25 February 1982 | Advises of No Comments Re Renewal of License TR-5 for Operation of Nbs Reactor in Gaithersburg,Md | |
ML20049H730 | 24 February 1982 | Verifies Official Filing of NUREG-0877,EIS for Facility. EPA Scheduled Publication of Notice of Availability in Fr on 820226.Public Review Period Terminates 820412 | |
ML20040C604 | 26 January 1982 | Submits Environ Info in Response to Telcon.Tritium Releases to Sanitary Sewers for 1975-1981 & Sensitivity of Environ Monitoring Listed | |
ML20010J302 | 29 September 1981 | Forwards Answers to First 14 NRC Questions Re Environ Rept. Encl Rept, Geology,Seismology & Hydrology of Nbs Research Reactor Site,Gaithersburg,Md, Contains Answers to Questions 15 & 16 | Safe Shutdown High Radiation Area |
ML20010G187 | 10 September 1981 | Forwards Semiannual Operating Rept for Jan-June 1981 | |
ML19343C445 | 20 March 1981 | Forwards Operations Rept 30 for Jul-Dec 1980. | |
ML19347B289 | 26 September 1980 | Forwards Semiannual Operating Rept,Jan-June 1980. | |
ML19340E196 | 8 April 1980 | Forwards Semiannual Operating Rept 28,Jul-Dec 1979. | |
ML19309D036 | 15 February 1980 | Responds to NRC 800122 Ltr Re Violations Noted in IE Insp Rept 50-184/79-05.Corrective Actions:Attention Drawn to Existing Requirements & Periodic Surveys of Outside Areas Implemented | |
ML19309C723 | 15 February 1980 | Requests That IE Insp Rept 50-184/80-01 Be Withheld (Ref 10CFR2.790).Info Contained in Rept Reveals Amount,Type & Location of Inventory of SNM | |
ML19262A064 | 19 October 1979 | Forwards Executed Copy of Amend 12 to Indemnity Agreement D-9 | |
ML19208D521 | 28 September 1979 | Forwards Operations Rept 27, Jan-June 1979 | |
ML19207B457 | 15 August 1979 | Discusses Irregularities in Regulatory Rod Movements.Cause Is Unknown But Short Range Binding in Neighborhood of 25 Degrees May Result from Faulty Bearings on Shim Arm Shaft. Further Tests Are Planned.Reactor Will Remain Shut Down | |
ML19276G331 | 15 May 1979 | Forwards Executed Amend 11 to Indemnity Agreement D-9 | |
ML20062D302 | 7 November 1978 | on 781102 During Routine Test,Shim Arm 1 Had Drop Time in Excess of Acceptable Range Caused by Slightly Longer Clutch Release.Assembly Removed & Snap Ring on Armature Hub Replaced in Favor of a More Uniform Support | |
ML20148U131 | 23 August 1978 | Forwards Pages of IE Inspec Rept 50-184/78-04 & Requests That Noted Portions Be Withheld from Pub Disclosure | High Radiation Area |