Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211K861 | 1 September 1999 | Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed | |
ML20210P136 | 4 August 1999 | Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop | |
ML20206U272 | 13 May 1999 | Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant | |
ML20206E933 | 3 May 1999 | Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station | |
ML20206U280 | 28 April 1999 | Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station | |
ML20207L567 | 12 March 1999 | Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 | Boric Acid High winds Shutdown Margin High Radiation Area Time to boil Job Performance Measure Deep Dose Equivalent Downpower Unidentified leakage |
ML20207E609 | 3 March 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 | |
ML20155G466 | 3 November 1998 | Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR | |
ML20155F629 | 3 November 1998 | Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 | High Radiation Area Locked High Radiation Area Job Performance Measure Scaffolding |
ML20151V295 | 2 September 1998 | Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE | |
ML20197C804 | 2 September 1998 | Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations | |
ML20197C830 | 1 September 1998 | Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl | Fire Barrier |
ML20237D433 | 21 August 1998 | Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs | |
ML20236Y630 | 8 August 1998 | Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld | |
ML20237A001 | 7 August 1998 | Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl | |
ML20249A223 | 12 June 1998 | Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion | |
ML20248L862 | 9 June 1998 | Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld | |
ML20217E388 | 23 April 1998 | Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion | |
ML20217H542 | 31 March 1998 | Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 | |
ML20216H340 | 17 March 1998 | Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal | |
ML20216H697 | 17 March 1998 | Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF | |
ML20203M668 | 23 February 1998 | Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo | Anticipated operational occurrence |
ML20203G855 | 23 February 1998 | Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues | |
ML20202E014 | 25 November 1997 | Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted | Boric Acid Fitness for Duty Foreign Material Exclusion Fire Watch Scaffolding Stolen Backfit |
IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted | 25 November 1997 | Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted | Boric Acid Fitness for Duty Foreign Material Exclusion Fire Watch Scaffolding Stolen Backfit |
ML20202E583 | 25 November 1997 | Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals | |
ML20203C362 | 25 November 1997 | Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals | |
ML20236N511 | 22 October 1997 | Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable | Boric Acid |
ML20217K827 | 16 October 1997 | Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators | |
ML20217D426 | 30 September 1997 | Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl | Stroke time Enforcement Discretion Operability Determination Liquid penetrant |
ML20217E159 | 26 September 1997 | Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 | |
ML20217B390 | 23 September 1997 | Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 | |
ML20210S846 | 2 September 1997 | Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb | |
ML20217Q953 | 28 August 1997 | Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb | |
ML20210L783 | 18 August 1997 | Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break | |
IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump | 15 August 1997 | Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump | |
ML20205D428 | 15 August 1997 | Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump | |
ML20205M333 | 28 July 1997 | Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure | Fire Watch Hourly Fire Watch |
ML20149L190 | 22 July 1997 | Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled | |
IR 05000335/1997005 | 17 July 1997 | Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 | Foreign Material Exclusion |
ML20149F273 | 3 July 1997 | Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data | |
ML20138D278 | 28 April 1997 | Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage | |
ML20202E026 | 23 April 1997 | Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin Packing leak High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Commercial Grade Dedication Enforcement Discretion Coatings Nondestructive Examination VT-2 Locked High Radiation Area Foreign Material Exclusion Process Control Program Systematic Assessment of Licensee Performance Operability Determination Exemption Request Maintenance Rule Program Control of Heavy Loads Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Scaffolding Power change Downpower Operability Assessment |
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
ML20217D546 | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
ML20147J239 | 9 April 1997 | Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations | |
ML20137L297 | 31 March 1997 | Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 | Safe Shutdown Boric Acid Maintenance Rule Program Fire Protection Program |
ML20137R883 | 27 March 1997 | Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis | Safe Shutdown Boric Acid Packing leak Ultimate heat sink Fire Barrier Contraband Past operability Probabilistic Risk Assessment Coatings Temporary Modification Fire Protection Program Backfit Unidentified leak |
ML20137L098 | 25 March 1997 | Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl | |
ML20137L231 | 25 March 1997 | Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl |