ML20155G466
ML20155G466 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 11/03/1998 |
From: | Bies M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20155G468 | List: |
References | |
50-454-98-301OL, 50-455-98-301OL, NUDOCS 9811090062 | |
Download: ML20155G466 (1) | |
Similar Documents at Byron | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211K8611999-09-0101 September 1999
[Table view]Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20206U2721999-05-13013 May 1999 Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206U2801999-04-28028 April 1999 Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station ML20155G4661998-11-0303 November 1998 Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR ML20155F6291998-11-0303 November 1998 Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20217H5421998-03-31031 March 1998 Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217E1591997-09-26026 September 1997 Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20210S8461997-09-0202 September 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of MSB ML20217Q9531997-08-28028 August 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of MSB ML20210L7831997-08-18018 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20135D8861996-12-0505 December 1996 Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp ML20135C4761996-12-0505 December 1996 Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1 ML20135D1241996-12-0404 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014 ML20135B4811996-12-0303 December 1996 Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20149L7721996-11-14014 November 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1 ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed 1999-09-01 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20211K8611999-09-0101 September 1999
[Table view]Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20206U2721999-05-13013 May 1999 Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206U2801999-04-28028 April 1999 Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station ML20155G4661998-11-0303 November 1998 Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR ML20155F6291998-11-0303 November 1998 Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20217H5421998-03-31031 March 1998 Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217E1591997-09-26026 September 1997 Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20210S8461997-09-0202 September 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of MSB ML20217Q9531997-08-28028 August 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of MSB ML20210L7831997-08-18018 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20135D8861996-12-0505 December 1996 Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp ML20135C4761996-12-0505 December 1996 Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1 ML20135D1241996-12-0404 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014 ML20135B4811996-12-0303 December 1996 Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20149L7721996-11-14014 November 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1 ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed 1999-09-01 |
See also: IR 05000454/1998301
Text
_
_ . _ _ _
~ - . _ . _ _ - . _ . _ _ .. . _ . .
. . _ _ . _ . . . . . . _ . _ _ _ _ _ _ _ _
.m_
.. __ _ _ _ . _. _
[5f09
UNITED STATES
%,
NUCLEAR REGULATORY COMMISSION
8
o
REGION lli
{
j
801 WARRENVILLE ROAD
LISLE, ILLINOIS 60532-4351
- $.,...../
November 3,1998
NOTE TO:
NRC Document Control Desk
,
'
Mail Stop 0-5-D-24
FROM:
Mary Ann Bies, Ucensing Assistant
Operating Licensing Branch, Rlli
W
Siv
D
'
SUBJECT:
OPERATOR Li'2ANSING EXAMINATION ADMINISTERED THE
WEEK OF SEPTEMBER 14,1998, AT BYRON NUCLEAR POWER
STATION, DOCKET NOS. 50-454 AND 50-455
'
4
During the week of September 14,1998, Operator Licensing Examinations were
administered at the referenced facility. Attached, you will find the following information for
processing through NUDOCS and distribution to the NRC staff, including the NRC PDR:
Item #1 -
a)
Facility submitted outline and initial e::am submittal,
designated for distribution under RIDS Code A070.
b)
As-given operating examination, designated for distribution under
RIDS Code A070.
Item #2 -
Examination Report with the as-given written examination attached,
'
designated for distribution under RIDS Code IE42.
1
Attachments: As stated
Cf.OblU
9811090062 981103
ADOCK 05000454
V
.
--_
..
_
_ _ _
_.
.
l.
^1
!
3
i-
l.
f
L-
O. Kingsley
4
!'
i
,
(
Distribution:
Project Mgr., NRR w/encls 1,2,3 & 4
J. Caldwell, Rill w/encls 1,2,3 & 4
C. Pederson, Rlll w/encls 1,2,3 & 4
l
B. Clayton, Rlli w/encls 1,2, 3 & 4
SRI Byron w/encls 1,2, 3 & 4
,
DRP w/encls 1,2, 3 & 4
l
TSS w/encls 1,2, 3 & 4
j
DRS (2) w/encls 1,2,3 & 4
Rlli PRR w/encls 1,2,3 & 4
PUBLIC IE-42 w/encls 1,2,3,4 & 5
l
' Docket File w/encls 1,2,3 & 4
,
GREENS
l
LEO (E-Mail)
DOCDESK (E-Mail)
l
- M. Bies, Rlll w/encls 1,2,3 & 4
i
l
1
i
l
l
t
I
i
I
'
,
,
>
.
D