ML20149L190

From kanterella
Jump to navigation Jump to search
Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled
ML20149L190
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/22/1997
From: Lynch M
NRC (Affiliation Not Assigned)
To: Capra R
NRC (Affiliation Not Assigned)
References
NUDOCS 9707310179
Download: ML20149L190 (3)


Text

.-

ks T. K6 O.

L j C' 2

July 22, 1997 MEMORANDUM T0:

Robert A. Capra, Director Project Directorate III-2 Division of Reactor Projects - III/IV, NRR j

FROM:

M. David Lynch, Project Manager ORIGINAL SIGNED BY:

Project Directorate III-2 Division of Reactor Projects - III/IV, NRR

SUBJECT:

FORTHCOMING MEETING WITH COMMONWEALTH EDIS0N COMPANY (COMED)

DATE & TIME:

Wednesday,' July 23, 1997 1:00 PM to 4:00 PM LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 08811 Rockville, Maryland 3

PURPOSE:

To discuss the results of the spring 1997, Braidwood, Unit 1, steam generator tube eddy current inspection, including the determination of the impact of this data on the permissible operating intervals for Braidwood, Unit 1, and Byron, Unit 1.

PARTICIPANTS:* NRC UTILITY B. Sheron, NRR J. Blomgren J. Strosnider, NRR D. Saccamondo, et. al E. Sullivan, NRR P. Rush, NRR 4

S. Coffin, NRR C. Beardslee, NRR

/,I M. D. Lynch, NRR R. Capra, NRR G. Dick, NRR hh O

S. Bailey, NRR R. Lanksbury, RIII

. f5 Docket Nos. STN 50-454, STN 50-456 b

  • O cc: See next page hhhk.ES M WY CONTACT:

M. D. Lynch, NRR h

(301) 415-3023 l2 o a:

Ma.

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the _Public" 59 Federal Reaister 48340, 9/20/94.

DOCUMENT NAME: G:\\CMNTJR\\ BRAID \\72397PM.MTG TD receive a copy of th,le-document, indicaterip the box:

"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE Mf2%2% )T l

LA)f)D34 l v_ - D:PD3-2 l

NAME

  1. fiW1 (MjbRT

\\

RCAPRA DATE 07//f/97 V

T 07/f_h97 07/2}/97 0FFICIAL RECORD COPY b J. b O 3 7' fS

- T Bf, Q4

m h *P #"."

6 % /\\,. @,,,

4.

\\ d bMD b

4 UNITED STATES g )

j NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D.C. 20556-0001

+, +,,,, p$

July 22, 1997 1

MEMORANDUM T0: Robert A. Capra, Director Project Directorate III-2 Division of Reactor Projects - III/IV N2" FROM:

M. David Lynch, Project Manager y_J l

Project Directorate III-2 Division of Reacter Projects - III/IV, NRR i

SUBJECT:

FORTHCOMING MEETING WITH COMMONWEALTH EDIS0N COMPANY (COMED) i i

DATE & TIME:

Wednesday, July 23, 1997 1:00 PM to 4:00 PM LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 08811 Rockville, Maryland PURPOSE:

To discuss the results of the spring 1997, Braidwood, Unit 1, steam generator tube eddy current inspection, including the determination of the impact of this data on the permissible operating intervals for Braidwood, Unit 1, and Byron, Unit 1.

PARTICIPANTS:* EC UTILITY B. Sheron,-NRR J. Blomgren J. Strosnider, NRR D. Saccamondo, et al E. Sullivan, NRR P. Rush, NRR S. Coffin, NRR C. Beardslee, NRR M. D. Lynch, NRR R. Capra, NRR G. Dick, NRR S. Bailey, NRR R. Lanksbury, RIII Docket Nos. STN 50-454, STN 50-456 cc: See next page 30 3b2

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

' T$ ht.

SPNj L

.r-..,

4 Meetina Notice E-Mail Hard Cooy S. Collins /F. Miraglia (SJC1/FJM)

Docket Files R. Zimmerman (RPZ)

PUBLIC J. Roe (JWR)

PD#3-2 r/f E. Adensam (EGA1)

OGC, 015B18 R. Capra (RAC1)

ACRS, T2E26 M. D. Lynch (MDL)

Receptionist (0WFN)

C. Moore (ACM)

D. Ross'(e-mail to SLM3)

OPA (e-mail to OPA)

B. Sheron (BWS)

J. Strosnider (JRS2)

E. Sullivan (EJS)

P. Rush (PJRI)

S. Coffin (SMC1)

C. Beardslee (CDB)

G. Dick (GFD)

S. Bailey (SNB)

R. Lanksbury, RIII (RDL)

G. Holahan (GMH)

S. Dembek (SXD)

G. Tracy (GMT)

J. Strasma (RJS2), Region III PMNS (Meeting Announcement Coordinator) l l