Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20198A3734 December 1997Summary of 971119 Meeting W/Westinghouse Owners Group Re Completion of WOG Topical Rept WCAP-14572,rev 1,conclusions from Results of Surry Pilot Plant Submittal & Schedule for Approving Surry Submittal & Associated WCAPBoric Acid
Weld Overlay
Coatings
VT-2
Large early release frequency
ML20129G52631 July 1996Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear PlantsChernobyl
ML20247F19924 March 1989Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl
ML20247A89716 March 1989Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams EnclReactor Vessel Water Level
ML20205H75218 October 1988Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator ProgramAnchor Darling
ML20207M0775 October 1988Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs EnclUnanalyzed Condition
Loop seal
Continuous fire watch
ML20245D84128 September 1988Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920Reactor Vessel Water Level
ML20154N4477 September 1988Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees EnclFuel cladding
ML20153B02822 June 1988Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams EnclUnanalyzed Condition
ML20237F24718 December 1987Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl
ML20235N4757 July 1987Summary of ACRS Subcommittee on Auxiliary Sys 870611 Meeting in Washington,Dc to Discuss Fire Protection Sys & Sys Interaction Effects Resulting from 861209 Feedwater Pipe Failure at Unit 2Safe Shutdown
Fire Barrier
Hydrostatic
Earthquake
Accidental discharge
Fire Protection Program
Fire Watch
ML20215C1858 June 1987Summary of 870602 Operating Reactors Events Meeting Re Briefing Senior Managers from Nrr,Res.Aeod & Regional Ofcs on Events That Occurred Since 870526 Meeting,Attendees List, Meeting Viewgraphs & Summary of Reactor Scrams EnclBoric Acid
Inattentive
ML20215C8728 June 1987Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl
ML20207P62712 January 1987Summary of Operating Reactor Events Meeting 86-46 on 861229.List of Attendees,Events Discussed & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl
ML20205K75931 December 1986Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359)Boric Acid
Chernobyl
ML20207E83229 December 1986Summary of 861215 Operating Reactor Events Meeting 86-44 W/ Ofc Director,Div Directors & Representatives Re Failure of Main Feedwater Pipe,Update of Drywell Shell Corrosion,Update on Unqualified Cable Splice & Improper Valve Positioning
ML20211P59522 December 1986Trip Rept of 861210 Feedwater Line Rupture/Augmented Insp Re 861209 EventSafe Shutdown
Scaffolding
ML20211P51722 December 1986Trip Rept of 861212 Site Visit to Review 861209 Pipe Failure.Related Info Encl
ML20215D9176 October 1986Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl
ML20154C99324 February 1986Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries EnclFire Watch
ML20138A12023 September 1985Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at FacilitiesBoric Acid
ML20133Q4175 September 1985Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance. Attendance List Encl
ML20127A7005 June 1985Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl
ML20128A90613 May 1985Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl
ML18139B96713 July 1982Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech SpecsOffsite Dose Calculation Manual
Process Control Program
Backfit
ML20126L2331 May 1981Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation
ML20196H3985 July 1978Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl
ML20245C32111 July 1977Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls
ML20196H32529 June 1976Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl
ML20040C06012 May 1976Summary of 760512 Meeting W/Nrc to Summarize Background Info on Steam Generator Tube Denting at FacilitiesFlow Induced Vibration