Issue date | Title | Topic | |
---|---|---|---|
ML20198A373 | 4 December 1997 | Summary of 971119 Meeting W/Westinghouse Owners Group Re Completion of WOG Topical Rept WCAP-14572,rev 1,conclusions from Results of Surry Pilot Plant Submittal & Schedule for Approving Surry Submittal & Associated WCAP | Boric Acid Weld Overlay Coatings VT-2 Large early release frequency |
ML20129G526 | 31 July 1996 | Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants | Chernobyl |
ML20247F199 | 24 March 1989 | Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl | |
ML20247A897 | 16 March 1989 | Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl | Reactor Vessel Water Level |
ML20205H752 | 18 October 1988 | Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program | Anchor Darling |
ML20207M077 | 5 October 1988 | Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl | Unanalyzed Condition Loop seal Continuous fire watch |
ML20245D841 | 28 September 1988 | Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 | Reactor Vessel Water Level |
ML20154N447 | 7 September 1988 | Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl | Fuel cladding |
ML20153B028 | 22 June 1988 | Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl | Unanalyzed Condition |
ML20237F247 | 18 December 1987 | Summary of Operating Reactor Events Meeting 87-44 on 871215. List of Attendees,Events Discussed,Significant Elements of Events & Summary of Reactor Scrams Encl | |
ML20235N475 | 7 July 1987 | Summary of ACRS Subcommittee on Auxiliary Sys 870611 Meeting in Washington,Dc to Discuss Fire Protection Sys & Sys Interaction Effects Resulting from 861209 Feedwater Pipe Failure at Unit 2 | Safe Shutdown Fire Barrier Hydrostatic Earthquake Accidental discharge Fire Protection Program Fire Watch |
ML20215C185 | 8 June 1987 | Summary of 870602 Operating Reactors Events Meeting Re Briefing Senior Managers from Nrr,Res.Aeod & Regional Ofcs on Events That Occurred Since 870526 Meeting,Attendees List, Meeting Viewgraphs & Summary of Reactor Scrams Encl | Boric Acid Inattentive |
ML20215C872 | 8 June 1987 | Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl | |
ML20207P627 | 12 January 1987 | Summary of Operating Reactor Events Meeting 86-46 on 861229.List of Attendees,Events Discussed & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl | |
ML20205K759 | 31 December 1986 | Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) | Boric Acid Chernobyl |
ML20207E832 | 29 December 1986 | Summary of 861215 Operating Reactor Events Meeting 86-44 W/ Ofc Director,Div Directors & Representatives Re Failure of Main Feedwater Pipe,Update of Drywell Shell Corrosion,Update on Unqualified Cable Splice & Improper Valve Positioning | |
ML20211P595 | 22 December 1986 | Trip Rept of 861210 Feedwater Line Rupture/Augmented Insp Re 861209 Event | Safe Shutdown Scaffolding |
ML20211P517 | 22 December 1986 | Trip Rept of 861212 Site Visit to Review 861209 Pipe Failure.Related Info Encl | |
ML20215D917 | 6 October 1986 | Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl | |
ML20154C993 | 24 February 1986 | Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl | Fire Watch |
ML20138A120 | 23 September 1985 | Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities | Boric Acid |
ML20133Q417 | 5 September 1985 | Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance. Attendance List Encl | |
ML20127A700 | 5 June 1985 | Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl | |
ML20128A906 | 13 May 1985 | Summary of 850507 Operating Reactors Events Meeting.List of Attendees,Events Discussed & Assignments Encl | |
ML18139B967 | 13 July 1982 | Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech Specs | Offsite Dose Calculation Manual Process Control Program Backfit |
ML20126L233 | 1 May 1981 | Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation | |
ML20196H398 | 5 July 1978 | Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl | |
ML20245C321 | 11 July 1977 | Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls | |
ML20196H325 | 29 June 1976 | Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl | |
ML20040C060 | 12 May 1976 | Summary of 760512 Meeting W/Nrc to Summarize Background Info on Steam Generator Tube Denting at Facilities | Flow Induced Vibration |