Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report5 February 2024Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)10 January 2024Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX8 January 2024Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEXPacking leak
Offsite Dose Calculation Manual
Operating Basis Earthquake
Exemption Request
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-24-0006, 10 CFR 50.54(q) Evaluation4 January 202410 CFR 50.54(q) Evaluation
RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval4 January 2024Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval
RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation14 December 2023Baffle-Former Bolt (Bfb) Subsequent Inspection Interval EvaluationFinite Element Analysis
Aging Management
Stress corrosion cracking
Affidavit
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific6 November 2023Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificSafe Shutdown
Surveillance Frequency Control Program
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2 November 2023Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear PowerSafe Shutdown
High winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Commercial Grade
Maintenance Rule Program
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals21 September 2023Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel InternalsSafe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Nondestructive Examination
Functionality Assessment
Aging Management
Stress corrosion cracking
Eddy Current Testing
License Renewal
Subsequent License Renewal
EVT-1
Power change
Power Uprate
Measurement Uncertainty Recapture
Thermal fatigue
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology30 August 2023License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break MethodologySafe Shutdown Earthquake
Stress corrosion cracking
License Renewal
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
Affidavit
Operational leakage
RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks22 August 2023Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)20 July 2023Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule12 July 2023Revision to Reactor Vessel Surveillance Capsule Withdrawal ScheduleLicense Renewal
Subsequent License Renewal
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record28 June 202310 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of RecordIncorporated by reference
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory7 June 2023Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications31 May 2023License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificationsSafe Shutdown
Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Locked High Radiation Area
Surveillance Frequency Control Program
Process Control Program
RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.231 May 2023Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations30 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR)3 May 2023Cycle 29, Revision 1, Core Operating Limits Report (COLR)Boric Acid
Shutdown Margin
RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex1 May 2023Report of Changes to Duke Energy McGuire Emergency Plan Annex
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 202226 April 2023Duke Energy Annual Radiological Environmental Operating Report - 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.4626 April 2023Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46
RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval24 April 2023Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program IntervalSafe Shutdown
Boric Acid
Mission time
Stroke time
Nondestructive Examination
Incorporated by reference
FLEX
Large early release frequency
Operability Determination
Cold shutdown justification
Maintenance Rule Program
Power Operated Valves
Grace period
Manual Operator Action
RA-23-0046, Annual Radioactive Effluent Release Report - 202224 April 2023Annual Radioactive Effluent Release Report - 2022Annual Radioactive Effluent Release Report
RA-23-0098, Annual Environmental (Nonradiological) Operating Report19 April 2023Annual Environmental (Nonradiological) Operating ReportZebra Mussel
Biofouling
RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube5 April 2023Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator TubeNondestructive Examination
RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)30 March 2023Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
RA-23-0036, Biennial Decommissioning Financial Assurance Reports30 March 2023Biennial Decommissioning Financial Assurance Reports
RA-23-0040, Onsite Property Insurance Coverage30 March 2023Onsite Property Insurance Coverage
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums30 March 202310 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations30 March 2023Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical EvaluationsBoric Acid
Affidavit
RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 224 March 2023Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2License Renewal
Subsequent License Renewal
RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report16 March 2023Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report
RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds28 February 2023Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds
RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document23 February 2023Report of Changes to McGuire EAL Technical Basis DocumentEarthquake
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors17 February 2023Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Turbine Missile
Seismic Walkdown Report
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b16 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Flooding Focused Evaluation
Earthquake
Commercial Grade
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
Manual Operator Action
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)15 February 2023End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)
RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.29 February 2023Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2Boric Acid
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Operability Determination
Earthquake
Grace period
Backfit
GOTHIC
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications7 February 2023License Amendment Request to Address Administrative Changes to the Operating License and Technical SpecificationsAnticipated operational occurrence
Incorporated by reference
Liquid penetrant