L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 26 January 2024 | Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 18 January 2024 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | |
L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 11 January 2024 | NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | Stretch Power Uprate |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-180, Submittal of Changes to the Technical Specification Bases | 13 December 2023 | Submittal of Changes to the Technical Specification Bases | Surveillance Frequency Control Program |
L-2023-174, Subsequent License Renewal Application - Third Annual Update | 13 December 2023 | Subsequent License Renewal Application - Third Annual Update | Boric Acid Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | 6 December 2023 | Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Exemption Request |
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | 16 November 2023 | Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | Exemption Request |
L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | 15 November 2023 | License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Coatings Surveillance Frequency Control Program Operability Determination Exemption Request Subsequent License Renewal Earthquake Fuel cladding Recently irradiated fuel Offsite Circuit Grace period GOTHIC Unidentified leakage Accident Tolerant Fuel Power Uprate Affidavit |
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | 11 October 2023 | License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | Surveillance Frequency Control Program Power Uprate |
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | 19 September 2023 | License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference |
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 25 August 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Hydrostatic Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action Fire Protection Program Coast down Exclusive Use Affidavit |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-104, Preparation and Scheduling of Operator Licensing Examinations | 3 August 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-103, Inservice Inspection Examination Report | 3 August 2023 | Inservice Inspection Examination Report | Moisture barrier |
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 27 July 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Earthquake Fire Protection Program |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | 28 June 2023 | Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | |
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | 27 June 2023 | 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | |
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | 9 June 2023 | Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | Boric Acid Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Coatings Functionality Assessment Condition Adverse to Quality Aging Management Exemption Request Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Grace period |
L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | 2 June 2023 | Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | 1 June 2023 | Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | Aging Management |
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 31 May 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Continuous fire watch Fire Protection Program |
L-2023-072, Preparation and Scheduling of Operator Licensing Examinations | 22 May 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | 22 May 2023 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-061, 2022 Annual Radiological Environmental Operating Report | 12 May 2023 | 2022 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 11 May 2023 | License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | |
L-2023-062, Cycle 33 Core Operating Limits Report | 27 April 2023 | Cycle 33 Core Operating Limits Report | Shutdown Margin |
L-2023-060, Radiological Emergency Plan, Revision 75 | 26 April 2023 | Radiological Emergency Plan, Revision 75 | |
L-2023-054, Submittal of Periodic Reports | 12 April 2023 | Submittal of Periodic Reports | Fuel cladding |
L-2023-058, 2022 Annual Monitoring Report | 10 April 2023 | 2022 Annual Monitoring Report | Boric Acid Grab sample Offsite Dose Calculation Manual Hydrostatic Met Tower Process Control Program Chernobyl |
L-2023-053, Core Operating Limits Report for Cycle 23 | 5 April 2023 | Core Operating Limits Report for Cycle 23 | Boric Acid Shutdown Margin |
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report | 30 March 2023 | Correction to U4R33 Steam Generator Tube Inspection Report | |
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | 28 March 2023 | Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2023-048, Core Operating Limits Report (COLR) Cycle 40 (U2C40) | 18 March 2023 | Core Operating Limits Report (COLR) Cycle 40 (U2C40) | Shutdown Margin |
L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 15 March 2023 | License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Nonconservative Technical Specifications |
L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | 15 March 2023 | Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | Non-Destructive Examination Probabilistic Risk Assessment |
L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 10 March 2023 | and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2023-023, Revised Steam Generator Tube Inspection Report | 3 March 2023 | Revised Steam Generator Tube Inspection Report | Non-Destructive Examination |