Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements26 January 2024Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)25 January 2024Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)
L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)18 January 2024Inservice Inspection Program Owner'S Activity Report (OAR-1)
L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report11 January 2024NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day ReportStretch Power Uprate
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update15 December 2023Quality Assurance Topical Report (FPL-1) Revision 30 UpdateFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-180, Submittal of Changes to the Technical Specification Bases13 December 2023Submittal of Changes to the Technical Specification BasesSurveillance Frequency Control Program
L-2023-174, Subsequent License Renewal Application - Third Annual Update13 December 2023Subsequent License Renewal Application - Third Annual UpdateBoric Acid
Fire Barrier
Coatings
Aging Management
License Renewal
Subsequent License Renewal
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report6 December 2023Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule29 November 2023Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final RuleTime of Discovery
Contraband
Exemption Request
L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule29 November 2023Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final RuleExemption Request
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule29 November 2023Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final RuleTime of Discovery
Contraband
Exemption Request
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Incorporated by reference
FLEX
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Overexposure
L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule16 November 2023Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final RuleContraband
Exemption Request
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule16 November 2023Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final RuleExemption Request
L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule16 November 2023Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final RuleContraband
Exemption Request
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles15 November 2023License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel CyclesSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Coatings
Surveillance Frequency Control Program
Operability Determination
Exemption Request
Subsequent License Renewal
Earthquake
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Grace period
GOTHIC
Unidentified leakage
Accident Tolerant Fuel
Power Uprate
Affidavit
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis11 October 2023License Amendment Request 277 Updated Spent Fuel Pool Criticality AnalysisSurveillance Frequency Control Program
Power Uprate
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program19 September 2023License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance ProgramIncorporated by reference
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project25 August 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectHydrostatic
Probabilistic Risk Assessment
Large early release frequency
Time Critical Operator Action
Fire Protection Program
Coast down
Exclusive Use
Affidavit
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update17 August 2023Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2Health Physics Network
Cyber Security
FLEX
B.5.b
Severe Accident Management Guideline
Minimum staff
Siren
L-2023-104, Preparation and Scheduling of Operator Licensing Examinations3 August 2023Preparation and Scheduling of Operator Licensing Examinations
L-2023-103, Inservice Inspection Examination Report3 August 2023Inservice Inspection Examination ReportMoisture barrier
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project27 July 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectInternal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Fire Protection Program
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections24 July 2023Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)29 June 2023Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.28 June 2023Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval27 June 202310 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-029 June 2023Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02Boric Acid
Non-Destructive Examination
Weld Overlay
Probabilistic Risk Assessment
Coatings
Functionality Assessment
Condition Adverse to Quality
Aging Management
Exemption Request
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
DM weld
Grace period
L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2 June 2023Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response1 June 2023Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 ResponseAging Management
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project31 May 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectMission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Continuous fire watch
Fire Protection Program
L-2023-072, Preparation and Scheduling of Operator Licensing Examinations22 May 2023Preparation and Scheduling of Operator Licensing Examinations
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal22 May 2023NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-061, 2022 Annual Radiological Environmental Operating Report12 May 20232022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves11 May 2023License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves
L-2023-062, Cycle 33 Core Operating Limits Report27 April 2023Cycle 33 Core Operating Limits ReportShutdown Margin
L-2023-060, Radiological Emergency Plan, Revision 7526 April 2023Radiological Emergency Plan, Revision 75
L-2023-054, Submittal of Periodic Reports12 April 2023Submittal of Periodic ReportsFuel cladding
L-2023-058, 2022 Annual Monitoring Report10 April 20232022 Annual Monitoring ReportBoric Acid
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Met Tower
Process Control Program
Chernobyl
L-2023-053, Core Operating Limits Report for Cycle 235 April 2023Core Operating Limits Report for Cycle 23Boric Acid
Shutdown Margin
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update28 March 2023Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-048, Core Operating Limits Report (COLR) Cycle 40 (U2C40)18 March 2023Core Operating Limits Report (COLR) Cycle 40 (U2C40)Shutdown Margin
L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves15 March 2023License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) CurvesAnticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Nonconservative Technical Specifications
L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-115 March 2023Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1Non-Destructive Examination
Probabilistic Risk Assessment
L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)10 March 2023and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)
L-2023-023, Revised Steam Generator Tube Inspection Report3 March 2023Revised Steam Generator Tube Inspection ReportNon-Destructive Examination