Text

Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB SEn tergy P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6710 Robert Walpole Licensing Manager NL-13-031 June 18 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

2013 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No.3 Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64

Dear Sir or Madam:

In accordance with ASME Section XI, Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and In-service Summary Report Preparation and Submission" Indian Point Nuclear Generating Unit No.3 hereby submits 2013 Form OAR-i, Owners Activity Report for Inservice Inspections. This report describes relevant conditions that required evaluation and repairs and replacements performed during the period April 2011 through April 2013.

There are no new commitments contained in this letter. If you have any questions or require additional information, please contact me at 914-254-6710.

Sincerely,'

RW/mb/jz cc: next page AU"41-

NL-13-031 Docket No. 50-286 Page 2 of 2

Enclosure:

1. 2013 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No.3 cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL IPEC NRC Resident Inspector's Office Mr. Francis J. Murray, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Department of Public Service

ENCLOSURE 1 TO NL-13-031 2013 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No.3 ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT UNIT 3 NUCLEAR POWER PLANT DOCKET No. 50-286

FORM OAR-I OWNERS ACTIVITY REPORT Report Number NL-13-031 Plant Indian Point Enerwv Center. Buchanan. New York 10511-0249 Unit No. 3 Commercial service date 08/30/1976 Refueling outage no. 3R1 7 (if applicable)

Current inspection interval 151 4th IWEIIWL 2 nd (1st, 2nd, 3rd, 4th, Other)

Current inspection period 1 St (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition, 2003 Addenda Date and revision of inspection plans: July 21, 2010 / ISI Program Plan, Rev. 1 No. SEP-ISI-IP3-001 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans 2001 Edition, 2003 Addenda_

Code Cases used: N-532-4. N-716. N-722. N-729-1, N-770 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b)the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 3R1 7 conform to the requirements of Section X1.

(refueling outage number)

Signed I Si{k CN. C ?C..Wki*,

CG.JiA Date IS/2A.%

' -'Uwner or Owner' s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by __HSB-CT of Hartford, Connecticut __have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

_____________________ Commissions ,jv2/4 '// V .

Inspector's Signature National Board, State, Province, and Endorsements Date

( /

3R17 Refueling Outage IP3 Owner Activity Report First Period ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

'Iatigoiy , ItI a ito Evaluatin ciesairtpon 2 N/A MA None, Ow"n Ind-on Point Unt3outage. 3R17. there were no items with flaws or relevant conditions that fequred evaluation for continued seivce.

5/13/2013 OAR-1

3R17 Refueling Outage IP3 Owner Activity Report First Period ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Q)."

IM tipla 00riptl" of ork 32 Central Control Room Air 3 Conditioninq Service Water Strainer Replace strainer and associated piping 8/12/11 11-3-49 3 Service Water Weld 02-010 _ Repair weld leak 3/22/13 13-3-08 1 Thimble E-1 1 Cut and cap guide tube at seal table 3/24/13 13-3-46 i

__ I __________________ I__ I 5/13/2013 OAR-1