Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217A98130 October 1999Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites
ML20212F54623 September 1999Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement
ML20211G97030 August 1999Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies
ML20210F69827 July 1999Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts
ML20209H62416 July 1999Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered Wk of 990517Boric Acid
High Radiation Area
Locked High Radiation Area
Job Performance Measure
Power change
Unidentified leakage
ML20209H79516 July 1999Forwards NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including as-given Written Exam) for Tests Administered During Week of 990517
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20212H77018 June 1999Notification of 990715 Meeting with ABB-CE to Discuss Issues Re Steam Generator Welded Sleeve Problem Identified at Unit 1
ML20206S92419 May 1999Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months
ML20210F70230 April 1999Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A
ML20205N98714 April 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11Safe Shutdown
Packing leak
High Radiation Area
Stroke time
Post Accident Monitoring
Operating Basis Earthquake
Temporary Modification
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Earthquake
Downpower
ML20137H5048 April 1999Informs That Licensee Requesting Listed Changes to Boilerplate Distribution Lists Used by NRR for Docketed Info.Add Site General Manager to Both Prairie Island & Monticello Lists
ML20204J35226 March 1999Requests That Encl Document Be Entered in NRC Pdr.Documents Consists of Composite of Attachments to NSP Ltrs, & 990308 & Should Be Linked to Both Ltr
ML20207J75619 February 1999Forwards Proposed Transmittal Ltr & Comments on Physical Protection Plan in Response to Verbal Request from Rancho Seco to Provide Addl Comments on ISFSI Physical Protection Installation
ML20203G00812 February 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06
ML20198J48021 December 1998Notification of 990107 Meeting with Util in Rockville,Md to Discuss License Amend Request to Allow Limited Inoperability of Boric Acid Storage Tank Level Channels & Transfer Logic Channels for Required Testing & MaintBoric Acid
ML20154R36919 October 1998Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils
ML20236W8134 August 1998Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72Depleted uranium
ML20236U20722 July 1998Forwards Corrected Copy of Ltr Transmitting Licensee Insp Repts 50-282/98-08 & 50-306/98-08.Date Has Been Corrected to Show Issuance on 980702
ML20217E97020 April 1998Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Mod to Plant Units 1 & 2,which Will Add Diverse RTS to Shut Down Reactor in Event of ATWS Event
ML20198G19123 December 1997Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants
ML20202F6011 December 1997Notification of 971211 Meeting W/Util in Rockville,Md to Discuss Intake Canal Seismic Issue at Plant
ML20198R49527 October 1997Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv)
ML20236N50018 October 1997Forwards Technical Specification Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests
ML20236N46714 October 1997Forwards TS Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests
ML20211M5673 October 1997Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910
ML20211A46516 September 1997Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee SitesSafe Shutdown
ML20217K80814 August 1997Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Revised Methodology Used to Calculate MSLB Containment Pressure Response in Anticipation for License Amend Request to Reduce Boron ConcentrationBoric Acid
ML20210K60813 August 1997Informs That Operator Licensing Exams Administered Wk of 970616 at Prairie Island,Units 1 & 2.Listed Info for Processing Through Nudocs & Distribution to NRC Staff, Including NRC PDR Also Encl
ML20217M03213 August 1997Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on Wk of 970616.Info Submitted for Processing Through Nudocs & Distribution to NRC Staff
ML20149D78514 July 1997Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes
ML20141F04526 June 1997Notification of 970709 Meeting W/Nsp in Rockville,Maryland to Discuss ATWS Protection at PINGP & Possible Installation of Diverse Scram Sys
ML20147J26416 April 1997Responds to 961126 Request Re Task Interface Agreement 96-0440, Defining Dry Cask Storage Terms. Basic Reasons to Return Cask to SFP & Unload Sf Assemblies Are Either to Retrive or Dispose or Respond to Event or ConditionFuel cladding
ML20137C92020 March 1997Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated EnforcementUnanalyzed Condition
ML20136D5317 March 1997Notification of 970312 Meeting W/Util in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases
ML20134P59321 February 1997Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl
ML20134N58519 February 1997Notification of 970224 Meeting W/Northern States Power in Rockville,Md to Discuss Issues Pertaining to Prairie Island Amend of Cooling Water Sys Emergency Intake Design Bases
ML20134J93310 February 1997Notification of 970213 Meeting W/Util in Rockville,Md to Discuss Results from Recent SG Insps Performed on Facility
ML20138J7675 February 1997Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register PersonnelGeneric Fundamentals Examination
ML20134C28229 January 1997Notification of 970206 Meeting W/Nsp in Rockville,Md to Discuss ISI at Prairie Island & Adoption of ASME Code Case N-521
ML20132F54219 December 1996Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11Coast down
ML20135C37925 November 1996Informs That Commission Provided Guidance to Staff to Ensure That Rights of Sovereign Tribal Govts Fully Respected & to Operate within govt-to-govt Relationship w/federally- Recognized Native American Tribal Govts
ML20134E91929 October 1996Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps
ML20236X00112 September 1996Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility
ML20203B98920 November 1995Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This MemoFire Watch
ML20211M62330 November 1994Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM
ML20236L56310 August 1994Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode
NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl29 June 1994Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl
ML20056E51412 August 1993Submits SALP Schedule for FY94 Per Mgt Directive 8.6
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant