NPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability19 October 1999Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability
NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs8 October 1999Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRsMaintenance Rule Program
NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request8 October 1999Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request
NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included5 October 1999Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,includedIncorporated by reference
Maintenance Rule Program
NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval4 October 1999Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval
NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910224 October 1999Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022Minimum Critical Power Ratio
05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics30 September 1999Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in ItalicsSafe Shutdown
NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel29 September 1999Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel
NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)20 September 1999Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)
NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 200315 September 1999Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003
NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H15 September 1999Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H
NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC10 September 1999Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAECProbabilistic Risk Assessment
Incorporated by reference
Exemption Request
NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations9 September 1999Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations
NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity8 September 1999Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity
05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump2 September 1999Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer PumpSafe Shutdown
NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1 September 1999Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible
ML20211M58131 August 1999Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld
NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)31 August 1999Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)
NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-063030 August 1999Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630Fitness for Duty
NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months27 August 1999Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months
05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics19 August 1999Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in ItalicsSafe Shutdown
NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions18 August 1999Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions
NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached16 August 1999Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info AttachedLiquid penetrant
NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 199916 August 1999Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999Half scram
Stroke time
Time to boil
Squib
Locked High Radiation Area
B.5.b
Double blade guide
Job Performance Measure
Operability Determination
NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 199913 August 1999Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999
NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906302 August 1999Forwards fitness-for-duty Performance Data for six-month Period Ending 990630
NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal29 July 1999Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal
NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable28 July 1999Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable
NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)21 July 1999Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)
NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates16 July 1999Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates
NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-200315 July 1999Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003
NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.79013 July 1999Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790
NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications12 July 1999Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications
NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-028 July 1999Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02
NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 27 July 1999Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2
NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041 July 1999Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04
NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl30 June 1999Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl
NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 199929 June 1999Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999
NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided28 June 1999Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided
NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl25 June 1999Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant EnclBackfit
NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests23 June 1999Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests
NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions23 June 1999Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions
ML20196F95321 June 1999Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld
05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics11 June 1999Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics
NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-623010 June 1999Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230
NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld4 June 1999Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld
NG-99-0468, Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center3 June 1999Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center
05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs28 May 1999Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech SpecsEmergency Lighting
NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 228 May 1999Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2
NG-99-0625, Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b)24 May 1999Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b)