Issue date | Title | Topic | |
---|---|---|---|
PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl | 14 October 1999 | Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl | |
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect | 13 October 1999 | Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect | |
ML20212G581 | 23 September 1999 | Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 | |
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams | 21 September 1999 | Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams | Generic Fundamentals Examination |
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions | 16 September 1999 | Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions | |
ML20212D015 | 14 September 1999 | Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED | |
PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages | 9 September 1999 | Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages | |
PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 | 26 August 1999 | Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 | |
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl | 19 August 1999 | Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl | Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination |
ML20210S396 | 11 August 1999 | Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered | Generic Fundamentals Examination |
PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 | 10 August 1999 | Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 | Fitness for Duty |
PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 | 10 August 1999 | Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 | |
PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready | 10 August 1999 | Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready | |
PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 | 2 August 1999 | Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 | |
PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld | 21 July 1999 | Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld | |
PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates | 19 July 1999 | Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates | |
ML20210A644 | 15 July 1999 | Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses | |
ML20211A388 | 30 June 1999 | Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions | |
PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant | 29 June 1999 | Submits Response to RAI Re GL 96-05 Program at Plant | Stroke time Probabilistic Risk Assessment Anchor Darling |
PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant | 29 June 1999 | Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant | |
PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 | 29 June 1999 | Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 | |
ML20211A399 | 28 June 1999 | Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions | |
PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 | 28 June 1999 | Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 | |
ML20196A660 | 16 June 1999 | Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 | |
PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt | 14 June 1999 | Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt | Severe Accident Management Guideline |
ML20212H584 | 10 June 1999 | Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP | |
PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval | 10 June 1999 | Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval | |
ML20195H905 | 10 June 1999 | Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 | |
PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records | 9 June 1999 | Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records | |
PY-CEI-NRR-2404, Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology | 7 June 1999 | Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology | |
ML20195E456 | 25 May 1999 | Submits Petition Per Other Actions Provision of 10CFR2.206,requesting That Radiation Protection Manager at Perry NPP Be Banned by NRC from Participation in Licensed Activities at & for Any NPP for at Least Five Yrs | Fitness for Duty |
PY-CEI-NRR-2401, Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars | 20 May 1999 | Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars | |
PY-CEI-NRR-2402, Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, | 18 May 1999 | Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, | |
PY-CEI-NRR-2394, Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested | 5 May 1999 | Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested | |
PY-CEI-NRR-2397, Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.5 | 30 April 1999 | Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.5 | |
PY-CEI-NRR-2396, Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-en | 28 April 1999 | Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-end Weld | Weld Overlay Finite Element Analysis Liquid penetrant |
05000440/LER-1999-002, Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available | 26 April 1999 | Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available | |
PY-CEI-NRR-2388, Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits | 22 April 1999 | Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits | Offsite Dose Calculation Manual |
PY-CEI-NRR-2371, Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted | 21 April 1999 | Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted | Fire impairment Foreign Material Exclusion Fire Protection Program Scaffolding |
PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl | 21 April 1999 | Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl | |
PY-CEI-NRR-2392, Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette | 19 April 1999 | Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette | |
PY-CEI-NRR-2387, Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105 | 14 April 1999 | Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105 | |
PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing | 6 April 1999 | Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing | |
ML20206N336 | 5 April 1999 | Informs NRR of Continued Events Re Transfer of Generation Assets Between Duquesne Light Co & Firstenergy.No Negotiated Settlement Between Firstenergy & Local 270 Pertaining to Generation Asset Swap Has Been Reached | Scaffolding |
PY-CEI-NRR-2383, Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed | 1 April 1999 | Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed | Coatings VT-2 |
PY-CEI-NRR-2384, Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC | 1 April 1999 | Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC | Weld Overlay |
L-99-052, Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding | 30 March 1999 | Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding | |
PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) | 29 March 1999 | Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) | |
ML20205H617 | 29 March 1999 | Forwards Util Consolidated Financial Statements for Twelve Month Period Ending 981231 & Internal Cash Flow Projection, Including Actual 1998 Data & Projections for 1999 | Incorporated by reference |
PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure | 25 March 1999 | Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure | Non-Destructive Examination Weld Overlay Liquid penetrant Dissimilar Metal Weld |