Issue date | Title | Topic | |
---|---|---|---|
ML20217L949 | 21 October 1999 | Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 | |
ML20217K854 | 21 October 1999 | Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 | |
ML20217K357 | 21 October 1999 | Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette | Coatings |
ML20217E322 | 13 October 1999 | Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 | |
ML20217E767 | 12 October 1999 | Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 | |
ML20216H874 | 29 September 1999 | Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements | |
ML20216H854 | 29 September 1999 | Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 | |
ML20212H446 | 28 September 1999 | Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time Probabilistic Risk Assessment Large early release frequency |
ML20212G561 | 24 September 1999 | Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO | |
05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments | 23 September 1999 | Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments | |
ML20212A406 | 14 September 1999 | Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 | |
ML20216E603 | 10 September 1999 | Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 | Generic Fundamentals Examination |
05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 | 31 August 1999 | Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 | |
ML20210V427 | 16 August 1999 | Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld | |
ML20210R668 | 13 August 1999 | Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal | |
ML20210Q645 | 12 August 1999 | Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units | |
ML20210P571 | 11 August 1999 | Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 | |
ML20210P468 | 11 August 1999 | Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met | |
ML20210P622 | 10 August 1999 | Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal | |
ML20210N505 | 9 August 1999 | Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) | |
05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl | 6 August 1999 | Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl | |
ML20210L231 | 5 August 1999 | Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage | |
ML20216D967 | 29 July 1999 | Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl | Large early release frequency Maintenance Rule Program |
ML20210C182 | 22 July 1999 | Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment | |
ML20210B245 | 21 July 1999 | Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 | Pressure Boundary Leakage |
ML20210N288 | 19 July 1999 | Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld | |
ML20209J524 | 19 July 1999 | Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl | Exemption Request |
ML20210A291 | 19 July 1999 | Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan | |
ML20209G342 | 15 July 1999 | Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp | |
ML20209C157 | 2 July 1999 | Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions | Finite Element Analysis Design basis earthquake |
ML20210N987 | 1 July 1999 | Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts | |
ML20209B357 | 28 June 1999 | Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl | |
ML20209B483 | 25 June 1999 | Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed | Coatings |
ML18107A701 | 25 June 1999 | Requests Rev of NRC Records to Reflect Change of PG&E Address | |
ML20196A980 | 17 June 1999 | Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl | Boric Acid Stroke time Past operability Probabilistic Risk Assessment |
ML20195G809 | 14 June 1999 | Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition | |
ML20195K420 | 11 June 1999 | Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other | |
ML20195H156 | 10 June 1999 | Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 | |
ML20195E498 | 8 June 1999 | Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints | |
ML20196L319 | 24 May 1999 | Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 | |
ML20207A383 | 24 May 1999 | Responds to NRC 990326 RAI on DG Srs.Proposed to Add Listed Sentence to TS Bases for SRs 3.8.1.7,3.8.1.12 & 3.8.1.15,as Result of Discussion with NRC During 990427 Telcon | |
ML20211K426 | 18 May 1999 | FOIA Request for Documents Re San Onofre OI Repts 4-98-041, 4-98-043 & 4-98-045 | |
ML20206S716 | 17 May 1999 | Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3 | |
ML20206N471 | 13 May 1999 | Provides Info Requested by NRC Re Reduced Pressurizer Water Vol Change Amends Application 172 & 158 for Songs,Units 2 & 3,respectively.Proposed Change Will Reduce Pressurizer Water Level Required for Operability | Boric Acid |
ML20206M779 | 13 May 1999 | Informs NRC of Changes Being Made to Emergency Response Data Sys (ERDS) at SONGS Unit 3.Revised Page to ERDS Data Point Library Is Provided in Encl | |
ML20206K689 | 11 May 1999 | Forwards Approved Amends to NPDES Permits CA0108073,Order 94-49 & CA0108181,Order 94-50 & State Water Resources Board Resolution | |
ML20206M068 | 10 May 1999 | Submits Correction to Info Contained in Licensee to NRC Re Proposed TS Change Number NPF-10/15-475.Stated Info Was Incorrect in That Overtime Provisions Were Not Contained in TR at Time of Was Submitted | |
ML20206H045 | 4 May 1999 | Forwards Annual Financial Repts for Listed Licensees of Songs,Units 1,2 & 3.Each Rept Includes Appropriate Certified Financial Statement Required by 10CFR50.71(b) | |
ML20206H193 | 3 May 1999 | Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl | Incorporated by reference |
ML20206E585 | 29 April 1999 | Forwards Annual Radioactive Effluent Release Rept for 1998 for SONGS Units 1,2 & 3. Also Encl Are Rev 13 to Unit 1 ODCM & Rev 31 to Units 2 & 3 Odcm | Annual Radioactive Effluent Release Report |