Issue date | Title | Topic | |
---|---|---|---|
ML18039A902 | 15 October 1999 | Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event | |
ML18039A896 | 14 October 1999 | Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event | |
ML18039A888 | 8 October 1999 | Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML18039A893 | 8 October 1999 | Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr | |
ML20217E018 | 6 October 1999 | Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections | |
ML20217B548 | 1 October 1999 | Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR | |
05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts | 30 September 1999 | Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts | |
ML20216J759 | 30 September 1999 | Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready | |
ML20216K142 | 29 September 1999 | Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 | |
ML20217D166 | 27 September 1999 | Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld | |
ML20212F775 | 22 September 1999 | Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses | |
ML20212E197 | 16 September 1999 | Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions | |
ML20212B557 | 10 September 1999 | Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V | Offsite Dose Calculation Manual |
ML18039A872 | 10 September 1999 | Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks | |
ML20211Q573 | 9 September 1999 | Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl | Generic Fundamentals Examination |
ML20211N294 | 3 September 1999 | Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations | |
ML20211J677 | 30 August 1999 | Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 | |
ML20211K239 | 23 August 1999 | Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj | Fitness for Duty |
ML20211B901 | 18 August 1999 | Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure | Reactor Vessel Water Level Fuel cladding |
ML20210Q693 | 9 August 1999 | Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants | |
ML18039A837 | 6 August 1999 | Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept | Grab sample Hydrostatic |
ML18039A818 | 26 July 1999 | Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) | |
ML20210F303 | 22 July 1999 | Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 | |
ML20210D280 | 22 July 1999 | Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 | Enforcement Discretion Exemption Request |
ML20209H500 | 14 July 1999 | Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively | |
ML20210U441 | 12 July 1999 | Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant | |
ML20209G145 | 9 July 1999 | Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 | Safe Shutdown Health Physics Network Emergency Lighting Earthquake Fire Protection Program Inadvertent Siren Activation Siren |
ML20209E082 | 7 July 1999 | Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months | |
ML20209B750 | 1 July 1999 | Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl | |
ML18039A808 | 28 June 1999 | Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF | |
ML18039A811 | 25 June 1999 | Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 | |
ML20196G136 | 23 June 1999 | Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete | |
ML20196E642 | 22 June 1999 | Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages | |
ML20196F813 | 22 June 1999 | Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld | |
ML18039A805 | 22 June 1999 | Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept | |
ML18039A803 | 18 June 1999 | Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days | |
ML20195D055 | 3 June 1999 | Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl | |
ML20195D332 | 1 June 1999 | Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 | |
ML18039A793 | 1 June 1999 | Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage | |
ML20195C551 | 25 May 1999 | Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal | Scram Discharge Volume |
ML20195B936 | 24 May 1999 | Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License | |
ML18039A789 | 24 May 1999 | Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 | |
ML18039A791 | 24 May 1999 | Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training | |
ML20206U655 | 14 May 1999 | Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 | |
ML20206N771 | 11 May 1999 | Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 | Safe Shutdown Health Physics Network High Radiation Area Emergency Lighting Earthquake Fire Protection Program Inadvertent Siren Activation Siren |
ML20206Q842 | 10 May 1999 | Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) | |
ML18039A777 | 6 May 1999 | Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments | |
ML18039A774 | 30 April 1999 | Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval | |
ML20206H590 | 30 April 1999 | Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 | Met Tower |
ML20206H944 | 28 April 1999 | Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 |