Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20210Q7172 August 1999Provides Rept of Violation of Surveillance TS TS4.2.4, Reactor Instrumentation Sys. Calorimetric Calibr of Reactor Power Instrument Channels Was Not Done in Necessary Annual Period.No Immediate Corrective Actions Necessary
ML20206K7276 May 1999Informs That MG Krause Will Be Reactor Supervisor & Assume Daily Supervisory Duties Previously Performed by T Bauer. T Bauer Will Continue as Assistant Director Concentrating Efforts on Extended Time Activities
ML20206B10721 April 1999Informs That Activities at Nuclear Engineering Teaching Lab, Continuing to Improve.Nuclear & Radiation Engineering Program Continues to Have Support from All Levels of Univ Administration - Dept,College & Institutional
ML20248F46622 May 1998Notifies NRC That Licensee Intend to Reconstitute Committee Immediately,Rather than Wait Until Next Academic Yr
ML20217M22028 April 1998Forwards Replacement Page 3-13 to Univ of Tx 1997 Annual Rept.Corrections to Page Consists of Several Transcription Errors Incorrectly Categorizing Several of Tabulated Doses
ML20113A1026 June 1996Notifies of Change of Name of Balcones Research Ctr to Pickle Research Campus & Addition of Two Annotations for Interlock Requirements of TS W/Rcs Interlocks,Section 3.2.2, Per Conversation W/Nrc.Amended TS Pages 14 & 24 Encl
ML20107K52516 April 1996Forwards Response to NRC 960325 Rai,Supplementing Response Made on 951111 & Original Amend Request to Correct Lanquage in Ts.Affected TS Page Also Encl
ML20094G54011 November 1995Submits Response to Request for Addl Info Re NRC Ltr & Original Amend Requested .No Change to Reactor Operating Conditions Being ProposedPower change
ML20085M43621 June 1995Submits Info Re Control of Access to Radiation in BeamsBoric Acid
High Radiation Area
ML20084A96724 May 1995Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/95-01.Corrective Actions:Review of Reactor Committee Minutes Was Done by Facility Director for Period 1/92 to 4/95
ML20056H43321 July 1993Forwards Final Rept of Confirmatory Survey of Univ of Texas Triga Reactor.Informs That Minor Rev Made to Draft Rept Issued in June 1993 to Reflect Comments Communicated by Telephone
ML20056C3164 May 1993Forwards Proprietary Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/93-01 on 930317-18.Encl Withheld,Per 10CFR2.790
ML20095L81815 April 1992Advises That Assembly Error Made at Triga Fabrication Facility in That Two Wires on Potentiometer on CRD Mechanisms Reversed,Per 920311 Telcon
ML20091Q39823 January 1992Forwards Executed Amendment to Indemnity Agreement E-25 & 14
ML20085D1824 October 1991Forwards Univ SAR Amend Pages for Rev 1.01 Dtd May 1991
ML20083D36924 September 1991Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75
ML20073R01324 May 1991Requests Extension of CP CPRR-123 for Four Addl Months to Provide Time for Review of NRC Questions.Current Expiration 910630.Final Response & Amended SAR Being Sent by Separate Ltr
ML20073R10624 May 1991Forwards Rev 1.01 to Sar,Response to NRC Questions,Per 910222 Request for Addl Info & List of Matl Subj to License Request
ML20073E68915 April 1991Forwards Rev 1 to PLAN-O, Call & Notification & PLAN-E, Emergency Response, QA Plan & Pages 12,20 & 21 of Emergency Response Plan
ML20066J31412 February 1991Forwards Rev 1 to Tech Specs.Changes Made by Discussion & Concurrence W/Nrc
ML20066E26411 January 1991Forwards Rev 1 to Emergency Response Plan. Annotated Copy Also Encl to Assist Review Process Due to Editorial Changes Made to Reword Sentences
ML20065Q32311 December 1990Informs That Extension Date Incorrectly Stated as 900630 in .Correct Extension Date Should Read 910630
ML20065S13921 November 1990Forwards Rev 0 to QA Plan
ML20065D00710 September 1990Responds to Violations Noted in Insp Rept 50-192/90-01 on 900806.Corrective Actions:Personnel Access to Area Limited to Personnel W/Direct Knowledge of Status of Facility & Routine Work W/Radioactive Matl Removed from Area
ML20056B25413 August 1990Forwards Rev 1 to Physical Security Plan.Encl Withheld
ML20055D04018 June 1990Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete
ML20043G6346 June 1990Forwards Physical Security Plan.Plan Withheld
ML20006E2989 February 1990Forwards J Cox 891218 Ltr for Consideration & Compliance,If Possible
ML20245G81819 June 1989Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl
ML20245J58524 April 1989Forwards Addendum to 1988 Annual Rept
ML20236C4468 March 1989Responds to NRC Re 880801 Application for Amend to License R-92.Licensee Does Not Plan to Complete Postponed Surveillances to Make Facility Operable Prior to Movement of Fuel
ML20206E52617 October 1988Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co
ML20206F06613 September 1988Forwards Info to Suppl 880801 Amend Request for Change to License R-92 Tech Specs
ML20150F31822 April 1988Responds to NRC Re Violations Noted in Insp Rept on 880324.Corrective Actions:Immediate Check of Review Dates on All Procedures & List Made of All Mods of Any TypeShutdown Margin
ML20236Q9576 November 1987Advises That NETL Project Progress Continues W/Projected Completion Date of 880610.Present Figures Indicate 46% Completion by mid-Oct.Key Items & Date Estimates Listed
ML20212E34520 February 1987Advises of Correction to Project Completion Date Noted in .Completion Date in Sentence Two Corrected to June 1988
ML20211B3196 February 1987Informs That Bids for Docket 50-602 Project Opened on 861021 W/Award of General Contract on 861204.Dismantling Activities of Docket 50-192 License Projected to Commense in Aug or Sept 1988.Submits Info to Suppl 850503 Decommissioning Plan
ML20207N0358 December 1986Forwards Notice of 861215 Preconstruction Conference in Austin,Tx to Discuss Const Schedule Available from Cit,Inc of Texas.Set of Plans & Specs Should Be Sent by 851208 from Ws Martin
ML20203C09110 July 1986Informs That Bid Advertisement for Completion of Docket 50-602 & Dismantling of Docket 50-192 Scheduled for 860817 W/Bid Openings Planned for 860916
ML20199J91426 March 1986Forwards 1985 Annual Rept of Univ of Texas at Austin, Nuclear Engineering Teaching LabFinite Element Analysis
ML20137X1882 December 1985Forwards Response to 850503 & 0809 Requests for Info Re Dismantling & Decommissioning Plan
ML20133G8499 October 1985Forwards Revised Tech Specs for License Submittal.Revs Include Changes in Form,Per NRC Request
ML20133H14714 August 1985Forwards Revised Security Plan,Per 850313 & 29 Telcons. Plan Withheld (Ref 10CFR73.21 & 2.790)
ML20134E34314 August 1985Forwards Revised Tech Specs to Suppl 841109 License Application.Revs Include Most Recent Info Available & Changes Per Telcons W/Nrc
ML20128N6699 July 1985Requests Univ of Texas 841109 Application for CP & OL & Environ Assessment
ML20132D2421 July 1985Requests Application for CP Operating Permit & Environ Assessment for Research Reactor Be Forwarded to Author at Listed Address
ML20117P17414 May 1985Advises That Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc
ML20117C0703 May 1985Forwards Decommissioning Plan for Univ of Texas Triga Reactor. Project Schedule Estimates Completion in mid- to Late 1987.Implementation of Plan Not Anticipated Until Jul 1987 or Shortly After
ML20116N7893 May 1985Forwards Amended Application for Cp,Relocating Site 130 Meters from Original Location
ML20116D47622 April 1985Forwards Revised Tech Specs,Incorporating Changes in Response to Discussions During 850122 Site Visit & Telcons W/Nrc