Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
2CAN012401, U.S. Additional Protocol | 17 January 2024 | U.S. Additional Protocol | |
ML23107A055 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 2, Tables | |
ML23107A052 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 3, Tables | |
ML23107A051 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 6, Tables | |
ML23107A037 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 14, Tables | |
ML23107A032 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 4, Tables | Hydrostatic Fuel cladding |
ML23107A016 | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 5, Tables | Safe Shutdown Boric Acid Earthquake |
ML22259A122 | 8 September 2022 | ANO Service Water KM Version | Ultimate heat sink VT-2 Aging Management |
ML22224A243 | 19 August 2022 | Regulatory Conference Participant List July 29 2022 (No Numbers) (Enc 1) | |
ML21354A755 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 | FLEX Coronavirus |
RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report | 12 November 2021 | Additional Information for the 2019 Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
ML21125A336 | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 15, Figures | |
ML21125A335 | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 12, Figures | |
ML21125A338 | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 14, Tables | Shutdown Margin Loop seal Coatings |
IR 05000416/2020004 | 3 February 2021 | Integrated Inspection Report 05000416/2020004 | Offsite Dose Calculation Manual Enforcement Discretion Met Tower Functionality Assessment Condition Adverse to Quality Annual Radiological Environmental Operating Report Process Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Scaffolding Unidentified leakage |
IR 05000382/2020012 | 2 February 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000382/2020012 | Safe Shutdown High Radiation Area Ultimate heat sink Internal Flooding Significance Determination Process Job Performance Measure Large early release frequency Operability Determination Time Critical Operator Action Maintenance Rule Program Coronavirus COVID-19 |
ML18354A427 | 20 December 2018 | Superseded by Table Received with Mail 15 | |
ML18261A214 | 22 October 2018 | Response to Comments on the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 | License Renewal |
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table | 19 March 2018 | Submittal of Joint Plant Access Shared Information Table | |
ML17226A097 | 28 July 2017 | Revision 25 to the Updated Safety Analysis Report, Chapter 1, Tables 1.3-1 Through 1.8-1 | Safe Shutdown Safe Shutdown Earthquake Coatings Earthquake Turbine Missile Pressure Boundary Leakage Offsite Circuit Fire Protection Program |
ML17150A256 | 5 June 2017 | Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) | |
ML16287A443 | 18 October 2016 | Correction to Amendment No. 197, Request for Changing Certain TS SRs Frequency from 18 Months to 24 Months | |
ML16090A327 | 12 April 2016 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
PNP 2015-042, One-Year Status Notification in Response to Confirmatory Order, EA-14-013 | 19 June 2015 | One-Year Status Notification in Response to Confirmatory Order, EA-14-013 | Grace period |
GNRO-2015/00031, Response to Request for Additional Information Regarding Fluence License Amendment Request | 8 May 2015 | Response to Request for Additional Information Regarding Fluence License Amendment Request | MELLLA |
ML15016A091 | 16 January 2015 | U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Palisades Nuclear Plant (Pnp) Fire PRA (Fpra) Facts and Observations (F&Os | Safe Shutdown Fire Barrier |
ML15016A073 | 16 January 2015 | U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Palisades Nuclear Plant (Pnp) Internal Events PRA (Iepra) Facts and Observations (F&Os) | |
2CAN011502, Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections | 12 January 2015 | Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections | |
ML14307B707 | 10 December 2014 | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T | Probabilistic Risk Assessment Fukushima Dai-Ichi |
GNRO-2014/00010, Draft Plant-Specific Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants | 5 February 2014 | Draft Plant-Specific Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants | Annual Radiological Environmental Operating Report |
RBG-47409, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements | 21 November 2013 | Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements | Fukushima Dai-Ichi |
ML13133A138 | 10 May 2013 | One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube Plugging and Proximity Calls | |
ML13133A136 | 10 May 2013 | One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube to Plug and Proximity Calls | |
GNRO-2012/00107, Vibration Data Report and Commitment Change | 6 September 2012 | Vibration Data Report and Commitment Change | |
ML12241A296 | 28 August 2012 | RAI for the Request to Use of Alternate ASME Code Case N-770-1 Baseline Examination, Request for Alternative ANO2-ISI-007 | Dissimilar Metal Weld |
ML12157A256 | 23 May 2012 | Attachment 32 to GNRO-2012/00039 - Er Reference - MDEQ 2009a, Records of Public-Supply Wells in Mississippi, 2009 | |
ML12157A257 | 23 May 2012 | Attachment 13 to GNRO-2012/00039 - Er Reference - Mdeq. 2010a. Mississippi Dept. of Environmental Quality, Office of Land and Water Resources, Water Well Drillers, Radial-Search, Wells. E-mail Correspondence from Tommie Whitten Mdeq. Septem | |
ML121450014 | 23 May 2012 | NFPA 805 LAR Status Matrix - May 2012 | |
ML11362A439 | 19 January 2012 | Enclosure 3: for Scoping Ltrs Table of Listed Species for Fws Letter | |
ML110470452 | 15 February 2011 | Response to Request for Additional Information (RAI) - Cyber Security Plan | Cyber Security |
W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition | 12 August 2010 | Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition | |
ML101900418 | 28 June 2010 | Quick View Chart | Safe Shutdown Ultimate heat sink Annual Radiological Environmental Operating Report |
ML101890111 | 25 June 2010 | 2010-06-DRAFT-Written Exam Comments | |
0CAN061001, Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes | 3 June 2010 | Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes | |
ML093431318 | 1 December 2009 | Updated Decommissioning Shortfalls as of December 1, 2009 | |
ML101540478 | 3 November 2009 | Phased Array Ultrasonic Examination Record | |
2CAN070807, Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests | 31 July 2008 | Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests | Hydrostatic Scaffolding |
1CAN070801, Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration | 30 July 2008 | Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration | Boric Acid |
ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses | 28 July 2008 | Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses |