|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML23107A0162023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Tables ML23107A0322023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Tables ML23107A0372023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Tables ML23107A0512023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Tables ML23107A0522023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Tables ML23107A0552023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables ML21354A7552021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 ML21125A3352021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 12, Figures ML21125A3362021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 15, Figures ML21125A3382021-04-14014 April 2021 5 to Updated Final Safety Analysis Report, Chapter 14, Tables ML18354A4272018-12-20020 December 2018 Superseded by Table Received with Mail 15 CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports PNP 2015-042, One-Year Status Notification in Response to Confirmatory Order, EA-14-0132015-06-19019 June 2015 One-Year Status Notification in Response to Confirmatory Order, EA-14-013 ML15016A0912015-01-16016 January 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Palisades Nuclear Plant (Pnp) Fire PRA (Fpra) Facts and Observations (F&Os ML15016A0732015-01-16016 January 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Palisades Nuclear Plant (Pnp) Internal Events PRA (Iepra) Facts and Observations (F&Os) ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1104704522011-02-15015 February 2011 Response to Request for Additional Information (RAI) - Cyber Security Plan ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ML0806302532008-02-27027 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-Water Reactors ENOC-07-00036, Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses2007-10-31031 October 2007 Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0733310832007-09-21021 September 2007 SG Tube Inspection Discussion During 2007 Palisades Outage ML0530705612005-10-31031 October 2005 Supplementary Information for the Application for Renewal of the Palisades Plant Operating License ML0520002372005-06-0707 June 2005 Precedents for Section 3.2 Exceptions to GALL ML0520002342005-06-0606 June 2005 Precedents for Section 3.1 Exceptions to GALL ML0520002412005-04-16016 April 2005 Precedents for Section 3.3 Exceptions to GALL ML0520004402005-04-0101 April 2005 Precedents for Section 3.5 Exceptions to GALL ML0520004542005-04-0101 April 2005 Precedents for Section 3.6 Exceptions to GALL ML0513800992005-03-31031 March 2005 Precedent Table, Mech Section 3.4 ML0513800922005-03-31031 March 2005 Precedent Table, Civil Section 3.5 ML0513800952005-03-31031 March 2005 Precedent Table, Mech Section 3.2 ML0513800982005-03-31031 March 2005 Precedent Table, Mech Section 3.3 ML0513800942005-03-31031 March 2005 Precedent Table, Mech Section 3.1 ML0513800862005-03-31031 March 2005 Precedent Table, Elec. Section 3.6 ML0520002302005-03-0202 March 2005 Exceptions to GALL Program Elements ML0434501802003-12-11011 December 2003 NMC Program Health Status Fleet Program at a Glance ML18347B2911994-04-13013 April 1994 Notification of Submittal of Request for Renewal of the National Pollutant Discharge Elimination System (NPDES) Permit ML18347B2891991-06-0101 June 1991 Semiannual Radioactive Effluent Release Report ML18344A2461984-05-14014 May 1984 a Steam Generator General Listing of 4C4 ML18346A2461978-08-0808 August 1978 Furnishing Information Re Combustion Engineering Owners' Group Proposed Plan to Resolve the Asymmetric LOCA Loads Issue ML18348A7361978-05-23023 May 1978 Letter Results of Burnup Study ML18346A2441978-04-0505 April 1978 Revision of Steam Generator Tube Dent Data ML18348A7561977-02-14014 February 1977 Primary System Pressure Increase to 2, 100 Psia ML18347A5441976-11-0909 November 1976 Submits Revised Table 6 of Special Report No. 9, Palisades Cycle II Start-Up Report August 27, 1976, Which Makes Provision for Measurement Uncertainty Allowance of 10% of Net Rod Worth ML18347A5581976-09-27027 September 1976 Referring to Meeting of 7/30/1976 Regarding Appendix J Which Requires Air Locks Be Tested After Each Opening, Letter Providing Information for NRC Consideration to CPC Exemption Request ML18347A6711976-04-23023 April 1976 Referring to 4/5/1976 Report, Rod Bow Measurements and Analysis of Effects on DNB, Providing Additional Data from Core I ML18347A6801976-04-0505 April 1976 Information Submitted in Addition to That Provided in Consumers Power Company Submittals of March 26, 1976 and April 5, 1976 2023-03-31
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23107A0262023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23107A0552023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables ML23107A0202023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Figures ML23107A0502023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23107A0542023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, References ML23107A0462023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Appendices ML23107A0402023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23107A0592023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Tables ML23107A0472023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations ML23107A0572023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Figures ML23107A0352023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, References ML23107A0342023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, References ML23107A0382023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23107A0302023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Tables ML23107A0132023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Design of Structures, Systems, and Components ML23107A0452023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, References ML23107A0312023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23107A0422023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Tables ML23107A0562023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Primary Coolant System ML23107A0192023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Tables ML23107A0232023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Figures ML23107A0152023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems ML23107A0122023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Figures ML23107A0292023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Figures ML23107A0162023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Tables ML23107A0272023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23107A0252023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management and Radiation Protection ML23107A0612023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Plant ML23107A0282023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, List of Effective Pages ML23107A0242023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Figures ML23107A0392023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Quality Assurance Program ML23107A0482023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, References ML23107A0172023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Tables ML23107A0492023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, References ML23107A0322023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Tables ML23107A0332023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Table of Contents ML23107A0582023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Figures ML23107A0182023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Figures PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23107A0142023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Figures ML23107A0412023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Figures ML23107A0522023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Tables ML23107A0532023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23107A0432023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, References ML23107A0602023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23107A0362023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23107A0372023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Tables ML23107A0512023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Tables ML23107A0212023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23107A0222023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Figures 2023-03-31
[Table view] |
Text
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-1 Revision 36 Page 1 of 1 SAFETY INJECTION AND REFUELING WATER TANK DESIGN PARMETERS Nominal Volume 285,000 Gallons Diameter/Height 46 Feet/24 Feet Material Aluminum Design Temperature 125°F Design Pressure Atmospheric
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-2 Revision 36 Page 1 of 1 LOW PRESSURE SAFETY INJECTION PUMP DATA
SUMMARY
Quantity 2 Type Single Stage, Horizontal, Centrifugal Design Pressure 500 psig Design Temperature 350°F Design Flow Rate 3,000 gpm Design Head 350 ft Shutoff Head 410 ft Basic Material 316 SS (see Table 6-10)
Horsepower 400 Seals Mechanical Acceleration Time 4 Seconds Minimum Flow 163 gpm NPSH Required at 3,000 gpm 11 ft
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-3 Revision 36 Page 1 of 1 HIGH PRESSURE SAFETY INJECTION PUMP DATA
SUMMARY
Quantity 2 Type Multistage, Horizontal, Centrifugal Design Pressure 1,750 psig Design Temperature 350°F Design Flow Rate 300 gpm Design Head 2,500 ft Shutoff Head 2,800 ft Material Stainless Steel Horsepower 400 Shaft Seal Mechanical Acceleration Time 4 Seconds Minimum Recirc Flow 25 gpm NPSH Required at 600 gpm 17 ft
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-4 Revision 36 Page 1 of 1 SHUTDOWN COOLING HEAT EXCHANGER DATA
SUMMARY
Quantity 2 Type Shell and Tube Code ASME,Section III, Class C, 1965, TEMA, Class R Tube Side Design Pressure 500 psig Design Temperature 400°F Materials Austenitic Stainless Steel Shell Side Design Pressure 150 psig Design Temperature 200°F Pressure Loss, 2,000,000 lb/h 10 psi Materials Carbon Steel
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-5 Revision 36 Page 1 of 1 SAFETY INJECTION TANK DESIGN PARAMETERS Quantity 4 Type Vertical Right Cylinder Design Pressure 250 psig Design Temperature 200°F Height 34 Feet 6 Inches Outside Diameter 9 Feet 2 Inches Material Carbon Steel With Type 304L Stainless Steel Clad
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-6 Revision 36 Page 1 of 2 CONTAINMENT SPRAY SYSTEM COMPONENT DESCRIPTION
- 1. Containment Spray Pumps Number of Units - 3 Type - Vertically Split, Horizontal Centrifugal With Mechanical Seals and Backup Packed Gland Material - 316 Stainless Steel Code - Motor, NEMA; Pump, Standards of the Hydraulics Institute, 11th Edition, 1965, ASA B31.1-1955; ASA B16.5-1961 Injection Recirculation Design Capacity (Each) 1,340 gpm 1,800 gpm Design Head 450 ft 405 ft Design NPSH Required 13.2 ft 17.8 ft Motor 250 hp, 3 Ph, 60 Hz, 2,300 V
- 2. Shutdown Cooling Heat Exchangers Number of Units - 2 Capacity (Each) - 83.5 x 106 Btu/h Based on 4,000 gpm of Cooling Water at 114°F Inlet Temperature and 1,420 gpm of Spray Water at 283°F Inlet Temperature
- 3. Piping, Fittings and Valves A. Suction Material - Type 304 Stainless Steel Pipe Sizes Wall Thickness 2" and Smaller Sch 40S 2-1/2" Through 12" Sch 10S 14" Through 20" 0.250" Nominal Wall 24" 0.375" Nominal Wall Design Pressure - 60 psig Design Temperature - 300°F Construction 2-1/2" and Larger - Butt-Welded Except at Flanged Equipment
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-6 Revision 36 Page 2 of 2 CONTAINMENT SPRAY SYSTEM COMPONENT DESCRIPTION 2" and Smaller - Socket Welded Except at Screwed Equipment Valves 2" and Larger - Stainless Steel, Butt-Welded, 150 lb 1-1/2" and Smaller - Stainless Steel, Socket Welded, 150 lb Testing - 100% Radiography of Welded Joints Code - ASA B31.1-1955 and Code Cases N2 and N10 B. Discharge Material - Type 304 Stainless Steel Pipe Sizes Wall Thickness 8" and Smaller Sch 40S 10" Through 14" 0.250" Nominal Wall Design Pressure - 500 psig Design Temperature - 350°F Valves 2" and Larger - Stainless Steel, Butt-Welded, 300 lb 1-1/2" and Smaller - Stainless Steel, Socket Welded, 600 lb Testing - 100% Radiography of Welded Joints Code - ASA B31.1-1955 and Code Cases N2 and N10
- 4. Spray Nozzles Type - Sprayco, Model 1713A Material - 304 Stainless Steel Number - 77 Nozzles on A Spray Header
- 83 Nozzles on B Spray Header
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-7 Revision 36 Page 1 of 2 CONTAINMENT AIR COOLER COMPONENT DESCRIPTION Coils (VHX-1, VHX-2 and VHX-3 Safety Related & VHX-4 Non-Safety)
Coils per Cooler Unit 4 Rows of Tubes per Coil 12 Face Area of Each Coil 20.54 ft2 Total Coil Face Area per Cooler Unit 82.16 ft2 Tubes per Row 36 Tube Description 5/8" OD Copper x 0.049" Wall Tube Design Pressure 150 psig Fin Description 3/8" High x .012 Thick Copper Plate with 9.4 Fins per Inch (Mechanical Bond)
Fans (V1, V2, V3 and V4)
Fan Speed 1,750 r/min Number of Fans per Cooler Unit 2 Motor Design Totally Enclosed Air Overcooled Insulation NEMA Class H for Fans Rated for the Post-DBA Condition NEMA Class B for Fans Rated for Normal Duty Rating 75 hp for Fans Rated for the Post-DBA Condition 30 hp for Fans Rated for Normal Duty Filters (VF-1, VF-2, VF-3, VF-4)
Capacity 60,000 ft3/min at 0.33" H2O Differential Pressure Drop (Clean) 0.33" H2O Size of Each Filter Module 19.25" x 19.25" x 1.75" Thick
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-7 Revision 36 Page 2 of 2 CONTAINMENT AIR COOLER COMPONENT DESCRIPTION Number of Filter Modules per Cooler Unit 32 Efficiency 65%
Type Stainless Steel Mesh, Framed
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-10 Revision 36 Page 1 of 2 ECCS COMPONENT SYSTEMS Piping - Stainless Steel-304 Valves - Stainless Steel or other equivalent corrosion resistant material Gaskets - Asbestos or Grafoil Grade GTTMB (eg, Flexitallic or Flexicarb) with 300 Series SS Component LP Pump HP Pump Spray Pump Casing ASTM A351 SS, ASTM A351 SS, SS, CF8M Mod CF8A Mod CF8 Impeller ASTM A217 SS, CF8 ASME SA 351, SS, CF8M Grade CA15 SS Casing Wear Ring ASTM A479, 17-4 PH SS, CF8M Gr S21800 Shaft A479, 316 SS AISI 416 316 SS Shaft Sleeve ASTM A479, 316 SS - 316 SS Gland Seal - - 316 SS Pumping Ring P-67A - Internal to - 18-8 SS Seal Cartridge P-67B -
18-8 SS on Shaft Sleeve Seal Cartridge 316 SS 316 SS 316 SS Face Seal Rotating Carbon 316 SS with Carbon Element Tungsten Carbide Face Seal P-67A - Silicon Carbon Tungsten Carbide Stationary Element Carbide P-67B - Tungsten Carbide Throttle Bushing P-67A - Bronze - Carbon P-67B - Carbon Backup Ring - Viton -
Valves and Piping 304 SS 304 SS 304 SS Gaskets Asbestos or Grafoil Asbestos or Grafoil Flexitallic with 300 Grade GTTMB Grade GTTMB Series SS (eg, Flexitallic (eg, Flexitallic Flexicarb) with Flexicarb) with 300 Series SS 300 Series SS
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-10 Revision 36 Page 2 of 2 ECCS COMPONENT SYSTEMS SHUTDOWN HEAT EXCHANGERS Component Material Head Gasket 304 SS Jacket Asbestos Tubes ASME SA 249, Grade TP-304 Tube Sheet Cladding 304 SS Channel Cover 304 SS Channel Partition ASME SA 240, Type 304 SS
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-12 Revision 36 Page 1 of 3 ISI MAJOR COMPONENTS AND/OR SYSTEMS LIST ASME CLASS 1 Components Reactor Pressure Vessel, N-50 Reactor Pressure Vessel Closure Head, N-50 Steam Generators - Primary Side, E-50A and E-50B Pressurizer, T-72 Regenerative Heat Exchangers, E-56A and E-56B Piping Primary Coolant System Engineering Safeguards System Chemical and Volume Control System Pumps Primary Coolant Pumps, P-50A, B, C, D Valves ASME CLASS 2 Components Safety Injection and Refueling Water Tank, T-58 Safety Injection Tanks, T-82A, B, C, D Steam Generators - Secondary Side, E-50A, B Regenerative Heat Exchangers, E-56A, B Shutdown Cooling Heat Exchangers, E-60A, B
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-12 Revision 36 Page 2 of 3 ISI MAJOR COMPONENTS AND/OR SYSTEMS LIST Piping Main Steam System Feedwater System Engineered Safeguards System Chemical and Volume Control System Component Cooling System Pumps Containment Spray Pumps, P-54A, B, C High-Pressure Safety Injection Pumps, P-66A, B Low-Pressure Safety Injection Pumps, P-67A, B SIRW Recirculation Pump, P-74 ASME CLASS 3 Components Letdown Heat Exchanger, E-58 Condensate Storage Tank, T-2 Component Cooling Surge Tank, T-3 Spent Fuel Pool Heat Exchangers, E-53A, B Component Cooling Heat Exchangers, E-54A, B Shutdown Cooling Heat Exchangers, E-60A, B Engineered Safeguards Room Coolers, VHX-27A, B Control Room Air Conditioning Units, VC-10, VC-11 Containment Air Coolers, VHX-1, 2, 3, 4 Condensate Storage Tank Heat Exchanger, E-27
DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS TABLE 6-12 Revision 36 Page 3 of 3 ISI MAJOR COMPONENTS AND/OR SYSTEMS LIST Piping Main Steam System Feedwater System Chemical and Volume Control System Service Water System Component Cooling System Spent Fuel Pool System Condensate System Diesel Jacket Water Cooling System Pumps Service Water Pumps, P-7A, B, C Auxiliary Feedwater Pumps, P-8A, B, C Fuel Pool Cooling Pumps, P-51A, B Component Cooling Pumps, P-52A, B, C Diesel Generator Cooling Pumps P-211A, B