ML21125A335

From kanterella
Jump to navigation Jump to search
5 to Updated Final Safety Analysis Report, Chapter 12, Figures
ML21125A335
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/14/2021
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21125A344 List: ... further results
References
PNP 2021-008
Download: ML21125A335 (3)


Text

FSAR CHAPTER 12 - CONDUCT OF OPERATIONS FIGURE 12-1 Revision 33 PALISADES NUCLEAR PLANT ORGANIZATION Site Vice President I

I I General Manager, Plant Director, Regulatory and Operations Performance Improvement Chemistry Emergency Planning Operations Training Site Projects and Maintenance Services Performance Improvement Radiation Protection Security Maintenance Production

FSAR CHAPTER 12 - CONDUCT OF OPERATIONS FIGURE 12-2 Revision 27 PLANT SPECIFIC TITLES FOR GENERIC TITLES LOCATED IN THE TECHNICAL SPECIFICATIONS Technical Specifications Generic Title Corresponding Plant Specific Title (Sections 5.1 and 5.2)

Plant Superintendent General Manager Plant Operations Shift Supervisor Shift Manager Individual providing advisory technical Shift Engineer support to the plant operations shift crew

FSAR CHAPTER 12 - CONDUCT OF OPERATIONS FIGURE 12-3 Revision 28 Deleted